Anybody buying Crystal Bay Marina (EG Site)

North Cyprus Forums Homepage

Join Cyprus44 Board | Already a member? Login

Popular Posts - List of popular topics discussed on our board.

You must be a member and logged in, to post replies and new topics.

» Read Crystal Bay Villas North Cyprus property review

» List of North Cyprus Estate Agents

» See All North Cyprus Estate Agent Related Threads

» Read about Port Cyprium Marina

» See all marina related threads in North Cyprus

» Read Port Cyprium Village property review



northernlad2


Joined: 19/12/2007
Posts: 150

Message Posted:
02/06/2008 11:27

Join or Login to Reply
Message 1 of 254 in Discussion

Hi All,

Had to post a new topic as other one had 250 messages that is all it can contain.



Hope you are all well our friend is back home in NC now and he is to update us on how dfevelopment and apartments are progressing.



If anyone has been out recently please let us know how your apartments are going.



Keith and sarah



northernlad2


Joined: 19/12/2007
Posts: 150

Message Posted:
06/06/2008 21:25

Join or Login to Reply
Message 2 of 254 in Discussion

Just had an update from me mate out in NC. He visited the site yesterday and says quite a few blocks look completed or close to being completed to this stage (can't quite believe it myself). He also says that they look as though they are marking out the areas for the pools and landscaping. Things are progressing nicely it seems.



He also sent us photos of our apartment, if anyone is interested in seeing them let us know and we wil attempt to put them on the MSN site for you.



Keith and Sarah



phoenix


Joined: 15/11/2007
Posts: 17

Message Posted:
06/06/2008 22:26

Join or Login to Reply
Message 3 of 254 in Discussion

Hi Keith



We were on site 2 weeks ago and yes there was lots of activity, especially on our penthouses ( block 1 L&R.selling one hopefully) so not too surprised when today we were asked for big payment. They do look very good and view from the roof spectacular.



Ken and Sue



northernlad2


Joined: 19/12/2007
Posts: 150

Message Posted:
07/06/2008 23:12

Join or Login to Reply
Message 4 of 254 in Discussion

hi ken and sue

Its great to be in touch with others on site. A friend did send a picture from our roof top , and i was impressed cannot wait to be holidaying in it .

sarah and keith



northernlad2


Joined: 19/12/2007
Posts: 150

Message Posted:
09/06/2008 11:07

Join or Login to Reply
Message 5 of 254 in Discussion

Ken and Sue,

Are you at CBM block A1 penthouse L & R, if so we will be neighbours.



Keith and Sarah



tonyhickey



Joined: 13/06/2007
Posts: 413

Message Posted:
12/06/2008 01:42

Join or Login to Reply
Message 6 of 254 in Discussion

Hi all

Just back from north cyprus, superb two week holiday vistied CBM site three times ,building work seems to be progressing very well. there were lots of workmen on site even at weekends. Visited the eagle nest bar and restarant which is just opposite the CBM site it turned out the owner is buying an apartment on CBM A6. Worth go for a drink and chat as he is keyed up on the up to date prices for CBM. The owner has got two or three photo albums of the wild flowers and animals of the area. Got chance to look at two or three furniture packages but we are not very impresssed , so decided to pick our own furniture and curtains after the handover. We visited quite a few shops and these three Fiskos Home design, Mermaid fabics and furniture, and Aysels at Alsancak and these three stood out for good quality furniture at very competive prices. Tony and Susan



Chris


Joined: 26/03/2008
Posts: 454

Message Posted:
12/06/2008 08:28

Join or Login to Reply
Message 7 of 254 in Discussion

We met the owner of Aysels when we were there last time-very genuine lady and her furniture is competetively priced(much to the annoyance of other shops) and exceptionally nice.

She was holding an exhibition when we met her, and she had nearly sold out!



Chris



northernlad2


Joined: 19/12/2007
Posts: 150

Message Posted:
13/06/2008 13:14

Join or Login to Reply
Message 8 of 254 in Discussion

Tony,

Nice to have you back its been a little quiet on here lately. Did you take any photos of the site when you were out there and is so are you able to post them for us to see how its progressing.



We went to the eagles nest when we were last over its a nice friendly place with great views and not to far from our site - I would say it could become our local - staggering distance home.



Thanks for the info regarding furniture we wil visit shops you mentioned when next over.



Chris thanks for your comments to. Very helpful.



Keith and Sarah.



tonyhickey



Joined: 13/06/2007
Posts: 413

Message Posted:
19/06/2008 01:24

Join or Login to Reply
Message 9 of 254 in Discussion

Hi all

Second week back at work ,Cyprus seems a long way away but its given us time to reflect about or visits to CBM. Firstly the construction work seems to be progressing at high speed the turkish workforce appear to be living on site. The work seems to be of a very high standard and on talks with the foreman he seems confident they will be finished off site by the end of the year. Whilst we were in Cyprus we visited four other building developments and CBM seem to shine out well above the others in postition, to the road and sea and the entrance road probably hundred per cent better than any other development. We also got chance to view the landscaping on other Evergreen sites and would be very happy for the same standard on CBM site. Just one other thing if anybody is going out to Cyprus in the new year Monarch airlines have got a good sale on from Manchester to Laranaca at £193-96 for two people return, on a Saturday flight. Hopefully on this visit we hope to buy the furniture for the apartment.

Tony and Susan



northernlad2


Joined: 19/12/2007
Posts: 150

Message Posted:
12/07/2008 11:04

Join or Login to Reply
Message 10 of 254 in Discussion

hi all evergreenies

were is everone hiding.

I guess no news is good news.

Hope to speak to you all soon

sarah and keith



TonyJ


Joined: 18/02/2008
Posts: 34

Message Posted:
12/07/2008 12:48

Join or Login to Reply
Message 11 of 254 in Discussion

Hi Sarah and Keith et al



I will be going to Cyprus in August, so if anybody needs any photos etc.. I wll gladly take them.



I wll be travelling to CBM from the south, so does anyone have any tips, directions etc.. for driving across the border in a hire car from the Protaras area?



Many thanks



Tony J



markcbm


Joined: 20/11/2007
Posts: 115

Message Posted:
12/07/2008 13:11

Join or Login to Reply
Message 12 of 254 in Discussion

Hi all



where going out later this month for two weeks cant wait but just put new post on ref the marina....... crystal bay (No) marina check the post see what you think



best to all



Mark and Joy



northernlad2


Joined: 19/12/2007
Posts: 150

Message Posted:
12/07/2008 19:52

Join or Login to Reply
Message 13 of 254 in Discussion

hi all

not good news about marina , its marketed as if its a deal !!!!

we keep looking at http://www.port-cyprium-marina.com to see if any up dates

great to hear from other evergreenies its so queit . We are not going out this summer, waiting until we have to .

so any photos of site would be great.

We do get regular up dates from friend in nc. Will ask what hes heard about marina

hope you all have a good weekend

tony are you out there

sarah and keith



tonyhickey



Joined: 13/06/2007
Posts: 413

Message Posted:
13/07/2008 04:53

Join or Login to Reply
Message 14 of 254 in Discussion

hi all

Yes it has been very quiet lately. Not much to do but save the money up Its difficult not really Knowing what the final price for the apartments with the add-ons i.e., electric and water connection communal chargers will be. Decided not to buy any furnishing until all other bills are paid .Hopefully we will be in a position to furnish the apartment when we go over in march next year for the coming summer. Hope to stop at the ship inn have read some excellent reports about the hotel plus they have a indoor pool which could be very useful so early in the year .afraid cant help with the border crossing hell we could not find the crossing in Nicosia with three maps. Any pictures off the site would be most welcome hopefully this time next year the complex and the beers will be up and running

Tony Susan



Geoff1131


Joined: 12/07/2007
Posts: 276

Message Posted:
13/07/2008 08:08

Join or Login to Reply
Message 15 of 254 in Discussion

Hi all dont know if this helps at all, but i bought on CBV from evergreen and if your costs are anything like ours you will be looking at around £6000 in extra costs before you will be given your key. Thats how it worked out at CBV electric connection was around £1500 water deposit £500 landscaping/pool furniture £1000 vat £2000 and then there is the first years payment to lynx for maintenance, another £1000. Hope this helps, it was a bit of a shock to me when i moved, because i had not been told, its better to know and be prepared.Geoff.



northernlad2


Joined: 19/12/2007
Posts: 150

Message Posted:
14/07/2008 21:50

Join or Login to Reply
Message 16 of 254 in Discussion

Hi all

Friend visited site , said they seem to be concentrating on blocks about 6 look completed at moment.

Asked about marina he said all over local press but stressing it will go ahead, alot to do with ancient ruins .

Thanks geoff for extra prices it is better to have some idea lol or is it !!!!!! they do seem alot .

Well we are saving and working hard to get extra monies together.

speak soon

sarah and keith



northernlad2


Joined: 19/12/2007
Posts: 150

Message Posted:
15/07/2008 00:06

Join or Login to Reply
Message 17 of 254 in Discussion

hi again

should read all but 6 blocks complete on site .

sarah



tonyhickey



Joined: 13/06/2007
Posts: 413

Message Posted:
02/08/2008 14:09

Join or Login to Reply
Message 18 of 254 in Discussion

HI. Suntanman, Just heard that you have recieved your ptp, could you please advise me if you have paid your vat yet . I am buying on crystal bay marina and still waiting for completion. Tony.



suntanman



Joined: 18/04/2007
Posts: 721

Message Posted:
02/08/2008 14:11

Join or Login to Reply
Message 19 of 254 in Discussion

Tony,

There was no request for VAT payment with the email, but I believe it is due on transfer of title.

I will let you know.



Are you still having problems uploading photos on msn site?



Andrew



suntanman



Joined: 18/04/2007
Posts: 721

Message Posted:
04/08/2008 17:18

Join or Login to Reply
Message 20 of 254 in Discussion

Tony,

Possibly a misunderstanding on my previous post.

We paid 5% VAT to Evergreen on final payment, however there is also 3% land registry to pay on transfer of deeds, which is now due.

Our advocate also wants another £400 to transfer deeds to our names!

Hopefully this is the end of payments, my money tree at the back of the garden is looking very poorly.



gd427man


Joined: 05/08/2008
Posts: 68

Message Posted:
05/08/2008 16:02

Join or Login to Reply
Message 21 of 254 in Discussion

Hi Folks, new member here.

New to this forum lark.

Wondered if anyone on cbm dev have any keys yet.

I will be out there in September and wndered about staying on the site. I have A10 ground but don't think it will complete yet.

Does anyone have one nearby that we could rent?

I will bw arranging to meet up with Evergreen to discuss dates payments and handover etc.

Will post any info I have for all when I return.

Cheers



tonyhickey



Joined: 13/06/2007
Posts: 413

Message Posted:
05/08/2008 16:15

Join or Login to Reply
Message 22 of 254 in Discussion

Hi gd427man ,we were there on cbm dev in June this year and have been told completion of site ,pools etc will be finished around December 2008 and then we will be able to pay final payment to Evergreen and have possession of our keys. I am buying b5 ground floor left and the apartment is finished when when we were there in June 2008.Excellent standard of finish no complaints, and brillant view and a foreman on site who speaks good english and very helpful. TONY.



gd427man


Joined: 05/08/2008
Posts: 68

Message Posted:
05/08/2008 16:52

Join or Login to Reply
Message 23 of 254 in Discussion

tony,

that's great news.

I will try to contact evergreen and see if we can stay in our apartment if we buy a bed. (Don't know if this is likely)

Have you been offered any white goods pacages etc?



corbytown


Joined: 05/08/2008
Posts: 327

Message Posted:
05/08/2008 22:24

Join or Login to Reply
Message 24 of 254 in Discussion

hello gd427man



i am also a new member



i have A10 pl and was out there in May. I had a look in a few apartments and i would not think that you would be able stay in them. I would not think you would have water or electric for a start.

i am also out there in september and staying in an apartment next to the Moulos Inn, which is virtually across the road.

Be nice to meet up one day for a drink or two to discuss being "neighbours"



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
05/08/2008 23:06

Join or Login to Reply
Message 25 of 254 in Discussion

Hi all,

Had a message from NT toady with update on site. Our friend who visited the site today sent us the following.



Looks like all apartments are finished, ground has been marked out for pools etc and there has been a huge delivery of patio tiles. Also sent us some fotos that we will try to post.



Its nice to know thta things appear to be progressing well.



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
05/08/2008 23:06

Join or Login to Reply
Message 26 of 254 in Discussion

Hi all,

Just had an update from our friend who lives in NT. He visited the site today and sent us the following:



Most apartments look finished,Ground has been marked out for the pools etc and there has been a huge deliveryof patio tiles.



Nice to know things are apparently progressing well on the site.



Keith and Sarah



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
05/08/2008 23:07

Join or Login to Reply
Message 27 of 254 in Discussion

Update today



All apartmenmts appear finished. Have been marking out pools etc. and a huge delivery of patio tiles have arrived on site.



Keith and Sarah



tonyhickey



Joined: 13/06/2007
Posts: 413

Message Posted:
06/08/2008 01:45

Join or Login to Reply
Message 28 of 254 in Discussion

Hi. gd427man We have not been offered any white good packages from Evergreen yet but are hoping to buy the a white goods package from the Frank and Joan website as the prices seem very reasonable and are bosch make and Frank makes sure they are fit properly for the customer before any monies are handed over. Tony.



