Lemtich



Joined: 15/02/2007
Posts: 355


Message Posted:
10/05/2008 22:11

Join or Login to Reply
Message 1 of 104 in Discussion

Here's the photos of the aircon unit for the middle bedroom as fitted by F & J for those wanting something to retreat to from the summer heat. They've managed to fit it on the outside wall rather than have it sitting on the balcony taking up valuable room, cost £240.



http://i200.photobucket.com/albums/aa219/Lemtich/CIMG1213.jpg



http://i200.photobucket.com/albums/aa219/Lemtich/CIMG1214.jpg



Andrew Cowley, who is the contact for F & J can be reached on : -



andrewcowley2845@gmail.com



if you would like one as well. Its a small bedroom and if you close the window to keep the mozzies out, could be sweltering.



This as the first message of the continuation from the previous thread, I'd be happy if you could follow on from here.



Cheers



Lem





JamesB


Joined: 07/02/2007
Posts: 353


Message Posted:
11/05/2008 22:36

Join or Login to Reply
Message 2 of 104 in Discussion

Looks a neat job, Good job health and safety weren't around while they were fitting it..........eh Paul?



JB



Lemtich



Joined: 15/02/2007
Posts: 355


Message Posted:
12/05/2008 13:08

Join or Login to Reply
Message 3 of 104 in Discussion

BTTT



Lem



GailForce


Joined: 15/03/2008
Posts: 44


Message Posted:
16/05/2008 09:26

Join or Login to Reply
Message 4 of 104 in Discussion

Hi Lem,



I contacted the above email address for the air con and have had no reply. Is there an alternative email?



Thanks



kavenkoy



Joined: 10/04/2008
Posts: 300


Message Posted:
16/05/2008 09:43

Join or Login to Reply
Message 5 of 104 in Discussion

defo that one gailforce



he done mine



andrewcowley2845@gmail.com



kav



GailForce


Joined: 15/03/2008
Posts: 44


Message Posted:
16/05/2008 09:47

Join or Login to Reply
Message 6 of 104 in Discussion

Okay.. thanks.. I'll just email him again.



Do you know of any new progress with the apartments?? The last I spoke to Ilker he pretty much guaranteed the apartments and phase will be completely by the end of this month! I guess we can live and hope!



Lemtich



Joined: 15/02/2007
Posts: 355


Message Posted:
16/05/2008 10:42

Join or Login to Reply
Message 7 of 104 in Discussion

That link on the original posting from "A Place in the Sun" now has a couple of updates on Phase 2 on it.



http://www.thetravelmag.com/North_cyprus_property_part_2.htm



Lem



GailForce


Joined: 15/03/2008
Posts: 44


Message Posted:
16/05/2008 12:30

Join or Login to Reply
Message 8 of 104 in Discussion

Brill thanks for that.



Does anyone have any internal pics of flats that have been furnished or occupied just to give an idea how they look lived in!



Lemtich



Joined: 15/02/2007
Posts: 355


Message Posted:
16/05/2008 13:04

Join or Login to Reply
Message 9 of 104 in Discussion

Here are some photos of the interior of a stage 1 apartment, just click on the link to see the photos, stage 2 apartments are being built are in the background of the balcony shots.







http://i200.photobucket.com/albums/aa219/Lemtich/Photo08_14A.jpg



http://i200.photobucket.com/albums/aa219/Lemtich/Photo07_13A.jpg http://i200.photobucket.com/albums/aa219/Lemtich/Photo04_10A.jpg



http://i200.photobucket.com/albums/aa219/Lemtich/Photo06_12A.jpg



http://i200.photobucket.com/albums/aa219/Lemtich/Photo11_17A.jpg



http://i200.photobucket.com/albums/aa219/Lemtich/Valsclass102.jpg



http://i200.photobucket.com/albums/aa219/Lemtich/Photo13_19A.jpg



http://i200.photobucket.com/albums/aa219/Lemtich/Photo28_34A.jpg



http://i200.photobucket.com/albums/aa219/Lemtich/Photo18_24A.jpg



http://i200.photobucket.com/albums/aa219/Lemtich/P1010607-1.jpg



http://i200.photobucket.com/albums/aa219/Lemtich/Valsclass100.jpg



http://i200.photobucket.com/albums/aa219/Lemtich/Photo15_21A.jpg



http://i200.photobucket.com/albums/aa219/Lemtich/Photo03_9A.jpg



http://i200.photobucket.com/albums/aa219/Lemtich/Photo20_26A.jpg







Lem







GailForce


Joined: 15/03/2008
Posts: 44


Message Posted:
16/05/2008 15:18

Join or Login to Reply
Message 10 of 104 in Discussion

That's for the pics Lem. They look great!



smudge



Joined: 07/04/2008
Posts: 71


Message Posted:
17/05/2008 14:47

Join or Login to Reply
Message 11 of 104 in Discussion

Anyone know if there is water in the pool yet?



kavenkoy



Joined: 10/04/2008
Posts: 300


Message Posted:
17/05/2008 16:05

Join or Login to Reply
Message 12 of 104 in Discussion

yes ,water in pool upto the lights yesterday lunch time.



GailForce


Joined: 15/03/2008
Posts: 44


Message Posted:
17/05/2008 16:57

Join or Login to Reply
Message 13 of 104 in Discussion

Is that phase one's pool?



smudge



Joined: 07/04/2008
Posts: 71


Message Posted:
17/05/2008 19:11

Join or Login to Reply
Message 14 of 104 in Discussion

ooo fab. yes i was meaning phase one.



kavenkoy



Joined: 10/04/2008
Posts: 300


Message Posted:
18/05/2008 05:50

Join or Login to Reply
Message 15 of 104 in Discussion

yes phase1 .



phase 2 have had it filled in now and a extra block is going there instead lol



kav



cooper



Joined: 23/10/2007
Posts: 213


Message Posted:
18/05/2008 08:37

Join or Login to Reply
Message 16 of 104 in Discussion

Nice one Kav !



Did you use Frank & Joan for your white goods ?



Cooper



kavenkoy



Joined: 10/04/2008
Posts: 300


Message Posted:
18/05/2008 09:20

Join or Login to Reply
Message 17 of 104 in Discussion

cooper



i used karen (got at toros) Karen.harriswakenshaw@gmail.com



bought the indesit etc £1300 if i recall for lot



kav



cooper



Joined: 23/10/2007
Posts: 213


Message Posted:
18/05/2008 10:16

Join or Login to Reply
Message 18 of 104 in Discussion

Cheers Kav.



Cooper



tonyhickey



Joined: 13/06/2007
Posts: 140


Message Posted:
18/05/2008 11:55

Join or Login to Reply
Message 19 of 104 in Discussion

iT COULD BE FUN WHEN THERE COME TO REPAIR THAT AIR CON UNIT ON THE OUT SIDE WALL

TONY



Lemtich



Joined: 15/02/2007
Posts: 355


Message Posted:
18/05/2008 12:30

Join or Login to Reply
Message 20 of 104 in Discussion

Sky 'ooks, mate! That's wot you need, sky 'ooks!



Lem



Lemtich



Joined: 15/02/2007
Posts: 355


Message Posted:
20/05/2008 08:18

Join or Login to Reply
Message 21 of 104 in Discussion

BTTT



Lem



stickle


Joined: 20/02/2008
Posts: 61


Message Posted:
20/05/2008 11:27

Join or Login to Reply
Message 22 of 104 in Discussion

Does anyone know of what further progress has been made to the interior of the blocks in Phase two? Have external doors been fitted? Is there only activity on the site itself and not the apartmetns themselves/ Any update would be appreciated.



GailForce


Joined: 15/03/2008
Posts: 44


Message Posted:
21/05/2008 00:06

Join or Login to Reply
Message 23 of 104 in Discussion

Well I got news today that my flat which is in block 4 is pretty much complete. I have all my kitchen units in, all the tiles have been done, my wardrobs are in and my bathroom is finished. I also got news that block 4 has been painted green which I wasn't too happy about, but very excited that there is progression. I think all that is missing at the mo is the front door.



If anyone else knows of any progress please let us know. Also, if anyone has seen the colours please give some feedback as I would have pref the plain cream!!!