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
06/08/2008 10:08

Join or Login to Reply
Message 29 of 254 in Discussion

hi corbytown and gd427man

we are buyinying a2 but dont expect to be out until next year welcome to the forum. we havent heard anything about white goods but will be looking aroundand as tony says franks site seem really resonable .



Hi Tony

hope you are well

very quiet on evergreen threads just working hard to save for any extra payments lol

sarah and keith



gd427man


Joined: 05/08/2008
Posts: 68

Message Posted:
06/08/2008 17:47

Join or Login to Reply
Message 30 of 254 in Discussion

Hi Corbytown, (and others)

Yes we are neighbours.

Hope you have quiet shoes as you will be walking above me !

I also have an e-mail of the man next door to me if you want it.

Would be good to meet up if possible we are flying out on the 15th for two weeks.

looking for somewhere cheap to stay at the moment

can anyone help?

Will check out the frank and joan website soon.

Maybe some of us could buy in bulk for a adiscount?

Cheers



gd427man


Joined: 05/08/2008
Posts: 68

Message Posted:
12/08/2008 14:56

Join or Login to Reply
Message 31 of 254 in Discussion

Where has everyone gone. Its all gone quiet.

Is Corbytown out there. When are you travelling out?

Would be great to mmet you.

Can anyone help with cheap accommodation?

Cheers



tonyhickey



Joined: 13/06/2007
Posts: 413

Message Posted:
12/08/2008 16:35

Join or Login to Reply
Message 32 of 254 in Discussion

Dear gg427man We stayed at Almond village in ALANSCACK NEAR LAPTA,when we visited in June 2008 this year. Also THE SHIP INN is very reasonably priced. Tony



gd427man


Joined: 05/08/2008
Posts: 68

Message Posted:
12/08/2008 19:04

Join or Login to Reply
Message 33 of 254 in Discussion

Thanks.

Stayed at the ship Inn last year in November and liked it.

I have sent them an e-mail but not had a reply.

Will try the almond village and see how it compares.

thanks.



tonyhickey



Joined: 13/06/2007
Posts: 413

Message Posted:
12/08/2008 20:03

Join or Login to Reply
Message 34 of 254 in Discussion

Almond village is a good hotel food brilliant hotel clean and spotless and they cant do enough for you. They picked us up from Larnaca airport on time and had a safe journey home. Tony.



corbytown


Joined: 05/08/2008
Posts: 327

Message Posted:
12/08/2008 21:25

Join or Login to Reply
Message 35 of 254 in Discussion

hello gd427man



we are there the first two weeks so unfortunately we will miss each other, another time maybe.

We stayed in the prince hotel in may which is just up from the ship, the manager is called marcus, ask him he might do you a deal !



gd427man


Joined: 05/08/2008
Posts: 68

Message Posted:
14/08/2008 11:24

Join or Login to Reply
Message 36 of 254 in Discussion

Thanks for your help.

Sorry we are missing you. corbytown.

I will try the Prince as I have tried almond village and they are fully booked.



Thanks again.

Cheers for now.



gd427man


Joined: 05/08/2008
Posts: 68

Message Posted:
15/08/2008 10:26

Join or Login to Reply
Message 37 of 254 in Discussion

I just noticed there is one new photo on the evergreen crystal bay marina construction update site.

Roads being built by the look of it.

Cheers.



tonyhickey



Joined: 13/06/2007
Posts: 413

Message Posted:
15/08/2008 17:54

Join or Login to Reply
Message 38 of 254 in Discussion

brillant progress hope it is well worth the wait.



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
17/08/2008 18:27

Join or Login to Reply
Message 39 of 254 in Discussion

Hi all,

I agree nice to see progress, looks like a road and perhaps parking.

Still on track for completion by December, apparently.



We can't wait till next year.



Keith and Sarah.



TonyJ


Joined: 18/02/2008
Posts: 34

Message Posted:
24/08/2008 21:25

Join or Login to Reply
Message 40 of 254 in Discussion

Hi all



just come back from CBM to check on Block B9 and am very impressed with the quality, location and decor...as good as anything on the Kyrenia coast road.



On the site they seem to be concentrating on the access roads and some blocks to the front, rear and left of the proposed swimming pool/ restaurant area (still chalk marks in the rubble!).



I spoke to the owner of the Eagles Nest restaurant, located on the cliffs directly in front of CBM, who was equally impressed with the quality. Apparently, he used to own the CBM land and now has four CBM apartments!



I shall be uploading some photos and perhaps a short video in the near future.



Regards



Tony



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
26/08/2008 18:16

Join or Login to Reply
Message 41 of 254 in Discussion

hi tony j

hope you had a great holiday , good to hear news about site.



look forward to seeing the photos



sarah and keith



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
31/08/2008 13:40

Join or Login to Reply
Message 42 of 254 in Discussion

hi tony j

looked at photos your apartment looks great.

We are impressed at the distance to eagles nest , not far to walk home ?

can not wait to get out ourselves especially with all the sun we our getting in england lol



hi to all evergreenies were is everyone ?



sarah and keith



roversnan


Joined: 20/05/2007
Posts: 81

Message Posted:
31/08/2008 14:31

Join or Login to Reply
Message 43 of 254 in Discussion

Hi all

haven't posted in a while but keep reading and saving and saving. I think we are going to have to just to pay the electric bill lol.

Tony J your photos are great and will be taking some ourselves very very soon.



Hi Sarah and Keith hope you are both well



Lyn and Rob



TonyJ


Joined: 18/02/2008
Posts: 34

Message Posted:
01/09/2008 00:10

Join or Login to Reply
Message 44 of 254 in Discussion

Hi all



I'm glad you like the photos, I'm sure they are represenatative of all the blocks.



Can't wait to see the whole complex finished...



Has anyone got any news about the next stage?



Kind regards



TonyJ



markcbm


Joined: 20/11/2007
Posts: 115

Message Posted:
01/09/2008 00:25

Join or Login to Reply
Message 45 of 254 in Discussion

Hi all



blast from the past here pictures wicked thanks again was there in july looks so good roads just being marked out,



had internet set up this time we were there so will be taking lap top in couple of weeks time going out from 15th sep to 16th oct so will keep you all up to date best i can while we are there



love to you all



Mark and Joy



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
01/09/2008 13:58

Join or Login to Reply
Message 46 of 254 in Discussion

hi all

hello mark and joy , i bet you can not wait to get out to the sun , look forward to the pictures.

no news on the next stage? expect to only hear when next payment due lol

hi lyn and rob

we are fine like you keep looking for news but all gone quiet, are you out soon , we are still saving hard but not worried us we have a wind up torch so thats the electric sorted.

Back to work wednesday can not believe the summers holiday are over.Still next year hopefully be in cyprus?



have been reading the threads on marina so hopefully will be some progress there

hello to all evergreens

sarah and keith



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
02/09/2008 16:20

Join or Login to Reply
Message 47 of 254 in Discussion

Looking forward to seeing all this summers holiday snaps of the site and apartments.



Keith



roversnan


Joined: 20/05/2007
Posts: 81

Message Posted:
02/09/2008 21:54

Join or Login to Reply
Message 48 of 254 in Discussion

Hi Mark an Joy



Robs just bought me a laptop so hope you don't mind me asking, which provider are you using.

Please don't blind me with science I'm not that good on computers lol



Lyn



tonyhickey



Joined: 13/06/2007
Posts: 413

Message Posted:
07/09/2008 12:56

Join or Login to Reply
Message 49 of 254 in Discussion

Hi everyone. Has anybody buying through Evergreen Developments managed to obtain their deeds yet (kockan) and if they have did they have any problems along the way,ie. extra fees etc. many thanks. Tony Hickey.



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
07/09/2008 19:32

Join or Login to Reply
Message 50 of 254 in Discussion

Hi tony

We have not heard anything from anyone !!!!!!!!



hope you are well , very quiet on here , a few people going over soon so hopefully will get some more news.



we have family going out end of sept so will have some more news about site



can not wait until next summer really fed up with all this rain

sarah and keith



markcbm


Joined: 20/11/2007
Posts: 115

Message Posted:
07/09/2008 20:21

Join or Login to Reply
Message 51 of 254 in Discussion

Hi Lyn we are with aol not sure if there the best though, its been ok for a while but has been pain in past,

when do you hope to get to trnc



mark



roversnan


Joined: 20/05/2007
Posts: 81

Message Posted:
07/09/2008 21:09

Join or Login to Reply
Message 52 of 254 in Discussion

Hi Mark,



I have aol on my desktop which crashes now and then, but haven't added the laptop yet.

We will be arriving in trnc tomorrow night yes!!!!!!!!!!



Lyn



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
09/09/2008 01:11

Join or Login to Reply
Message 53 of 254 in Discussion

lyn



have a great hoilday !!!



mind the sun lol we are not use to here in england



sarah



gd427man


Joined: 05/08/2008
Posts: 68

Message Posted:
09/09/2008 16:21

Join or Login to Reply
Message 54 of 254 in Discussion

Hi all,

I see Mark & Joy will be out there from the 15th.

so will we. We are staying at the Prince inn recommended by corbytown above, and came up trumps with the price.

Can't wait to see the apartments.

If you get to read this before you leave perhaps we could arrange a meet.

We will be going to the eagles nest to check it out for the future as its so near.

We could do lunch one day. - My e-mail is ianfm@talktalk.net -

I'm going to be contacting evergreen soon to see if we should be looking at furniture yet and may try to contact frank & Joan.

Cheers for now.



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
10/09/2008 19:26

Join or Login to Reply
Message 55 of 254 in Discussion

hi gd427man



have a great holiday



sarah and keith



pg42go


Joined: 10/09/2008
Posts: 1

Message Posted:
10/09/2008 21:43

Join or Login to Reply
Message 56 of 254 in Discussion

Hi All,

My name is Phil and I have also bought at Crystal Bay. I already know gd427man and that he is going out there in the next few days. It seems that mark and Joy will be out there also, so if you wouldn't mind letting me know how the complex is progressing I would be very grateful.



Safe flight and great holiday to all,



Phil



gd427man


Joined: 05/08/2008
Posts: 68

Message Posted:
01/10/2008 19:45

Join or Login to Reply
Message 57 of 254 in Discussion

Had a great holidy with excellent food.

visited the site and its going well.

The last few blocks are being built and even one of the pools has been started.

All the units etc were finished in our block (A10) and in all the back two rows.

Thought the units looked a little dark though.

looks as if they were putting in drainage / water pies etc.

Progress is good and evergreen told us that they expect to start the handovers early next year.

Started looking at furniture packages and do have some info on companies if anyone is interested.

Took a video of inside the apartment but havn't had time to download yet.

Also saw a newspaper article that said that the marina was going ahead aftrer complaints to stop it due to the dept of antiquities finding historical stuff on the site had been dropped.

Anyone heard anything? I saw it in Cyprus Today paper.



Cheers for now



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
03/10/2008 19:20

Join or Login to Reply
Message 58 of 254 in Discussion

hi ian

Glad to hear you had a great holiday.



We have been told the marina is going ahead they also read it in the paper, we have been told looks as if electric cables also going in.

cannot wait to see video .

We have at some family out looking at site they were impressed with the apartments.

sarah and keith



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
03/10/2008 19:23

Join or Login to Reply
Message 59 of 254 in Discussion

hi lyn

are you back did you have a good holiday



sarah



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
06/10/2008 22:31

Join or Login to Reply
Message 60 of 254 in Discussion

can some put msm web site for crystal buyers on here as i cant find it

ta sarah



suntanman



Joined: 18/04/2007
Posts: 721

Message Posted:
06/10/2008 22:43

Join or Login to Reply
Message 61 of 254 in Discussion

Sarah, long time no contact, how's it going?



http://groups.msn.com/crystalbayviewnorthcyprus



Regards

Andrew



suntanman



Joined: 18/04/2007
Posts: 721

Message Posted:
06/10/2008 22:51

Join or Login to Reply
Message 62 of 254 in Discussion

Tony,

Re message 49,

We have received our PTP, and are going through the process of transfering title deeds to our name.

Solicitor/Advocate wants another £400 for this process (we thought it was included in original price).

Andrew



tonyhickey



Joined: 13/06/2007
Posts: 413

Message Posted:
07/10/2008 02:08

Join or Login to Reply
Message 63 of 254 in Discussion

Hi Suntanman Thanks for your message, hope everything goes well I am still waiting for my PTP. I paid 1200 pounds to my advocate at begining so hope that includes the fee for transfering title deeds. Never know these days I will just have to wait and see. Tony.



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
08/10/2008 00:35

Join or Login to Reply
Message 64 of 254 in Discussion

Hi Andrew

Thanks

glad to hear you are in the process of getting your ptp. We understand that this was included in price also !!!

how are are holidays going , we cannot wait aiming for next summer

still saving for that big electric bill lol



hi tony hope you are well

sarah



suntanman



Joined: 18/04/2007
Posts: 721

Message Posted:
08/10/2008 13:14

Join or Login to Reply
Message 65 of 254 in Discussion

Sarah,

We are so pleased with our purchase. There are one or two teething problems with CBV but am sure will be resolved in time.

Going over again this Sunday for a couple of weeks, is there anyone from CBM there? there's a few of us meeting at the Moullos on Tuesday evening.

We finally managed to transfer electric in to our names last time,it had gone up to 837YTL, and there were rumours that it was to be increased to 1200, don't know how true that is.