Lemtich



Joined: 15/02/2007
Posts: 355


Message Posted:
21/05/2008 09:54

Join or Login to Reply
Message 24 of 104 in Discussion

I heard all the blocks are going to be painted different shades of pastel colours and Phase 2 is going to be called "Neapolitan Apartments"!



Lem



stickle


Joined: 20/02/2008
Posts: 61


Message Posted:
21/05/2008 10:03

Join or Login to Reply
Message 25 of 104 in Discussion

Thanks Gailforce, I have to agree about the colours. The kitchen units were in place in early April but no bathroom equipment. The worktops were not fitted and no external doors were fitted to the apartments. So hopefully this is progress. Again, thanks.



kavenkoy



Joined: 10/04/2008
Posts: 300


Message Posted:
21/05/2008 15:44

Join or Login to Reply
Message 26 of 104 in Discussion

i heard that the front doors were on the same boat from china as the kibtek electricity meters ,lol.



kav



GailForce


Joined: 15/03/2008
Posts: 44


Message Posted:
21/05/2008 20:20

Join or Login to Reply
Message 27 of 104 in Discussion

lol Kav.



I know stickle the colours are rather disappointing! The whole point of buying in phase two was because we liked what we saw in Phase one!! Oh well as long as there is progression I am happy..



Is there anyone who has actually moved into their properties in either phase one or two? Phase two I doubt but I thought I would ask anyway. As my feedback is just from what I have been told and not really seen??



Robbie


Joined: 20/02/2008
Posts: 39


Message Posted:
22/05/2008 10:17

Join or Login to Reply
Message 28 of 104 in Discussion

I was also told that the apartments are going to be different colours than of phase 1 and the name instead of being called 'neapolitan' they told me they are going to be "The Rainbow Residence' and guess who is running the maintenance etc 2 blokes named 'Bungle' and 'Zippy' .



Up above the apartments of Cyprus Rainbow flying high ........



Mickey Mouse



Joined: 11/04/2008
Posts: 10


Message Posted:
22/05/2008 15:36

Join or Login to Reply
Message 29 of 104 in Discussion

Greetings Gailforce,



Not that I’m always here in WWW3, yours being WWW4, if there’s anything you need to know about progress of Phase 2, then just ask.



On the basis I kept photos going back to 2005 of Phase One, like every month, based upon adverse experience, “Welcome to the Land of Kavanlar and the Living Dead”, I checked my photographic records.



The current stage of Phase two, is liken to Phase One 30/07/2007.



Move in, habitable date, was 01/11/2008.



This should give you some idea as to when, if ever, you finally take finished delivery.



Imagine, a simple thing, like internal lights for the common areas, has only taken 9 months, but finally 20/05/2008, there is now water in Phase One’s pond.



Happy Days.



MM



stusparks


Joined: 17/05/2008
Posts: 22


Message Posted:
22/05/2008 15:58

Join or Login to Reply
Message 30 of 104 in Discussion

Hi,

I as told by Ilker that phase 2 would be complete, first in march then April and then the end of May. The estate agent said that he would hang himself if the apartments were not complete by the end of July. Looks like he might have too.

I would also have been happier with the same colour as phase 1. However right now a true completion date would be great.





Cheers



kavenkoy



Joined: 10/04/2008
Posts: 300


Message Posted:
22/05/2008 17:00

Join or Login to Reply
Message 31 of 104 in Discussion

its a great thread as allways ,lol.



never one to appear negative .MM has it right .



i doubt it will be this year ,may be if anything winter .



knowing and seeing the speed it takes some workers lol.



one small thing is lights on phase1 were awaiting it signed off and meters ,kavanlar must have learnt from that ?



kav



debdebs


Joined: 22/05/2008
Posts: 32


Message Posted:
22/05/2008 17:11

Join or Login to Reply
Message 32 of 104 in Discussion

Hi everyone,

I am moving into Block 5 in September. We arrive in Cyprus at the end of July and will be staying at the Riverside until our furniture arrives. We have decided to take the plunge and move out there permanently. I am married with 2 kids, ages 14 and 12. I would love to hear from anyone who is doing the same as us. Glad to hear there is finally water in the pool.



Lemtich



Joined: 15/02/2007
Posts: 355


Message Posted:
22/05/2008 17:46

Join or Login to Reply
Message 33 of 104 in Discussion

Hi debdebs



Are you in Phase 1 or Phase 2?



Lem



High Priest


Joined: 12/04/2008
Posts: 65


Message Posted:
22/05/2008 19:31

Join or Login to Reply
Message 34 of 104 in Discussion

Hi Gailforce



How did you get to know about the recent progress including bathrooms being fitted. We have being e-mailing Ilker and also Hulya to request a completion date so that we can plan leave from work, book flights and get REALLY excited!! We have not had any response.



We would really appreciate photos from anyone or up to date info. We are also concerned about the colours and think that it may be some kind of wind-up.



Do anyone have any alternative e-mail address for Ilker apart from the Kavanlar@superonline?



This site is our lifeline at the moment!



debdebs


Joined: 22/05/2008
Posts: 32


Message Posted:
22/05/2008 19:36

Join or Login to Reply
Message 35 of 104 in Discussion

Hi Lem,



We are in phase 1, we bought in January when we were on holiday. Apparently it was the last apartment in that phase. We later heard that someone had backed out, couldnt get a mortgage. Dont know whether we have been ripped off with the price,seems the apartments are selling for £58,000, we paid a lot more than that. When we questioned the price they said it was because the apartment was finished and we didnt have to wait like the other phases.



Debs



Lemtich



Joined: 15/02/2007
Posts: 355


Message Posted:
22/05/2008 21:12

Join or Login to Reply
Message 36 of 104 in Discussion

Hello Debs



I guess we are going to be neighbours, I'm in apartment 5. I signed a contract in June 2005 and paid £49950 but it was a long time coming.



Lem



Lemtich



Joined: 15/02/2007
Posts: 355


Message Posted:
22/05/2008 21:13

Join or Login to Reply
Message 37 of 104 in Discussion

Hello Debs



I guess we are going to be neighbours, I'm in apartment 5.



I signed a contract in June 2005 and paid £49,950 but it was a long time coming.



Lem



Lemtich



Joined: 15/02/2007
Posts: 355


Message Posted:
22/05/2008 21:34

Join or Login to Reply
Message 38 of 104 in Discussion

Sorry about those last 2 duplicates. There must be an echo in here.



By the way, to all on Phase 2.



As you are owners, once you have all bought your apartments in a block, so long as you all agree on a colour and share paying a painter, you can decide to have it painted whatever colour you like.



Lem





kavenkoy



Joined: 10/04/2008
Posts: 300


Message Posted:
22/05/2008 21:38

Join or Login to Reply
Message 39 of 104 in Discussion

hi debs



are you kids boys or girls?



we will be out in august and have 17,16 boys and 12yr girl .





kavenkoy



Joined: 10/04/2008
Posts: 300


Message Posted:
22/05/2008 21:41

Join or Login to Reply
Message 40 of 104 in Discussion

hi HP



iam going out in 3weeks so i will gladly give you progress report and pictures if required.



we been here before with kavanlar and broken dates etc .



kav



High Priest


Joined: 12/04/2008
Posts: 65


Message Posted:
22/05/2008 22:36

Join or Login to Reply
Message 41 of 104 in Discussion

Hi Kav



Thanks. Will look forward to your update. We have penthouse in block 5 phase 2.



HP



kavenkoy



Joined: 10/04/2008
Posts: 300


Message Posted:
23/05/2008 05:34

Join or Login to Reply
Message 42 of 104 in Discussion

just let me know where block 5 (e) is then please as numbers flow and which pent



kav



debdebs


Joined: 22/05/2008
Posts: 32


Message Posted:
23/05/2008 08:52

Join or Login to Reply
Message 43 of 104 in Discussion

Hi Kavenkoy,



I have a son who is nearly 15 and a daughter of 12. Are you going out there to live permanently?



Debs



Lemtich



Joined: 15/02/2007
Posts: 355


Message Posted:
23/05/2008 09:00

Join or Login to Reply
Message 44 of 104 in Discussion

Hi Debs



I have 4 teenage girls, one 15 year old, two 17 year olds, one with baby and partner, and a 19 year old who will be celebrating her 20th birthday when we come out at the end of July for 4 weeks.