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
08/10/2008 22:14

Join or Login to Reply
Message 66 of 254 in Discussion

Andrew,

My mum and sister were out recently and they are very pleased with the workmanship and finish of our apartment so far, they think the site is progressing well, but don't think it will be finished this year (more time to save lol).



We don't know if anyone from CBM is over at the moment, but if they see this message I am sure they would like to meet up at Moullos, as I understand it is quite close to our site.



I understand that costs are going up everywhere but the electricity connection prices are rising there in an almost ridiculous way - I dont know how the locals are coping or am I being niave at these prices are just for ex pats?



I am sure we will be seeking advice from yourself, who has gone through this process as it gets closer to the handover of our apartment and site.



Have an Efes or two for us when you get back over.



Speak soon.



Keith and Sarah



tonyhickey



Joined: 13/06/2007
Posts: 413

Message Posted:
09/10/2008 01:48

Join or Login to Reply
Message 67 of 254 in Discussion

Suntanman, Hope you have a good holiday, cant wait till we go out in March 7 2009, hopefully CBM WILL BE FINISHED and handover complete at last. Tony



tonyhickey



Joined: 13/06/2007
Posts: 413

Message Posted:
12/10/2008 01:30

Join or Login to Reply
Message 68 of 254 in Discussion

Hi, wine man We are buying on Crystal Bay Marina B5 Ground Left, and are going out in March 2009 for a week, hoping to purchase furniture and white goods. Hopefully the site should be completed and keys and Handover should be no problem. We went out in June this year and looked at several furniture packages and found them very cheap and nasty, so the plan is to visit several different shops and concoct our own furniture package, working on the assumption that a comfortable bed and settee are an essential part of life. tony susan



daily


Joined: 01/01/2008
Posts: 84

Message Posted:
12/10/2008 02:43

Join or Login to Reply
Message 69 of 254 in Discussion

There's a fabulous little shop up in esentepe on the corner before the grocer's at the top of the village - it's on the right near the betting shop - run by a lovely local family. I bought a three piece suite - 2 three seaters and one 2 seater (all with storage space beneath, huge and they all fold down into beds) for £800 last year. They delivered it and put it all together for me. They get a lot of their stock from Turkey - I am delighted with it! Don't just go on what is in their window as they have a huge warehouse further up in the residential part of the village that they will show you. Good luck furniture hunting!



tonyhickey



Joined: 13/06/2007
Posts: 413

Message Posted:
20/10/2008 03:42

Join or Login to Reply
Message 70 of 254 in Discussion

Hi Everyone, Anybody any news or updates on how cbm is progressing or any photos. Tony.



Groucho



Joined: 26/04/2008
Posts: 7993

Message Posted:
20/10/2008 06:58

Join or Login to Reply
Message 71 of 254 in Discussion

Tony,



The Turkish idea of a comfy sofa is very often different than the UK variant. Make sure you test out the comfort before you order yours... The people in the shop in Esentepe are really nice people (the sign above the door says Duzey as it used to belong to a zanussi - chigo dealership).



tonyhickey



Joined: 13/06/2007
Posts: 413

Message Posted:
29/10/2008 01:20

Join or Login to Reply
Message 72 of 254 in Discussion

Hi all Still wondering if there is any new pictures or videos of the Crystal Bay Marina site from summer visits, we are not going out again until March 2009. If anybody is having trouble on the old MSN Crystal Bay Site I have opened up our own Cystal Bay Marina site on Mutiply , the web address is below the new site makes the down loadings of pictures and videos very easy, even for a person like myself who is not computer literate.

tony http://athickey.multiply.com/



roversnan


Joined: 20/05/2007
Posts: 81

Message Posted:
29/10/2008 16:53

Join or Login to Reply
Message 73 of 254 in Discussion

Hi All



I have some pictures from September holidays and will put them on later, or I will try anyway lol. We were very impressed with the progress so far and visited the site 4 times. The bricks had been delivered for footpaths etc and work had started on the pool. Also went to Evergreen and Nurten said it was on target for December finish. I smiled and said "no way" . She then said " well probably January". There are still a few shells to finish yet, but I don't know how quickly they work ha ha.

Hope you are all well.

Lyn



suntanman



Joined: 18/04/2007
Posts: 721

Message Posted:
29/10/2008 23:55

Join or Login to Reply
Message 74 of 254 in Discussion

Hi all,

Just returned from TRNC, had a fantastic two weeks, unfortunately didn't meet anyone from CBM while we were there (missed a good night at the Moulos)

Had a trip to see CBM, it's coming along nicely, however looking at the work to be done to the site, I don't think January 2009 is a realistic target for completion. The pools are under construction, and most blocks are complete, but after that stage there is the job of installing pipework for sewerage etc.

Thinking back to our development (CBV) it was at least 6 months from when they started that process to completion/handover. Please don't rely on stimated completion dates too much, as we were let down several times by these!

Trust me, it will be well worth the wait, although I know what you are all going through at the moment, and are all eager to take possession of your new homes.

To sit back on your patio with the first cold Efes is an amazing moment.

Regards

Andrew



suntanman



Joined: 18/04/2007
Posts: 721

Message Posted:
30/10/2008 00:02

Join or Login to Reply
Message 75 of 254 in Discussion

I forgot to add, the msn site which I set up is closing down, I have transferred all previous posts and photos to http://crystalbaytrnc.multiply.com/



tonyhickey



Joined: 13/06/2007
Posts: 413

Message Posted:
30/10/2008 14:17

Join or Login to Reply
Message 76 of 254 in Discussion

http://crystalbaymarina1.multiply.com/

Just to show, i am just not quite computer literature i put the wrong link for the Crystal Bay Marina Site this is the new one, nobodys perfect.

tony http://crystalbaymarina1.multiply.com/



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
01/11/2008 13:01

Join or Login to Reply
Message 77 of 254 in Discussion

hi all

glad you had good holidays andrew and lyn. I am just hoping to be in apartment for my summer holidays so any time before will be a bonus lol

will try and get back on msm site was having trouble just thought it was me !!!!!!!

If any one gets any imformation about site would look forward to recieving it dont mind emails

it gone very quiet on here about

sarah and keith



roversnan


Joined: 20/05/2007
Posts: 81

Message Posted:
01/11/2008 22:37

Join or Login to Reply
Message 78 of 254 in Discussion

Hi all

Have put some photos on http://crystalbaymarina1.multiply.com/

it took me ages, but just click on photos and they should be there.



Does anyone know where the dishes for the internet and tv will go.

I did email evergreen about putting in the wiring (if you need any)

but they never replied.



lyn and rob



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
02/11/2008 22:32

Join or Login to Reply
Message 79 of 254 in Discussion

Lyn and Rob,

Thanks for the photographs the site is moving along nicely, the new site looks pretty good.



Anybody been looking at white goods packages?





Keith



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
05/11/2008 21:41

Join or Login to Reply
Message 80 of 254 in Discussion

hi tony

enjoyed the photos

thanks

sarah and keith



tonyhickey



Joined: 13/06/2007
Posts: 413

Message Posted:
05/11/2008 22:38

Join or Login to Reply
Message 81 of 254 in Discussion

Hi all

I would assume the dishes for the internet and tv will go in the service area on the roof. We have just been thinking ourselves about white goods and decided to contact evergreen to ask about there prices

tony



roversnan


Joined: 20/05/2007
Posts: 81

Message Posted:
06/11/2008 20:59

Join or Login to Reply
Message 82 of 254 in Discussion

Hi all

Tony - We went onto the roof in September, but to get there you had to go through the penthouse apartment, which was why I emailed Evergreen so that any wiring could be done before handover. Mind you I have limited experience with anything electrical lol.

Furniture we liked Olguns and curtains Mermaid Fabrics so far. Good idea to contact Evergreen about white goods as they will know the sizes we need.



MSN is looking good.

Lyn



roversnan


Joined: 20/05/2007
Posts: 81

Message Posted:
06/11/2008 21:26

Join or Login to Reply
Message 83 of 254 in Discussion

Whoops I meant the new site lol

Lyn



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
10/11/2008 16:57

Join or Login to Reply
Message 84 of 254 in Discussion

Tony,

Let us know when you here from Evergreen about white goods packages.



Keith and Sarah



gd427man


Joined: 05/08/2008
Posts: 68

Message Posted:
10/11/2008 19:40

Join or Login to Reply
Message 85 of 254 in Discussion

Hi all,

I spoke to Nurten from evergreen in Sept regarding white goods and she said that they looking to Bosch as their supplier but would not give prices until nearer completion due to fluctuation in exchange rate etc.

Cheers

Ian.



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
16/11/2008 18:33

Join or Login to Reply
Message 86 of 254 in Discussion

Hi all



thanks gd427man will just have to wait until nearer to completion



hope everyone is fine cannot wait to get out to the sun , wet and cold in surrey

sarah



tonyhickey



Joined: 13/06/2007
Posts: 413

Message Posted:
21/11/2008 21:58

Join or Login to Reply
Message 87 of 254 in Discussion

HI all

Some new pictures of crystal Bay Marina now on line. The walls round look the site look well.

Also the white goods package is in the process of being prepared and will be send out in due course.

tony

http://crystalbaymarina1.multiply.com/



tonyhickey



Joined: 13/06/2007
Posts: 413

Message Posted:
22/11/2008 01:01

Join or Login to Reply
Message 88 of 254 in Discussion

HI all



Some new pictures of crystal Bay Marina now on line. The walls round the site look well.



Also the white goods package is in the process of being prepared and will be send out in due course.



tony



http://crystalbaymarina1.multiply.com/



roversnan


Joined: 20/05/2007
Posts: 81

Message Posted:
22/11/2008 08:26

Join or Login to Reply
Message 89 of 254 in Discussion

Hi Tony



Pictures look great, there is such a difference in just 2 months. Thanks for the white goods info. Hope you are all well.



Lyn



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
22/11/2008 21:26

Join or Login to Reply
Message 90 of 254 in Discussion

Tony,

Site are looking great and really coming on, when were these last one taken?



Look forward to hearing about the white goods packages, hope the prices are reasonable.



Speak soon.



Lyn, hope you are well.



Keith and Sarah



tonyhickey



Joined: 13/06/2007
Posts: 413

Message Posted:
23/11/2008 13:17

Join or Login to Reply
Message 91 of 254 in Discussion

Hi All Sorry cant give a date for these pictures the only information I have from Miss Nurten is that they are the latest pictures that Evergreen have. Tony and Susan.



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
24/11/2008 10:51

Join or Login to Reply
Message 92 of 254 in Discussion

Tony,

Thanks very much its still nice to see things are moving along.



Keith



corbytown


Joined: 05/08/2008
Posts: 327

Message Posted:
28/11/2008 21:04

Join or Login to Reply
Message 93 of 254 in Discussion

hello all

we have received the final balance due by the end of December, has anyone else received theirs ?



roversnan


Joined: 20/05/2007
Posts: 81

Message Posted:
28/11/2008 21:42

Join or Login to Reply
Message 94 of 254 in Discussion

Hi corbytown

yes we received our final balance today. Are we supposed to pay the vat yet?



lyn



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
29/11/2008 12:49

Join or Login to Reply
Message 95 of 254 in Discussion

Hi all,

We received ours today a bit of a shock as I didn't expect to pay the vat so soon, can anyone tell me what the vat % is in trnc.



Keith



tonyhickey



Joined: 13/06/2007
Posts: 413

Message Posted:
29/11/2008 14:15

Join or Login to Reply
Message 96 of 254 in Discussion

Have put information from H.P.G site ON VAT on crystal Bay Marina site

crystalbaymarina1_multiply_com.htm

tony



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
29/11/2008 14:27

Join or Login to Reply
Message 97 of 254 in Discussion

Thanks tony

was not expecting final bill to be so soon , we are asking a friend to look at site who lives out in nc will feed back any news

sarah



tonyhickey



Joined: 13/06/2007
Posts: 413

Message Posted:
29/11/2008 18:54

Join or Login to Reply
Message 98 of 254 in Discussion

Hi All Just got the second e-mail from Evergreen stating the amount of money due,cannot make head or tails of the figures does any one else have any understanding of these. Tony.



roversnan


Joined: 20/05/2007
Posts: 81

Message Posted:
29/11/2008 19:37

Join or Login to Reply
Message 99 of 254 in Discussion

Hi

No I'm not sure either I thoughtit was me. Whats " Stage Payment Interest "

and if its not paid by the end of December you have to

pay an extra £500. I will email Nurten on Monday.

Lyn



tonyhickey



Joined: 13/06/2007
Posts: 413

Message Posted:
29/11/2008 23:27

Join or Login to Reply
Message 100 of 254 in Discussion

Hi again

Have just just put the final bill from Evergreen on our web site, if any body has recived a similar final statement ,Could someone please explain it to a thick o

tony http://crystalbaymarina1.multiply.com/



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
30/11/2008

Join or Login to Reply
Message 101 of 254 in Discussion

hi tony

dont understand interest on payment if we are paying on time !!!

Do we pay vat when all the site is up and running with electric etc

i think as site is ready early we should not have to pay collection charges if paid after jan .

please keep in touch , put our payments on your multiply page

sarah



roversnan


Joined: 20/05/2007
Posts: 81

Message Posted:
30/11/2008 11:15

Join or Login to Reply
Message 102 of 254 in Discussion

Hi

Have looked for your payments on multiply so I could put mine on sarah but can't find them. Is it me being dim? probably lol.

I'm thinking of using Stuart Hillard for snagging, has anyone his email address please.

Lyn



corbytown


Joined: 05/08/2008
Posts: 327

Message Posted:
30/11/2008 11:29

Join or Login to Reply
Message 103 of 254 in Discussion

For a start Tony

What currency is your final bill in ???



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
30/11/2008 11:42

Join or Login to Reply
Message 104 of 254 in Discussion

A friend of ours living in NC is visiting the site today and is going to let us know what is left to complete there, I cannot beleive that the site will be ALL complete as per contracts looking at the most recent pictures we have seen, will post an update from NC as soon as I get it.



Corbytown our bill is in sterling.



Keith and Sarah



corbytown


Joined: 05/08/2008
Posts: 327

Message Posted:
30/11/2008 11:49

Join or Login to Reply
Message 105 of 254 in Discussion

Take a look at tonys



tonyhickey



Joined: 13/06/2007
Posts: 413

Message Posted:
30/11/2008 11:51

Join or Login to Reply
Message 106 of 254 in Discussion

hi all

corby .Our bill should be in uk pounds ,Lyn go to http://crystalbaymarina1.multiply.com/ its on photos, bill????

Let me know what you think

tony



corbytown


Joined: 05/08/2008
Posts: 327

Message Posted:
30/11/2008 12:00

Join or Login to Reply
Message 107 of 254 in Discussion

i also cant believe the entire site will be finished by the end of next month, but i think thats evergreen for you... after the money from you asap

We have also bought an apartment from Boray and they were and are far more lienient than evergreen. We completed in March and only now are they sending gentle reminders about the vat. They also let us do the snagging before final payment ! Evergreen are giving us a months notice and then want money.

We are over the 28th of Dec, so our first thing will be to check out the site, and the apartment, before we part with any money



corbytown


Joined: 05/08/2008
Posts: 327

Message Posted:
30/11/2008 12:05

Join or Login to Reply
Message 108 of 254 in Discussion

So your final balance tony is £55,030 ? 55,590 if your late with your payment !!



roversnan


Joined: 20/05/2007
Posts: 81

Message Posted:
30/11/2008 12:14

Join or Login to Reply
Message 109 of 254 in Discussion

Hi Tony

Take the first 5 off and £5030 would be about right.



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
30/11/2008 17:51

Join or Login to Reply
Message 110 of 254 in Discussion

Hi all

spoke to friend in nc has been to site this am

Our apartment finished, road hardcored,pipes, manholecovers and pipes exposed etc lots of rubble making it hard to get to apartments, foundations to commual buildings in but thats all ,no tiling around and in pool, he cannot see it being finished for a while

hope this helps , hes is sending pictures so will put them on when we get them

sarah and keith



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
30/11/2008 22:58

Join or Login to Reply
Message 111 of 254 in Discussion

tony

how do i down load photos on msm site what programme do you use !!!!!

recieved some photos of site today

sarah



tonyhickey



Joined: 13/06/2007
Posts: 413

Message Posted:
30/11/2008 23:26

Join or Login to Reply
Message 112 of 254 in Discussion

What I do is download the pictures on the computer to a file ie.my pictures then go to multiply click on photos press add then you will see a empty list, click on browse highlight my pictures then click download. Tony



maddiemoo


Joined: 01/12/2008
Posts: 3

Message Posted:
01/12/2008 15:49

Join or Login to Reply
Message 113 of 254 in Discussion

Hi,

Like a lot of you I have just received the invoice for the final payment which is a lot more than I had anticipated and I also thought the email a little on the abrupt side. I am also confused.com about this interest on payment when all the payments that I have made have been on time. I remember the old message board about people saying beware the extra payments from evergreen well they were certainly right. The first thing I have done is sent the email I received from Nurten Peler to my solicitor in NC to get there advice about the payments that are being asked for, when I get this information I will let you know if there is any good news. I was out in late October and I thought the earliest that the complex would be finished would at the beginning of the year what does finished mean I assume it meant club house, swimming pools etc I would be very surprised if all this has been completed by now. I will watch the message board with interest over the next couple of weeks.



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
02/12/2008 00:03

Join or Login to Reply
Message 114 of 254 in Discussion

Maddiemoo,

We have also received an item included as interest on payments when all our have also been paid on time, it seems like most people are getting this extra payment. we have also sent the bill to our solicitor asking for advice regarding this and the VAT payment.



We will also update the forum when we receive any news.



Keith and Sarah



tonyhickey



Joined: 13/06/2007
Posts: 413

Message Posted:
02/12/2008 02:25

Join or Login to Reply
Message 115 of 254 in Discussion

Hi all

Have just got an updated final bill from evergreen as the first bill was unclear.I am pleased to say we have had no demand for interest on stage payment .I do not know how everbody else paid, but after the first payment through the advocate we sent the rest direct to evergreen.Dont know if this could be the reason for no delays in payments.

tony



gd427man


Joined: 05/08/2008
Posts: 68

Message Posted:
02/12/2008 14:36

Join or Login to Reply
Message 116 of 254 in Discussion

Hi all,

Got my final bill too.

I have a ground floor apt. which i bought for £40,000

I had air con at £1030

Electric is £500

Total should be £41,530 Ignoring stamp duty of £206.

They calculate vat at £2051.50 (works out at just over 5%)



Total = £43581.50



I have paid installments totaling £38530 (wont bore you with details)



This leaves £5051.50 to pay. By my calculation. Not £6173.17

Does anybody have any more idea.

I too have paid on time (as far as I am aware) so don't know where the interest has come from. (I did pay and installment through solicitor but was not told of any delays)

Can anybody shed any light before we contact Evergreen.

Are there any fees we pay that are not listed on the bill ?



TonyJ


Joined: 18/02/2008
Posts: 34

Message Posted:
02/12/2008 14:56

Join or Login to Reply
Message 117 of 254 in Discussion

Hi



I am exactly the same position....



A total of £420.83 for interest on late payments...



I wasn't aware of this at all.



Are Evergreen ever late in their delivery?



If so maybe we should charge them interest payments?



TonyJ



roversnan


Joined: 20/05/2007
Posts: 81

Message Posted:
02/12/2008 17:07

Join or Login to Reply
Message 118 of 254 in Discussion

Hi all

I think most of us are. Ours is a total of £375.83 for 3 late payments. The lawyer got the payments on time for 2 of them but Evergreen are charging for a couple of days. The third one I didn't get an email for the payment due.

Tony that is a point, it really made me laugh.



Lyn



gd427man


Joined: 05/08/2008
Posts: 68

Message Posted:
03/12/2008 10:44

Join or Login to Reply
Message 119 of 254 in Discussion

My Interest is listed as only £41.67 (It seems I have got off light)



How have I incurred this?



Where has the rest come from?

Are my calculations wrong?



Can anyone help?

I think a call / e-mail to Nurten may be in order.



maddiemoo


Joined: 01/12/2008
Posts: 3

Message Posted:
03/12/2008 17:15

Join or Login to Reply
Message 120 of 254 in Discussion

Hi to everyone,

I also had interest charges for late payments of approx £350.00 but have now managed to get them taken off as I had prove of payments being made on time it's worth checking. I have another query I see Tony Hickey put his bill on this message board and his delivery charge is £300.00 less than mine not sure how this can be can anyone shed any light what has everyone else been charged. I have emailed Evergreen telling them that my contact clearly states that the final payment should be made on complettion of all road access, pathways, and access paths including all facilities, I assume this to be swimming pools, club house, and gym, I have said I am quite happy to pay providing pictures are posted of all completed facilities. Having letf NC at the end of October I would be extremely surprised if they were all completed which means they would be in breach of contract if they are not finished.

Your thoughts would be welcome

Bruno



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
03/12/2008 21:40

Join or Login to Reply
Message 121 of 254 in Discussion

hi bruno

We had a friend visit the site this week the pool is not tiled in or around and the gym etc is at foundation level.We have photos tried to put on multiply site but cannot do it , will see if i can get someone else to do it.

We also feel that payment should be on completion of whole site and have been reading the contract.

we have had some money taken off bill also for late payment lol

sarah and keith



tonyhickey



Joined: 13/06/2007
Posts: 413

Message Posted:
03/12/2008 22:30

Join or Login to Reply
Message 122 of 254 in Discussion

Hi all, things do seem to be progressing well , as for the final jobs tarmaccing proablly only days once the hardcore is down, tiling the pools and surrounds, weeks rather than months, the stone built gym etc again probally only weeks. So it looks like being very very close to finish by end of December. If you need any pictures putting on multiply please email to me

Tony



maddiemoo


Joined: 01/12/2008
Posts: 3

Message Posted:
04/12/2008 13:44

Join or Login to Reply
Message 123 of 254 in Discussion

Hi,

I have had confirmation from my solicitor this morning in NC that the contract clearly states that final payment should be made on completion of all communal facilities that's the 2 communal overflow swimming pools, childrens pool and playground,restaurant, indoor gym, snooker/pool room, and the letting management company. I have asked Evergreen to post photo's of completed facilities and if this is done I am quite happy to pay and look forward to going out in April.

Bruno



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
08/12/2008 21:04

Join or Login to Reply
Message 124 of 254 in Discussion

HI all

we have also asked solicitor and evergreen about final payment , still waiting answer , seems that we only get quick replies when asking for money

thanks for the offer of posting photos tony , will try to email to you them

hope everyone is well , would be nice to finally get some sun , so really looking forward to next year.

sarah



tonyhickey



Joined: 13/06/2007
Posts: 413

Message Posted:
08/12/2008 21:35

Join or Login to Reply
Message 125 of 254 in Discussion

Just a reminder that Monday to Thursday this week is Bayram.



All government offices and probably banks will be shut until Friday.

tony



Wine Man


Joined: 11/09/2008
Posts: 74

Message Posted:
11/12/2008 20:43

Join or Login to Reply
Message 126 of 254 in Discussion

Interesting that all invoices seem to be different. I too have Stage payment interest of £115.95 but all payments have been on time???



Looking forward to any ansers we receive!



I'll be checking my contract now...



And will send an e mail to evergreen & solicitors asap.



Hoping to go on holiday with family in July PB3(r)so it better be finished as I have booked flights...



Looking forward to seeing anyone else out there.



corbytown


Joined: 05/08/2008
Posts: 327

Message Posted:
11/12/2008 22:21

Join or Login to Reply
Message 127 of 254 in Discussion

i emailed Nurten when we received our bill asking about the stage payment interest, and also before i pay my money, can she guarantee that the entire site will be ready by the end of this month but as yet i have not had a reply !



markcbm


Joined: 20/11/2007
Posts: 115

Message Posted:
12/12/2008 00:14

Join or Login to Reply
Message 128 of 254 in Discussion

Hi all



blast from the past i know



no answer from nurten for me to,

told her we have booked flight for 14 jan if all is done will give them the money and get the keys if not done wont pay till it is.



we got flight from monarch for £109 each just for 4 davys.seemed to good to say no.

let you no what she says when she does return email



Mark and Joy



tonyhickey



Joined: 13/06/2007
Posts: 413

Message Posted:
12/12/2008 01:32

Join or Login to Reply
Message 129 of 254 in Discussion

Is this catch 22? if we don't send our final payment out by the end of December and the apartment complex is ready we get charged a £500 late charge. If we send it early and it's not ready we have paid in advance i suppose it's a case of paying your money are not paying your money and taking your chance.

Tony. :D



Wine Man


Joined: 11/09/2008
Posts: 74

Message Posted:
12/12/2008 11:18

Join or Login to Reply
Message 130 of 254 in Discussion

I agree.



I have asked Nurten to confirm all the costs against the contract of sale. Also waiting for a reply. I will let you all know if and when I get a response.



gd427man


Joined: 05/08/2008
Posts: 68

Message Posted:
12/12/2008 12:56

Join or Login to Reply
Message 131 of 254 in Discussion

I too have e-mailed Nurten (3 times now) as they seem to have added my Air con payment in twice.

I too have had no reply. I read above that they have bayram till Thursday.

Is this a holiday?

I geuss she will be rather busy giving answers when she returns.

I also called evergreen on Wednesday morning but there was no reply.



It would be so easy for them just to put a few photos on the progress site and we'd all be happy.



Cheers



Wine Man


Joined: 11/09/2008
Posts: 74

Message Posted:
12/12/2008 19:14

Join or Login to Reply
Message 132 of 254 in Discussion

Hopefully we'll all have an answer by the middle of next week then otherwise its getting late in the month to transfer money.



Is anybody else in B Block?



corbytown


Joined: 05/08/2008
Posts: 327

Message Posted:
12/12/2008 23:25

Join or Login to Reply
Message 133 of 254 in Discussion

Luckily we are out there for the new year for 2 weeks so we will be incorperating a snagging trip and checking that the whole site is complete before we part with our money !

If its not ready by the end of the month when they want our money, i wonder if they will pay a penalty for every week that it is late ?!!!



Wineman we are A10



Wine Man


Joined: 11/09/2008
Posts: 74

Message Posted:
15/12/2008 10:24

Join or Login to Reply
Message 134 of 254 in Discussion

Corbytown - they only have to pay a penalty for every week or month it is late after the scheduled completion date in the contract which was May 09.