We will probably be having a few barbi's on the balcony so come along and meet us lot as well as Kav and family!



Lem



smudge



Joined: 07/04/2008
Posts: 71


Message Posted:
23/05/2008 10:29

Join or Login to Reply
Message 45 of 104 in Discussion

Hi all

We'll be arriving with a 15 year old and a 17 year old.

Looks like hopefully we'll have plenty to keep the 'kids' occupied round the pool this year. We arrive on 28 July for 2 weeks. Look forward to meeting you all.

smudge



kavenkoy



Joined: 10/04/2008
Posts: 300


Message Posted:
23/05/2008 10:58

Join or Login to Reply
Message 46 of 104 in Discussion

debs



if i could sell the kids or even trade them for a second hand scooter i would be out to live like a shot ,lol.



be out aug 5th for 2 wks.



smudge 15yr and 17 yr be hanging around with a bit of a gang then lol.



hoodies around the pool .



they got a few mates out from last summer and know there way around as well as being to luck after them selves (boys )



LEM



best get a extension on your balcony for the bbqs



kav



Lemtich



Joined: 15/02/2007
Posts: 355


Message Posted:
23/05/2008 11:50

Join or Login to Reply
Message 47 of 104 in Discussion

I'd hold the Barbi on the roof but with a parapet only 2 ft high I think it would be dangerous for the kids.



Lem



debdebs


Joined: 22/05/2008
Posts: 32


Message Posted:
23/05/2008 18:52

Join or Login to Reply
Message 48 of 104 in Discussion

Hi all,

Cant wait to get out there,we have been so busy sorting everything out at this end for the big move. We are moving into apartment 2,block 5, so maybe some of you might be my close neighbours. We are flying out on the 25th July and staying at the Riverside, but will be calling at the apartment to sort things out before the furniture arrives. Anyway I am looking forward to meeting you all and maybe we can get together for a drink or two.



debs



smudge



Joined: 07/04/2008
Posts: 71


Message Posted:
24/05/2008 11:30

Join or Login to Reply
Message 49 of 104 in Discussion

It would be lovely to meet up with you when we are out there. We are in block 1.

Drinks would be a lovely idea.

Smudge



Janann


Joined: 07/03/2008
Posts: 35


Message Posted:
25/05/2008 14:40

Join or Login to Reply
Message 50 of 104 in Discussion

For your information there are children playing in the pool today and the adults are enjoying a beer and a chat. Looking forward to seeing you all enjoying the same when you arrive.



Can I just mention that the colour of phase 2 appears to be just green, they have painted approx half. Looks like the different colours painted in strips on a few walls were for decision making only. It is a pastel green and not garish. It amuses me at the quick wit of you lot - Neapolitan - good one Lem. Lamp posts have now been erected and they are tiling around the pool area but the inner pool has not yet been tiled.



cooper



Joined: 23/10/2007
Posts: 213


Message Posted:
25/05/2008 18:07

Join or Login to Reply
Message 51 of 104 in Discussion

Thanks for the update Jannan.



Cooper



stickle


Joined: 20/02/2008
Posts: 61


Message Posted:
25/05/2008 20:26

Join or Login to Reply
Message 52 of 104 in Discussion

Thanks for the update.

Is there any progress on the internal of the apartments?



Janann


Joined: 07/03/2008
Posts: 35


Message Posted:
26/05/2008 04:48

Join or Login to Reply
Message 53 of 104 in Discussion

Hi Stickle - sorry not been round to look but someone has had blinds put up so it must be pretty much finished. Still no main door fitted to apartment entrances yet though.



Lemtich



Joined: 15/02/2007
Posts: 355


Message Posted:
26/05/2008 10:21

Join or Login to Reply
Message 54 of 104 in Discussion

My mate is hopefully going around to take a few photos of the site so I'll post them here as soon as.



Lem



stickle


Joined: 20/02/2008
Posts: 61


Message Posted:
26/05/2008 10:23

Join or Login to Reply
Message 55 of 104 in Discussion

Thanks to both of you. Hope life out there is warm sunny and pleasant.