I'll send another e mail following up from the previous to Nurten agaian today and hopefully have an answer...?? don't hold your breath though.



corbytown


Joined: 05/08/2008
Posts: 327

Message Posted:
15/12/2008 12:18

Join or Login to Reply
Message 135 of 254 in Discussion

Thats my point wineman

they are quick to penalise us but have well safeguarded themselves



keithcaley



Joined: 13/06/2008
Posts: 2521

Message Posted:
15/12/2008 14:09

Join or Login to Reply
Message 136 of 254 in Discussion

Hi,

I don't usually read this thread as it is specific to your development, but I did just glance at it, and a couple of things caught my eye -

Legally, VAT is payable on 'Possession' - which can be interpreted in a number of ways - however the HBPG recommend (last I heard) that you do NOT pay the vat until you have PTP, are in residence with all services connected, and transfer of Kocan is underway.

Ignore any requests for interest for any reason, - the reason being that you may, at some point want to try to get some money back out of the builders if THEY are late, and you stand more chance of experiencing a Virgin Birth.

If your Advocate is demanding more money for the transfer of Kocan, see Marian Stokes, it is easy to do it yourself, at very minimal cost. Most Advocates are greedy incompetents who prey on the gullible. In any event, the advocate should do it for the price charged. Locals do not bother using an advocate for house sales.

Keith.



Wine Man


Joined: 11/09/2008
Posts: 74

Message Posted:
15/12/2008 14:51

Join or Login to Reply
Message 137 of 254 in Discussion

All,



I have just had an e mail from evergreen stating that the costs remaining are accurate. However, I noticed that they are trying to charge me £59.02 because my initial deposit was £977.50 and the contract stated it should be£1,036.52.



In reality I paid £1036.52 as that is the value on my credit card statement. I have asked them to deduct this figure of £59.02 from the outstanding costs. I have had to agree to the interest charges of £115.95 reluctantly although I do not believe any were my fault (1 was solicitor and 2nd was bank delays).



I will update you when I get a response.



Good Luck...



Wine Man


Joined: 11/09/2008
Posts: 74

Message Posted:
15/12/2008 15:39

Join or Login to Reply
Message 138 of 254 in Discussion

For your information Evergrenn have realised they made a mistake with the initial deposit and have deducted it from the final payment - I know it's not a lot but its the principal.



Anyone else had any contact from Evergreen?



corbytown


Joined: 05/08/2008
Posts: 327

Message Posted:
15/12/2008 15:42

Join or Login to Reply
Message 139 of 254 in Discussion

thanks alot for your input Keith.



Wineman, No reply to my email yet !



Molly


Joined: 30/08/2008
Posts: 299

Message Posted:
15/12/2008 15:48

Join or Login to Reply
Message 140 of 254 in Discussion

VAT is payable once you take possession of the property and is 5% of the sale price.



You should not take possession until you are completely satisfied that the property and infrastructure is completed according to the contract.



There is no penalty for late payment of VAT and you should only pay it upon receipt of a proper company invoice - not an email demanding that you do so.



If you have any doubt as to the legality of the demands being made by Evergreen, consult the HBPG for further advice.



corbytown


Joined: 05/08/2008
Posts: 327

Message Posted:
15/12/2008 15:59

Join or Login to Reply
Message 141 of 254 in Discussion

Molly and Keith, thanks for your input.



i have emailed evergreen "again" armed with this info and looking forward to their reply !



Bruno


Joined: 10/01/2008
Posts: 48

Message Posted:
15/12/2008 15:59

Join or Login to Reply
Message 142 of 254 in Discussion

Message for wineman I am in B4M so it seems we will be neighbours.

I have also gone through the process of emails back and forth to Nurten re payments and at the same stage as many of you waiting for a reply from Evergreen. I am happy to pay the money providing the whole complex is complete we shall have to wait and see. I also received a snagging list from NCI who I asked to have a look for me and there seems to be quite alot that needs to be finshed off so would want all that complete before paying money, lets hopw we get some feedback from Evergreen shortly.

Bruno



gd427man


Joined: 05/08/2008
Posts: 68

Message Posted:
15/12/2008 18:39

Join or Login to Reply
Message 143 of 254 in Discussion

Hi all,

After several e-mails I have just had a reply fro Nurten stating they made a mistake on my final bill.

They tried to charge me for Air con again.

I pointed this out -THREE TIMES - and they have just acknowledged their mistake.

New bill now ok.

She also sent some Photos to show the state of completion.

They had fitted the wrong colour units so she demonstrated that they have been changed

She also included some pool pictures to show completion.

Or not - actually.

If possible I will try to put these on Multiply tonight.

There are only a couple but you should find them interesting.

Cheers.



gd427man


Joined: 05/08/2008
Posts: 68

Message Posted:
15/12/2008 22:24

Join or Login to Reply
Message 144 of 254 in Discussion

Hi, Me again.

Think I have managed to put the photos on Multiply.

(not very good at this sort of thing)



Look for the following file and view for yourself........ Complete ?

CBM Latest Update 11/2008

Shortcut below- (or so it told me)

http://crystalbaymarina1.multiply.com/photos/album/19/CBM_Latest_Update_112008



gd427man


Joined: 05/08/2008
Posts: 68

Message Posted:
15/12/2008 22:26

Join or Login to Reply
Message 145 of 254 in Discussion

Just tried the link myself and my god it works.

Talk later.

Cheers.



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
16/12/2008 16:06

Join or Login to Reply
Message 146 of 254 in Discussion

Hi gd427man,

Thanks for the photographs on mutiply, it would seem that this would prove that the site is not going to be ready by 31st or am I missing something.



We are still waiting a reply from Nurten.



Keith



gd427man


Joined: 05/08/2008
Posts: 68

Message Posted:
17/12/2008 14:41

Join or Login to Reply
Message 147 of 254 in Discussion

I have sent an e-mail to my solicitor Sener law firm) in Cyprus regardinf the payment demands and attached the photos for them to see.

As yet no reply.

Has anybody actually paid ?

The interest of £500 for not paying by end December seem grossly unfair.



Are they short of money?

Why are they making such demands.?



roversnan


Joined: 20/05/2007
Posts: 81

Message Posted:
17/12/2008 16:49

Join or Login to Reply
Message 148 of 254 in Discussion

Hi All



I sent my money yesterday, but my lawyer (also sener) knows, and to let evergreen know she has it, but won't release it until I say so.

I also asked about the vat payment but as yet haven't had a reply.



Who are you using for snagging as Stuart Hillard isn't allowed on the site.

I have sent 2 emails to Tim Spensley but have had no reply.

Lyn



Bruno


Joined: 10/01/2008
Posts: 48

Message Posted:
17/12/2008 16:51

Join or Login to Reply
Message 149 of 254 in Discussion

Hi Everyone,

I dont want to be the bearer of bad news but I have had correspondence with my solicitor and it seems that which ever way you look at that if the site is not complete you do run the risk of fighting a loosing battle if you dont pay your final fees. She gave me chapter and verse about the legal system in N.Cyprus and it does seem to favour the construction companies so if you did have to go to court for whatever reason it would probably cost you money and in the end you would probably be worse off and risk loosing your property. I have decided to pay the full amount it's totally against my priciples as I dont think by any strech of the imagination that the complex will be fully complete but in the end it has to be paid and I dont really want to take the shine off what I hope will be a good experience. In the end you will have to decide what you want to do but what ever it is I hope you all have a great Xmas and lets hope for a prosperous New Year.

Bruno



gd427man


Joined: 05/08/2008
Posts: 68

Message Posted:
17/12/2008 17:06

Join or Login to Reply
Message 150 of 254 in Discussion

Thinking of going out myself as they fitted the wrong bedroom and kitchen units in our apartment so I want to see they have been changed.

Don't know those names, are they representatives of the two companies recommended by Evergreen?

Their names are not mentioned on the letters.

Also why is the first guy not allowed on site?



ian



keithcaley



Joined: 13/06/2008
Posts: 2521

Message Posted:
17/12/2008 17:06

Join or Login to Reply
Message 151 of 254 in Discussion

Msg 148

"Who are you using for snagging as Stuart Hillard isn't allowed on the site. "

Does this tell you something?

Msg 149

The Advocates here are mostly greedy incompetents, if not outright thieves.

If they are not actually representing the Vendors as well as the Buyers, they are all still pissing in the same pot.

They will not do anything to rock the boat, or upset their main source of income, the Builders / Developers.

Don't believe everything you are told, use your own brains, and treat ALL Builders etc as you would a stranger that you just met in the street who is trying to sell you a second-hand car.

Caveat Emptor!

Keith.



roversnan


Joined: 20/05/2007
Posts: 81

Message Posted:
17/12/2008 19:49

Join or Login to Reply
Message 152 of 254 in Discussion

This was the reply to the mail I sent him



Dear Lyn



Thank you for your email. I note that you are buying a property at Crystal Bay Marina which I believe is being built by Evergreen. I have over the last couple of years acted for a number of clients buying properties from Evergreen and have highlighted many quality issues, sadly instead of working with me to resolve these Evergreen decided instead to ban me from their sites. You might be interested to see correspondence between us so I have attached this for your information.



roversnan


Joined: 20/05/2007
Posts: 81

Message Posted:
17/12/2008 19:50

Join or Login to Reply
Message 153 of 254 in Discussion

Sadly I don't think any of my clients buying from Evergreen have managed to resolve their issues satisfactorily and I am still in touch with many of them and if I can help them, albeit remotely, then I do so but sadly I would be unable to undertake a survey or snagging for you on an Evergreen site. I believe the only people Evergreen will allow on their sites to undertake snagging inspections are the ones they recommend, which I do not think is satisfactory and not in the best interest of their purchasers.







Kind regards, Stuart



crystallady


Joined: 16/04/2008
Posts: 103

Message Posted:
18/12/2008 18:42

Join or Login to Reply
Message 154 of 254 in Discussion

I can recommend an English lady who has spent the last couple of years 'snagging' for a large development company in the TRNC and understands from both ends of the spectrum. She has good working knowledge of this side of the industry and you can e-mail her at tara@silione.com



corbytown


Joined: 05/08/2008
Posts: 327

Message Posted:
18/12/2008 21:26

Join or Login to Reply
Message 155 of 254 in Discussion

I emailed Nurten asking to whom do i give my snagging list to, obviously evergreen prefer for one of their reps to be present. Below is her reply;



Dear Tom,



During your visit on what day (between Monday to Friday) and time would you like to meet our Representative to carry out the snagging at your apartment?



He will write the list which will be provided to the Contractor.



Kind Regards,



Miss Nurten Peler



roversnan


Joined: 20/05/2007
Posts: 81

Message Posted:
18/12/2008 22:18

Join or Login to Reply
Message 156 of 254 in Discussion

Many thanks Crystallady, I will be sending her an email.



Lyn



kaiserphil


Joined: 14/12/2008
Posts: 1096

Message Posted:
18/12/2008 23:23

Join or Login to Reply
Message 157 of 254 in Discussion

Message 151 - Keith, how sad! How very true!



Some of the many reasons I no longer live in TRNC!



keithcaley



Joined: 13/06/2008
Posts: 2521

Message Posted:
19/12/2008 19:06

Join or Login to Reply
Message 158 of 254 in Discussion

Happy Christmas in Bavaria or wherever it is you are now!



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
19/12/2008 19:48

Join or Login to Reply
Message 159 of 254 in Discussion

Hi all,



Just received and auto reply from Nurten that states she is now not back in the office until 5th January - not to helpful in our current position. Now we really dont know what to do about our payments.



Sent an Email to our solicitor asking for advice - no reply to date.



Keith



Wine Man


Joined: 11/09/2008
Posts: 74

Message Posted:
19/12/2008 20:53

Join or Login to Reply
Message 160 of 254 in Discussion

I suppose it all depends on whether or not you wish to pay the additional £500 + any interest they are only to keen to add.



I'm visiting in Feb to sort out banking and start to look at furniture as I believe we have had very little support in this. I just feel as though I need to communicate face to face as sometimes e mails do not get the correct message across.



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
25/12/2008 01:31

Join or Login to Reply
Message 161 of 254 in Discussion

merry christmas to all everygreenies

sarah and keith



roversnan


Joined: 20/05/2007
Posts: 81

Message Posted:
25/12/2008 12:02

Join or Login to Reply
Message 162 of 254 in Discussion

happy christmas to all - don't get to drunk

Lyn and Rob



TonyJ


Joined: 18/02/2008
Posts: 34

Message Posted:
25/12/2008 14:17

Join or Login to Reply
Message 163 of 254 in Discussion

Merry Christmas everyone



I have a few things I need to clarify.



According to stage 5 of our contract:



v. ₤2,500 (Two Thousand and Five Hundred British Pounds Sterling) is payable upon completion of all communal roads, access ways, pathways, infrastructure, communal facilities and a supply of electricity and water and in return for delivery of the Property to the Purchasers.



Does anyone have solid evidence that it is complete?



Plus is the payment due by the end of December or by the 15th January (re: the email sent by Nurten)?



I am going out for 5 days during February half term (16th to 21st) so if anyone needs any photos etc. just let me know?



If anyone can think of any things I need to sort out while I'm there please let me know.





Many thanks



TonyJ



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
26/12/2008 12:38

Join or Login to Reply
Message 164 of 254 in Discussion

Tony,

We have the same clause in our contract, it appears that they want the money by 31st December.



We have a friend who lives in NC who states that he does not believe site will be 'completed' any time soon, roads not done, pool not tiled and communal buildings just a frame. He is returning there at beginning of January and will update on any progress or lack of it. I think some people that use this forum or in NC now and are gonna update us when they return.



Hope that is of some help.



Keith and Sarah



PS Merry Xmas



tonyhickey1


Joined: 21/12/2008
Posts: 3

Message Posted:
26/12/2008 20:49

Join or Login to Reply
Message 165 of 254 in Discussion

How may people buying on Cyrstal Bay Marina have paid their final payment ,or intending to do by 31st December 2008. Tony.



markcbm


Joined: 20/11/2007
Posts: 115

Message Posted:
26/12/2008 21:55

Join or Login to Reply
Message 166 of 254 in Discussion

we are going out on the 14th jan for 3 days to check site we will pay if its finished.don't think it will be though

mark



phoenix


Joined: 15/11/2007
Posts: 17

Message Posted:
27/12/2008 19:36

Join or Login to Reply
Message 167 of 254 in Discussion

We have got the money ready to go, but we have e-mailed them to say we will not pay untill they send photos of finished site,of course i have had no reply.I am wondering if the vat payment will go where it should, or to a Evergreen bank account. The threat of the late payment interest worries me greatly but if we all stick together and insist they keep to the contract perhaps they will see it is easier in the long run to work with us and keep some good will on our side. I am hopeing there is someone going on site over the holiday, to take photos to show us one way or the other.



TonyJ


Joined: 18/02/2008
Posts: 34

Message Posted:
27/12/2008 19:39

Join or Login to Reply
Message 168 of 254 in Discussion

I agree, I am not parting with any money until we have solid proof of completion.



according to the contract:



₤2,500 (Two Thousand and Five Hundred British Pounds Sterling) is payable upon completion of all communal roads, access ways, pathways, infrastructure, communal facilities and a supply of electricity and water and in return for delivery of the Property to the Purchasers.



bachelibelly


Joined: 04/09/2008
Posts: 275

Message Posted:
27/12/2008 19:51

Join or Login to Reply
Message 169 of 254 in Discussion

Just buttin in with my two penneth,



United you stand ,divided you fall,All for one and one for all etc. Got to be the way forward for any purchasers on a complex where the developers are blatantly disregarding the terms of the contract when it suits them and threatening enforcement of certain sections when it is in their favour,however stand together as individuals if you know what i mean think how much more it costs in time ,money and paperwork to try to enforce unfair demands on 50 seperate purchasers .



PS. I have no personal axe to grind either way,just fed up of reading about malpractice on this board and others.



corbytown


Joined: 05/08/2008
Posts: 327

Message Posted:
27/12/2008 21:12

Join or Login to Reply
Message 170 of 254 in Discussion

We are going over tomorrow for the new year, i will take pictures of the site but we are not back until the 11th jan to post them on the forum.



TonyJ


Joined: 18/02/2008
Posts: 34

Message Posted:
27/12/2008 21:20

Join or Login to Reply
Message 171 of 254 in Discussion

Hi corbytown



If I provide you with my mobile number would you consider letting us know how things are progressing with a text message? I could then relay the information to the forum.



Many thanks



TonyJ



corbytown


Joined: 05/08/2008
Posts: 327

Message Posted:
27/12/2008 22:19

Join or Login to Reply
Message 172 of 254 in Discussion

no problem tony

can you email me your number before 11am tomorrow and i will text you



tom



markcbm


Joined: 20/11/2007
Posts: 115

Message Posted:
27/12/2008 22:37

Join or Login to Reply
Message 173 of 254 in Discussion

thanks tom that is great news look forward to your update.

have a great time



mark



TonyJ


Joined: 18/02/2008
Posts: 34

Message Posted:
27/12/2008 23:44

Join or Login to Reply
Message 174 of 254 in Discussion

Hi Tom



not allowed access to your email (not made enough posts apparently).

This is mine:



towack@blueyonder.co.uk



Can you email me?



Cheers



TonyJ



tonyhickey1


Joined: 21/12/2008
Posts: 3

Message Posted:
28/12/2008 00:53

Join or Login to Reply
Message 175 of 254 in Discussion

Hi Corbytown Sorry for the late notice but if you get time could please have a look round our apartment B5 ground left for any snagging jobs. The only ones we found in June 2008 were shower downstairs ,waste pipe not connected up, stair rail loose in places and no covers on interior fuse boxes. Hope you have a good holiday ,wish we were there. Tony and Susan.



corbytown


Joined: 05/08/2008
Posts: 327

Message Posted:
28/12/2008 10:50

Join or Login to Reply
Message 176 of 254 in Discussion

hello tony



i look over your apartment before we do our snagging list, write a list for yours and hand it to the evergreen rep that we are meeting.

hopefully i get everything that needs correcting



tom



TonyJ


Joined: 18/02/2008
Posts: 34

Message Posted:
30/12/2008 21:10

Join or Login to Reply
Message 177 of 254 in Discussion

Hi all



just got a text message from corbytown who has just arrived at the CBM site:



"I was at CBM today, not a chance of being finished. Swimming pools are holes, no club house, roads are shingle, will take at least 2 months before it is finished I think."



Just as we feared?



TonyJ



markcbm


Joined: 20/11/2007
Posts: 115

Message Posted:
31/12/2008 00:25

Join or Login to Reply
Message 178 of 254 in Discussion

thanks tony and corbytown as you say just as we feared,

to be honest not happy with evergreen, i bet lots of people have paid

we have booked our flights to check site in a couple of weeks and to pay if finished, looks like we have wasted our time and money for a trip thats now not needed yet, perhaps we should charge them for the flight and cost's etc.



mark



Wine Man


Joined: 11/09/2008
Posts: 74

Message Posted:
31/12/2008 12:51

Join or Login to Reply
Message 179 of 254 in Discussion

I'm visiting from Feb 1st to 6th. Mainly to set up bank account and start to look for furniture but, I will check out the state of play etc. regarding finish dates.



Tony (B5 grd floor Left) I will try to have a look for you if they allow me access to your property as it almost next door to me. Send me a list of things you wish me to look at & I'll let you know on my return.



Happy New Year to you all and lets hope it's a good one or at least the site gets finished.



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
31/12/2008 13:55

Join or Login to Reply
Message 180 of 254 in Discussion

hi all

Tony thanks for message that is what our friend has been telling us .He visit site on our behalf we can get regular updates as he just lives up the road, so will post on here ,.

Keith has a flight booked for the end of april , look on easy jet site got a very good deal to larnaca from gatwick, also booked for for the summer so hope everything up and running by then.

Hope everyone has had a good christmas and has a good new year and heres hoping to holidaying in our apartments next year

sarah



gd427man


Joined: 05/08/2008
Posts: 68

Message Posted:
06/01/2009 11:46

Join or Login to Reply
Message 181 of 254 in Discussion

Hi all.

Happy new year.

Just e-mailed Nurten to say can she provide proof of completion of facilities so I can pay - as per contract - (Haven't paid yet).

Told her not happy to pay until complete as per contract, we'll see what her reply is.

Also to ask her to arrange snagging on 16th Jan. (apt A10 GL)

Going out there on 14th till 17th.

I see Mark is out there too.

Will also try to look at furniture, white goods etc.

Anyone need photos or help in there apartment let me know.

Will do my best but of course snagging is subject to everones own standards.



Cheers.



gd427man


Joined: 05/08/2008
Posts: 68

Message Posted:
06/01/2009 13:49

Join or Login to Reply
Message 182 of 254 in Discussion

me again.

Just had reply from Nurten.

No mention of either confirmation of completion or payment demands,

she has arranged for me to snag our apt with their rep on 16th Jan 10.30 am.



Think I will go and see her face to face whilst I'm there.



Cheers.



roversnan


Joined: 20/05/2007
Posts: 81

Message Posted:
06/01/2009 14:30

Join or Login to Reply
Message 183 of 254 in Discussion

Hi all



I also emailed Nurten and Sener yesterday about proof that the complex is finished. Sener already has our money, but cannot release it until I am satisfied. I have already paid enough for late payment and am not prepared to gift them another £500.

As yet I haven't had a reply. We are apt A2M.



Lyn



Pearlbayer


Joined: 06/10/2008
Posts: 204

Message Posted:
06/01/2009 16:32

Join or Login to Reply
Message 184 of 254 in Discussion

Hi to you all, I have a villa across the ravine from you all on Pearl Bay and wondered if any of you knew that we are supposed to be sharing your "Clubhouse/ gym" etc with you.Originally we were to have our own on our site then we were told they had bought more land and were building pool bar etc. Turns out after speaking with Nurten it is on your site.



Wine Man


Joined: 11/09/2008
Posts: 74

Message Posted:
06/01/2009 18:21

Join or Login to Reply
Message 185 of 254 in Discussion

Sounds interesting. Are there any additional buildings on your site at all?



Wine Man


Joined: 11/09/2008
Posts: 74

Message Posted:
06/01/2009 18:25

Join or Login to Reply
Message 186 of 254 in Discussion

gd427man - let me know how you get on especially regarding furniture.



Will it all be assembled etc on delivery - how will it all work or are you planning to be there when it is delivered etc.



markcbm


Joined: 20/11/2007
Posts: 115

Message Posted:
06/01/2009 20:05

Join or Login to Reply
Message 187 of 254 in Discussion

Hi gd427man we are the same dates we have had an email back from nurten as well we are going to office on 15th at 11 am then snaging at 12 16th.

who are you flying with and from where ?

i give you my mob no before we go it would be nice to meet



Mark



TonyJ


Joined: 18/02/2008
Posts: 34

Message Posted:
06/01/2009 23:06

Join or Login to Reply
Message 188 of 254 in Discussion

Hi gd427man/ markcbm



my brother and I each have an apartment on CBM, would you be able to do the snagging for us?



Kind regards



TonyJ



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
07/01/2009 00:24

Join or Login to Reply
Message 189 of 254 in Discussion

Hi all,

News to us about 'Pearl Bay' using our clubhouse/gym etc. didnt see that in any of the Evergreen literature?



We are having our snagging done tomorrow 07/09 at 1030 wil let you know how it goes.



Anyone recently visited the site have any updates/photographs they can pass onto us, please do.



Any details of good furniture/white goods packages please pass details also.



Keith and Sarah



tonyhickey



Joined: 13/06/2007
Posts: 413

Message Posted:
07/01/2009 01:11

Join or Login to Reply
Message 190 of 254 in Discussion

Hi Pearlbayer

I had heard previously that some of the crystal bay sites were to share facilities. I must say it makes a great deal of sense to me, why you may say , well to have a busy bar and restaurants on site you do need lots of people to create atmosphere , and profit for the owners . Otherwise no bar, no drinks, no entertainment , no evening meal after a hard days sunbathing, no meeting place to meet fellow owners, Same with the gym the more people using it the more likely the site management will keep the equipment up to date and in good working order . Also should anyone be thinking of renting there apartments out they should find it easier on a popular site rather than a ghost site, I do realise you have to find a balance and not become mini ayla napa on a Saturday night but I don’t really think that could happen.

Tony



tonyhickey



Joined: 13/06/2007
Posts: 413

Message Posted:
07/01/2009 10:04

Join or Login to Reply
Message 191 of 254 in Discussion

Also the more owners the cheaper the over heads become



gd427man


Joined: 05/08/2008
Posts: 68

Message Posted:
07/01/2009 10:55

Join or Login to Reply
Message 192 of 254 in Discussion

Wine man, (message 186)

I'll ask the questions and let you know.

Don't think I'll be able to be there when dilivered so may have to arrange something, depends on dates.



Markcbm (message 187)

Flying to Paphos from manchester and getting car.

Date / Flight No.

14/01/2009 TOM 4817 Manchester 09:40 Paphos 16:25

17/01/2009 TOM 4818 Paphos 20:45 Manchester 23:50

but may stay in Paphos wed night and drive up next day.

My mobile is 07963 232780. Would be good to meet.

Cheers



Tony J (message 188)

My snagging time is 16th at 10.30 and Marks is 16th at 12.00 if you can arrange with Nurten to fix your times close to this and tell her that we are doing it on your behalf we should be able to help.

I will take a photo of each snagging item and e-mail it to you.

Send me an e-mail so I have your address to ianfm@talktalk.net .

Please contact me on 07963 232780 before we go to confirm what you expect from your snagging. (so we are at least expecting similar standards )



Cheers



Pearlbayer


Joined: 06/10/2008
Posts: 204

Message Posted:
07/01/2009 13:06

Join or Login to Reply
Message 193 of 254 in Discussion

Hi Wineman + Tony,



I think the idea of sharing is fine, I just had visions of people asking us what we were doing using their facilites. On the Evergren brochure for Pearlbay we had swimming pool(which we have), Tennis courts and gym. We were then told that Evergreen had acquired some more land and were building a poolside bar. Now we are told we can share the Tennis court with the development to the otherside of us from yourselves, which is not an Evergreen site. Also the gym + poolside bar is on your site. From experience I know its not worth arguing with Evergreen, been doing that for nearly 4 years.



Wine Man


Joined: 11/09/2008
Posts: 74

Message Posted:
07/01/2009 19:41

Join or Login to Reply
Message 194 of 254 in Discussion

gd427 man (message 192)



Yuo say you are driving from Paphos to TRNC? Which car rental company do you use to be able to drive from south to north? Is the border crossing hassle free? and how long does it take?



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
08/01/2009 00:53

Join or Login to Reply
Message 195 of 254 in Discussion

Hi All

We had our snagging completed today on apartment only all few cosmetic items to deal with , so that was good news.

Apparently paths should be in by mid feb as well as electric and water .

Tony

makes sense what you say about sharing facilites

pearlbayer look forward to seeing you at cbm

sarah



markcbm


Joined: 20/11/2007
Posts: 115

Message Posted:
08/01/2009 02:09

Join or Login to Reply
Message 196 of 254 in Discussion

Hi Ian

my mob no is 07889 441252

we are flying to larnaca wed evening hope to drive over border to our place in yesiltepe by about 11pm all being well,



karl we hire our car on greek side from economy car rental we have done this many times now, there small print say's no problem to take car to north, just get insurance at border,



we asked nurten why not ready like they said it would be her reply was

i quote



the expected completion date for the site was prvided by the contractor but due to local holidays and bad weather the construction works had to be delayed by approximately 4 weeks, I apologise for the inconvenience caused.



Mmmmm



TonyJ


Joined: 18/02/2008
Posts: 34

Message Posted:
08/01/2009 11:13

Join or Login to Reply
Message 197 of 254 in Discussion

Hi



did she also say that the rest of the payment was still due for payment immediately...



i.e the VAT, Electric connection and the stage payment Interest



Which still comes to over £3000!



TonyJ



markcbm


Joined: 20/11/2007
Posts: 115

Message Posted:
08/01/2009 11:42

Join or Login to Reply
Message 198 of 254 in Discussion

Hi Tony



she never mentioned money in her email



Mark



gd427man


Joined: 05/08/2008
Posts: 68

Message Posted:
08/01/2009 13:13

Join or Login to Reply
Message 199 of 254 in Discussion

Hi all.

Wineman, all car hire companies in southe will let you go north as long as you get the extra insurance.

I too will bw using economy car rentals.

You cannot hire cars in the north and go south though.

Drive from Paphos takes about 2 & 1/2 hrs. Smooth roads not too much traffic other than near the cities.

Border crossing (done it twice) no hassle, you get a visa which you can use again. biggest problem we had is finding the crossing in Nicosia. Speeling for Kyrenia is different on some of the signs. ie Kerynia.



Markcbm,

I will probably break up the journey and stay in Paphos wed night.

Will be in Kyrenia Thursday morning.

Will contact you then if not before.



Cheers.



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
08/01/2009 23:44

Join or Login to Reply
Message 200 of 254 in Discussion

Hi all,

Does anybody know of any company that will give our apartment a good prior to us using it, as I dont fancy wearing marigolds for the first few days we are over there.



Keith



tonyhickey



Joined: 13/06/2007
Posts: 413

Message Posted:
09/01/2009 01:15

Join or Login to Reply
Message 201 of 254 in Discussion

Could anyone help i need to know if the down stairs bedroom on the ground floor end apartments are large enough for two single beds or a small double

tony



negativenick


Joined: 10/11/2008
Posts: 6023

Message Posted:
09/01/2009 09:22

Join or Login to Reply
Message 202 of 254 in Discussion

i do hope the quality of construction at Crystal bay marina is better than the Morris Marina of old......





Nick



suntanman



Joined: 18/04/2007
Posts: 721

Message Posted:
09/01/2009 10:01

Join or Login to Reply
Message 203 of 254 in Discussion

Tony,

I think that the garden apt bedroom at CBM are the same size as ours at CBV.

Our downstairs is 2.85x2.85m and we have 2 single beds, they fit perfectly.

tip: get some graph paper, and cut out items of furniture to scale on paper, play around fitting them in to the rooms. It's great fun, all those years of watching Blue Peter paid off!



gd427man


Joined: 05/08/2008
Posts: 68

Message Posted:
09/01/2009 14:15

Join or Login to Reply
Message 204 of 254 in Discussion

Tony, (massage 201)

You will not get 2 single beds in the downstairs bedroom, you will get a normal size double ie 4' 6" wide.

Measured this in September.

A double is actually shown on the Evergreen brochure.



Cheers.

Ian



suntanman



Joined: 18/04/2007
Posts: 721

Message Posted:
09/01/2009 21:51

Join or Login to Reply
Message 205 of 254 in Discussion

Tony:

I've put a photo on your multiply website of our downsatairs bedroom.

I don't know the dimentions (width x depth) of yours at CBM, but you will see one bed against the left hand side wall, the other is on the opposite wall, giving aprox 1 metre between them. There is about 1m from the end of the bed to the wardrobes, allowing them to open.

One slight problem, the light switches are at the end of the bed, initaially the bedroom was designed to have a solid wall, not the sliding doors and light swithes were fitted to accomodate the beds with headboards against the left hand side wall.

Initially we thought that only a double bed would fit, but after we visited the apartment and took further measurements found that 2 x singles would fit.

Regards

Andrew



tonyhickey



Joined: 13/06/2007
Posts: 413

Message Posted:
10/01/2009 01:49

Join or Login to Reply
Message 206 of 254 in Discussion

Andrew thanks for the information



gd427man


Joined: 05/08/2008
Posts: 68

Message Posted:
12/01/2009 10:47

Join or Login to Reply
Message 207 of 254 in Discussion

Tony,

I will bring back the exact dimension of my apartment and you can do the maths and decide.

I remember thinking it was so tight for space that when you try to open the cupboard doors you would struggle to stand in front of them, but if its possible then two singles would be better.

Andrew do you know the exact dimensions of your bedroom?

Cheers.

Ian.



suntanman



Joined: 18/04/2007
Posts: 721

Message Posted:
12/01/2009 12:28

Join or Login to Reply
Message 208 of 254 in Discussion

Ian

Our's is 2.85 x 2.85m.

In message 205 I said that the space from end of bed to wardrobes was 1m, sorry I meant to put 1/2m, just enough to open the doors.

Andrew



corbytown


Joined: 05/08/2008
Posts: 327

Message Posted:
12/01/2009 13:03

Join or Login to Reply
Message 209 of 254 in Discussion

Hello all



back yesterday.

We done our snagging list and ended up with a list as long as my arm. The evergreen rep mustafa and a builder accompany you and write down the faults. A snagging list to me is the minor faults you see, in this case, things like the toilet, bath were not even fixed never mind connected, tiles missing, poor paint finish, scratches on the bedroom wardrobes which to me will need replacing. I am not saying everyones will be in such poor state but i was dissapointed with ours. Nurten says it will be corrected within the month and i can resnag, i live in the uk !

I looked round your apartment Tony and the things you mentioned have not been done yet, plus there are no door handles and a crack in the wall as you come down the stairs but all in all in better state than ours ! and your amber solaire is still there !

In my opinion it will be at least a couple of months before the site is finished.

But i think it will be nice when it is eventually finished.

tom



tonyhickey



Joined: 13/06/2007
Posts: 413

Message Posted:
13/01/2009 02:41

Join or Login to Reply
Message 210 of 254 in Discussion

Thanks tom great help hope you had a good holiday ,how was the weather?

Have now found the size of the small bedroom it is 2.20x2.84m a lot smaller than suntan man.

tony



gd427man


Joined: 05/08/2008
Posts: 68

Message Posted:
13/01/2009 15:45

Join or Login to Reply
Message 211 of 254 in Discussion

Hi all,

Off tomorrow

I have enlisted the services of a guy from JKA properties to come with me to do the snagging. He charges £89 and will make two repeat visits to see if the work has been done.

This should save me the trouble of returning to check. ( ree corbytown message 209)

He says he has worked with evergreen before but is independant - w'ell see-

at least he will be there to see what I see and work from the same list.



can only do partial snagging as I have just found out that there's no water or electric yet - should be March !!! (not happy)

Also meeting Nurten day after for a 'chat'.



Corbytown - have you paid any money. I have not been asked for any again but I gather some have been asked to pay vat, electric and interect etc. but not the final £2500.

They should have done this in the first place !



Report back next week.

Cheers.



suntanman



Joined: 18/04/2007
Posts: 721

Message Posted:
13/01/2009 16:03

Join or Login to Reply
Message 212 of 254 in Discussion

Ian:

That must be Richard who you are meting to do snagging. He's a genuine guy, he helped us last year with 'after snagging' and sorted out a few minor problems with our apt when we got our keys. He was taken on by evergreen to get things moving with snagging, and was a great help to us.



gd427man


Joined: 05/08/2008
Posts: 68

Message Posted:
13/01/2009 18:45

Join or Login to Reply
Message 213 of 254 in Discussion

Afraid not, the name on his e-mail was paul conway.

Hope he's just as good.

Evergreens rep is called mustafa, aparently.

By the way if some of you club together (say 3 or more) and can 'snag' at the same time he'll do a discount but don't say i told you.



Cheers.



markcbm


Joined: 20/11/2007
Posts: 115

Message Posted:
13/01/2009 22:40

Join or Login to Reply
Message 214 of 254 in Discussion

Hi

wish us luck we are on our way tomorrow!



should we pay or not, what do you all think ?



see you there Ian



Mark



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
14/01/2009 01:08

Join or Login to Reply
Message 215 of 254 in Discussion

mark and ian



Have a great trip , hope your snagging goes well.

Tom hope you had a good trip



sarah and keith



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
14/01/2009 12:11

Join or Login to Reply
Message 216 of 254 in Discussion

Hi all,

Just received an Email and photographs of site from Nurten. The update is apparently that site will be completed by 15th Feb and that is the new date for payments to be made.



Site looks very good - but all photos from a distance and it has looked good from distance for a while.



I have asked Nurten to confirm if whole site will be finished by then, all communal areas, pools and water and electric connections etc.



Keith



tonyhickey



Joined: 13/06/2007
Posts: 413

Message Posted:
17/01/2009 01:18

Join or Login to Reply
Message 217 of 254 in Discussion

White goods package details from miss nurton details o n C B M site

http://crystalbaymarina1.multiply.com/



gd427man


Joined: 05/08/2008
Posts: 68

Message Posted:
20/01/2009 00:12

Join or Login to Reply
Message 218 of 254 in Discussion

hi all.

Back from snagging.

I used Paul conway from JKA see link : jka.cyprus@gmail.com



He was more thorough than I ever expected and of course is there to do the follow up visits. Even after the water and power is on !

Totally recommend him as did MarkCBM from this forum who also used him.

New competion dae now 15th Feb.......No chance.

See photolink below. Pools and clubhouse etc have not changed since Xmas.



http://crystalbaymarina1.multiply.com/photos/album/29/Latest_CBM_Pics_01.09



I see we have all been sent details of white goods. This does not seem a bad price. I priced some stuff up and even in January sales I only got down to around £1150.

I advise caution on the guarrantee claims though. The man in the Arcelik shop told me that tree years was only on larger items which means your hob and extractor only have a year. Worth checking with Evergreen if you are thinking of buying with them.

I also have some names for furniture but will post later.(no space left)

Ian



gd427man


Joined: 05/08/2008
Posts: 68

Message Posted:
21/01/2009 15:00

Join or Login to Reply
Message 219 of 254 in Discussion

Tony J has just sent me this.

Hi



please read this information...it is important advice from a solicitor in North Cyprus



There have been changes recently to the procedure for the payment of VAT (KDV) on the purchase of property in Northern Cyprus.



Previously, it was customary for VAT (KDV in Turkish) to be paid on transfer of title to the property into the name of the purchaser. However the Tax Office has recently issued a directive to all construction companies stating that VAT must be collected on completion of the construction and delivery of possession of the property to purchaser instead of transfer of title. This directive has been issued relying on a very old VAT law which has rarely been enforced by the Tax Office in the past.



In line with this directive, many vendors are therefore now invoicing their clients for VAT, which is currently 5% of the purchase price of the property, on completion of the construction. Many people have criticis



gd427man


Joined: 05/08/2008
Posts: 68

Message Posted:
21/01/2009 15:08

Join or Login to Reply
Message 220 of 254 in Discussion

Many people have criticised this new directive by the Tax Office because they fear that if the VAT is paid by a purchaser to a construction company on completion, the construction company may not account to the Tax Office for it. On transfer of title, the Tax Office requires proof that the VAT has been paid before it will allow transfer of title to take place. If the construction company has not paid this money to the Tax Office, the purchaser may not be able to take title without this being paid. Some pressure groups are lobbying the Government to try to change this practice so that VAT can be paid directly by the purchasers to the Tax Office on completion of the property instead of to the construction company to ensure that there is no risk of the construction company failing to account to the Tax Office for the VAT. However, this is not possible at present.



We are currently advising our clients only to pay VAT to the construction company in return for an official invoice



gd427man


Joined: 05/08/2008
Posts: 68

Message Posted:
21/01/2009 15:12

Join or Login to Reply
Message 221 of 254 in Discussion

(known as a ‘fatura’ in Turkish) from the construction company. This should bear the stamp of the Tax Office on it and should state the amount paid. Once a construction company has issued an official invoice, it must account for that money to the Tax Office. The invoice should be retained by the purchaser or their lawyer to produce to the Tax Office on transfer of title.



If payments of VAT are made on possession to a construction company through our client trust account, we will ensure that the correct invoice is obtained and held on file.





Sorry, I had to split that up.

In message 220 at the bottom - how do you guarantee the return of an official invoice if you pay the vat?

Do we just trust evergreen to do things right?



Cheers for now.



Wine Man


Joined: 11/09/2008
Posts: 74

Message Posted:
23/01/2009 20:44

Join or Login to Reply
Message 222 of 254 in Discussion

I too have seen the white goods packages available via Evergreen. I agree the cost of the basic White package seems reasonable - the only problem was when I asked Nurten to send some pics of the goods. The hob was GAS - I didn't think there was any gas on site - still not had a reply regarding this.



I am visiting the site from Feb 1st to 6th and am meeting an Evergreen rep on Feb 2nd to go through snagging - if all is OK I can then sort out bank details and furniture etc, etc. I am a little apprehensive about travelling incase it turns out to be more of a building site than I expect.



I am in B3(R) - does anyone else in the block want any thing checking or photos?



lets hope this is all worth it......



daily


Joined: 01/01/2008
Posts: 84

Message Posted:
23/01/2009 21:14

Join or Login to Reply
Message 223 of 254 in Discussion

wine man



you buy a gas bottle for the hob - extremely useful in the event of power cuts and really easy to source and set up - got everything i needed from the supermarket on turtle bay complex near the golf course - it also saves you on electric if you use the gas hob for brewing up/boiling water in a whistling kettle - and they last a long time before requiring replacement



hope this helps



tonyhickey



Joined: 13/06/2007
Posts: 413

Message Posted:
23/01/2009 21:18

Join or Login to Reply
Message 224 of 254 in Discussion

HI wineman I think the only Gas on Cyprus is bottle Gas. Also there are some updated pictures on the C.B.M.WEB SITE

TONY

http://crystalbaymarina1.multiply.com/



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
24/01/2009 12:49

Join or Login to Reply
Message 225 of 254 in Discussion

Hi ian

hope you enjoyed your holiday, thanks for the photos .



hi wineman

would be greatful for any information on furniture packages , have a good trip in feb



hope all crystal bayers are well

sarah



Wine Man


Joined: 11/09/2008
Posts: 74

Message Posted:
24/01/2009 14:52

Join or Login to Reply
Message 226 of 254 in Discussion

Northernlad 2 - are you looking for anything in particular, like bedroom packages or the whole lot?



I'm going to have a chat with Evergreen regarding furniture and NCI. I understand NCI are going to try and get most of the kitchen/smaller items from IKEA in the South - hopefully I'll find out more when I'm in TRNC



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
26/01/2009 12:20

Join or Login to Reply
Message 227 of 254 in Discussion

Wine Man,

We are looking for a whole furniture package, bedrooms lounge etc.



Any info would be gratefully received.



Thanks



gd427man


Joined: 05/08/2008
Posts: 68

Message Posted:
26/01/2009 14:46

Join or Login to Reply
Message 228 of 254 in Discussion

Hi all,

Had a good time, but busy looking at furniture white goods etc

I have purchased a furniture package from Aykoc furniture.



web site http://www.aykoc-furnituredesign.com

Spoke to a guy called Tercan who was really helpful.

He knows the site as I took him to my groung floor apt.

He does a package of

1 double bed inc matress & headboard

2 singles inc matress & headboard

bedside units

dining table and 6 chairs

3 piece suite

Price of £1550

you can negotiate to swap things..I have swapped the two singles for a double

Can't say what the quality is like but things in showroom seemed ok

If you contact him he has more to show you in catalogues than is on the web (hav'nt visited the web site)

He has a shop jst up from Ship Inn on opp. side look for a big Marshall sign, then shop has a gazebo outside.

He was talking of closing this shop so If you're visiting contact him first.

His factory is in Nicosia but does his metalwork in Kyrenia.

He's worth a visit.



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
27/01/2009 23:58

Join or Login to Reply
Message 229 of 254 in Discussion



Had a look at the web site (above), furniture seems ok, price looks good.



Anybody else bought from them out there and can recommend or not as the case me be the furniture quality.



suntanman



Joined: 18/04/2007
Posts: 721

Message Posted:
28/01/2009 00:40

Join or Login to Reply
Message 230 of 254 in Discussion

Have you tried Olgun?

http://www.olgungroup.com/

We bought beds, settee's and other items from them. Prices reasonable, happy with the quality and they have a showroom near Girne, on the road from CBM



suntanman



Joined: 18/04/2007
Posts: 721

Message Posted:
28/01/2009 00:44

Join or Login to Reply
Message 231 of 254 in Discussion

They also gave us prices for linen items (bedding etc) but we brought this over from UK so, can't make comment on quality.



corbytown


Joined: 05/08/2008
Posts: 327

Message Posted:
29/01/2009 11:12

Join or Login to Reply
Message 232 of 254 in Discussion

hello all

well the new completion date is the 15th of feb !

as gd427 says " no chance " and i totally agree with him.

Have we all decided that we are not paying the final balance until the entire site is complete ? as the contract states

We are back there the end of March and i honestly do not think it will be all done by then.

tom



gd427man


Joined: 05/08/2008
Posts: 68

Message Posted:
30/01/2009 15:09

Join or Login to Reply
Message 233 of 254 in Discussion

Hi all,

I have paid the vat, elec connect fee and shortfalls but will not pay the final £2500 until complete.

I told Nurten this face to face.and she had no complaints

She said she sent out the final bills because the builders said that they would complete by mid Jan. (she should have gone and checked herself)

I think they will have a hard time charging us £500 interest.

Has the @pay by@ date been moved back?



Anyway - furniture !

Here are some names.

Olgun (they furnished the CBM showhome.www.olgungroup.com

e-mail info@olgungroup.com



ipek group. http://www.ipekhomedecor.com

e-mail ipekdekor@yahoo.com

There was another company I looked at called blue door /citrus interiors but when I went in January the shop was empty and up for let.

but the web site is still working. http://www.thebluedoorcyprus.com.

tel 0329815 9902-07

0533 840 5542

prices vary can't comment on quality You pay your money and take your choice

I went for cheapest as I hope to be renting.

Cheers



Bruno


Joined: 10/01/2008
Posts: 48

Message Posted:
30/01/2009 16:13

Join or Login to Reply
Message 234 of 254 in Discussion

Hi to you all,

Can any one tell me if they have started the new marina yet I know they got the green light to go ahead but it seems to have gone a little quiet. I have B4M and am going over on 3rd April for a couple of weeks so if I can do anything for you please let me know.

Bruno



tonyhickey



Joined: 13/06/2007
Posts: 413

Message Posted:
31/01/2009 01:35

Join or Login to Reply
Message 235 of 254 in Discussion

HI all

What’s the thinking on furnishing down stairs. Our idea is just one set of rattan type

table & chairs on the patio being brought in during bad weather keeping the down stairs as clutter free and roomy as possible. Going out in four weeks and will update the crystal bay marina site. Tony.



gd427man


Joined: 05/08/2008
Posts: 68

Message Posted:
02/02/2009 15:00

Join or Login to Reply
Message 236 of 254 in Discussion

Hi,

We will be having a dining suite and 'l' shaped sofa downstairs and it will be a bit cramped due to the loacatiopn of the tv.point making us have the sofa into the room.

It all acme in the package but the table is glass an wrought iron and we have had the seats covered in outdoor material so we may put outside.

We may also look at relocating the tv and wall mount it, then we can turn sofa round so the back is against the wall...lots more space.

By the way I told you alll that the guys name from Aykoc furniture was Tercan...it's not. Tercan is in the Arcelik shop, near the roundabout with the fountains.

The furniture man in Aytac.

(see massage 228)

Best to take a tape measure and you can decide what's right for you when viewing furniture.

Have a good time.

Ian.



gd427man


Joined: 05/08/2008
Posts: 68

Message Posted:
02/02/2009 15:06

Join or Login to Reply
Message 237 of 254 in Discussion

Bruno,

See massage 57 & 58 regarding Marina,

Havn't heard anything since,

You may hear more when you're there.

Cheers.



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
04/02/2009 11:06

Join or Login to Reply
Message 238 of 254 in Discussion

Hi all,



Just had a brief update from our mate in NC. He states the site progressing well, all drains in, topsoil going down and statrting to put flagstones around pools. He thinks there is still 4 - 6 weeks work before site finished.



Keith



gd427man


Joined: 05/08/2008
Posts: 68

Message Posted:
04/02/2009 14:42

Join or Login to Reply
Message 239 of 254 in Discussion

Great news.

Hopefully people going out there in the coming months will take pics and keep us informed.

From what I saw in january I think the clubhouse etc will be the last thing to be finished.

Maybe the Evergreen construction update sit will keep us informed (joke).

Cheers.



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
09/02/2009 21:20

Join or Login to Reply
Message 240 of 254 in Discussion

Wineman,

Are you back from NC, if so how did your visit to the site go and when do you think ALL will be completed?



Keith



Wine Man


Joined: 11/09/2008
Posts: 74

Message Posted:
10/02/2009 19:07

Join or Login to Reply
Message 241 of 254 in Discussion

Hello,



I am back from NC but only just now been able to get on internet becauce during the snow (I missed most of...) a car hit our telegraph pole and allthe lines we snapped.



My apartmet PB3(r) only had some minor snags to complete. On the complex the apartments near to the clubhouse/bar look as though they will take several months before they are finished - they are just shells. The swimming pools etc have come on a little but still someway to go. The roads/paths are taking shape and the overall grounds are being levelled where the building appears to have almost completed.



I met Nurten who said they expected the site to be ready in March - this seems un-realistic especially for the houses near the main pool. The electric/water are not connected yet and apparently once these are connected the site will not take as long to finish?? not so sure about that.



I just need it to be ready for July as we are holidaying then.



Homefront looks good for furniture -



Wine Man


Joined: 11/09/2008
Posts: 74

Message Posted:
10/02/2009 19:14

Join or Login to Reply
Message 242 of 254 in Discussion

......Following On.



Mike - owns the Homefront store (towards Alsancak) and can make almost anything. The prices are reasonable. Debra from NCI took me there and says if she can get 4/5 customers she should be able to get some deal - what that is I'm not sure.



Nurten also said she would be issuing a starter pack shortly that will invlolve everything we need from scratch. You will not have to order the entire lot just the stuff you need - gas bottle etc.



Also depending on how fussy you are there appears to be a few shops selling outdoor garden furniture that will deliver FREE if enough is ordered.



Is anyone else planning a trip soon?



To conclude I think the site will not be complete in March - hope I'm wrong...!!



markcbm


Joined: 20/11/2007
Posts: 115

Message Posted:
10/02/2009 22:26

Join or Login to Reply
Message 243 of 254 in Discussion

Hi



my daughter has been to the site today, as wine mans post realy, she took lots of pictures so will post them friday when she is back.



Mark



Wine Man


Joined: 11/09/2008
Posts: 74

Message Posted:
11/02/2009 11:01

Join or Login to Reply
Message 244 of 254 in Discussion

Markcbm - where will the pictures be posted?



markcbm


Joined: 20/11/2007
Posts: 115

Message Posted:
11/02/2009 19:49

Join or Login to Reply
Message 245 of 254 in Discussion

hi



i will put them on multiply site (link on message 224)



mark



markcbm


Joined: 20/11/2007
Posts: 115

Message Posted:
13/02/2009 23:44

Join or Login to Reply
Message 246 of 254 in Discussion

Hi



some pictures posted from 9/02/09 on multiply (link ref on message 224)



it's took me all nignt so hope you like !



i would say a few months to finish yet



mark



markcbm


Joined: 20/11/2007
Posts: 115

Message Posted:
13/02/2009 23:50

Join or Login to Reply
Message 247 of 254 in Discussion

Hi



some pictures posted from 9/02/09 on multiply (link ref on message 224)



it's took me all nignt so hope you like !



i would say a few months to finish yet



mark



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
14/02/2009 13:26

Join or Login to Reply
Message 248 of 254 in Discussion

hi all

thanks for the pictures mark.

We have been told our snagging has been completed , arranging for a friend to go visit to see.

We have ordered some of the white goods from evergreen but going to look for fridge with bigger freezer

Kieth out the end of april and then we are all going end of july , so hoping all up and running by then.

Will anyone be out in the school summer hoildays have a 16 son wondered if any kids will be there ?

cannot wait to be out in the sun after all this snow lol

sarah



TonyJ


Joined: 18/02/2008
Posts: 34

Message Posted:
14/02/2009 13:47

Join or Login to Reply
Message 249 of 254 in Discussion

Hi All,



I will be going out to CBM from Tuesday 17th Feb to Sat 21st, so if anyone needs anything checking......?



Regards



Tony



Wine Man


Joined: 11/09/2008
Posts: 74

Message Posted:
16/02/2009 19:59

Join or Login to Reply
Message 250 of 254 in Discussion

Northern Lad2,



We are going July 5th to 19th - got 3 kids aged 8, 6 & 4. I think we will just be going home when you arrive in CBM.



Tony J - please give us an update on how the pools are progressing?



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
17/02/2009 22:48

Join or Login to Reply
Message 251 of 254 in Discussion

hi all

tony have a great time

wineman

mines a little older 16 but good for baby sitting lol lets hope we have a site up and running by july

still waiting to see how completed snagging went

sarah and keith



tlvccom


Joined: 29/09/2008
Posts: 327

Message Posted:
18/02/2009 14:18

Join or Login to Reply
Message 252 of 254 in Discussion

I own a 2 bed garden apartment crystal bay park, almost finished £35k for a quick sale. Blck B APART 1



tonyhickey



Joined: 13/06/2007
Posts: 413

Message Posted:
18/02/2009 21:33

Join or Login to Reply
Message 253 of 254 in Discussion

Hi all

Have posted some new pictures from nurton on the web site

http://crystalbaymarina1.multiply.com/

tony



northernlad 2


Joined: 28/07/2008
Posts: 132

Message Posted:
19/02/2009 12:40

Join or Login to Reply
Message 254 of 254 in Discussion

hi tony

thanks for the photos , nice to see tiles in pool and looks like it is moving on.

would like to have seen some workers on site lol

sarah



North Cyprus Forums Homepage

Join Cyprus44 Forums | Already a member? Login

You must be a member and logged in, to post replies and new topics.