High Priest


Joined: 12/04/2008
Posts: 65


Message Posted:
26/05/2008 10:23

Join or Login to Reply
Message 56 of 104 in Discussion

Hi Janann,



Thankyou for taking the time to update on phase 2. Externally, would you say just the inside of the pool, main doors and painting are left to be completed? Is the gazebo/bandstand up yet?



We still haven't had responses from Ilker. Did he just contact people on Phase 1 to say your apartment is ready, did you have to pester or did he give you notice to plan?



Regards



HP



Janann


Joined: 07/03/2008
Posts: 35


Message Posted:
26/05/2008 10:43

Join or Login to Reply
Message 57 of 104 in Discussion

Pester is not the word, hounded more like it but we moved here in May last year so we made his life hell until we could move in. They are tiling the gazebo area so the gazebo will not be built until they have finished. Had a nosey from our roof and could see that a couple of the blocks do infact have the main entrance door fitted. Road still to have tarmac layed then it will be pretty tidy. Should not have a problem having white goods/furniture delivered to site now.



Lemtich



Joined: 15/02/2007
Posts: 355


Message Posted:
26/05/2008 11:37

Join or Login to Reply
Message 58 of 104 in Discussion

I'd like to second Jan's comment. Ilker will only move unless he has you on the phone every few days. Keep it light and good humoured but keep it persistant, he will respect you for it.



If he says the carpenter/plumber/electrician is going in next Wednesday, ring on Tuesday to "confirm" by way of reminder.



Lem



GailForce


Joined: 15/03/2008
Posts: 44


Message Posted:
26/05/2008 13:39

Join or Login to Reply
Message 59 of 104 in Discussion

Hi HP sorry haven't been on the forum for a couple of days. I bought my apartment off a developer who has 3 blocks in phase 2 - she works closely with Ilker and the site owner, she has been able to hurry the whole thing along for us and has been great. We get all our info from her as she is always in contact.



From all the feedback on the forum looks as though things are going smoothly at the moment and hopefully will be completed soon.



Janann thank you for all you insight. We are due out in July 22nd - we are hoping to stay in our flat. Do you think it will be finished or will I have to stay in a hotel? Hoping to order the furniture from over here in London and they my husband will be coming out end of June to get the water and elec connected.. anyone know time frame for connection, do you have to apply first and then wait. Have heard many different things.





High Priest


Joined: 12/04/2008
Posts: 65


Message Posted:
26/05/2008 13:50

Join or Login to Reply
Message 60 of 104 in Discussion

Hi All



We have Hulya's contactmob. number which is not answered. Also Ilker no. from his business card is not answered. Emails are not responded to. Does anyone have a direct contact number for Ilker that they could pass on. You can email personally if you wish.



Best Wishes



HP



Lemtich



Joined: 15/02/2007
Posts: 355


Message Posted:
26/05/2008 16:05

Join or Login to Reply
Message 61 of 104 in Discussion

HP



Have emailled you.



Lem



High Priest


Joined: 12/04/2008
Posts: 65


Message Posted:
26/05/2008 17:08

Join or Login to Reply
Message 62 of 104 in Discussion

Lem



Email has not arrived. Can you re-send, please



HP



Janann


Joined: 07/03/2008
Posts: 35


Message Posted:
26/05/2008 17:20

Join or Login to Reply
Message 63 of 104 in Discussion

Hi Gailforce. You are in the lap of the gods with the electric. You could be one of the lucky ones who gets a meter within a few weeks after paying your installation fee but many have waited months due to the lack of meters on the island this year. Our water meter was fitted within a couple of weeks. The picture will be clearer when your husband visits at the end of June. Your site is farther advanced than phase one when we moved in. You should not have much trouble booking in a hotel at the last min if needed.



Mickey Mouse



Joined: 11/04/2008
Posts: 10


Message Posted:
26/05/2008 18:11

Join or Login to Reply
Message 64 of 104 in Discussion

Hi there, High Priest.



No reply from either one infamous Ilker or Hula, whether by phone, Bush Telegraph, or E-Mail.



The only time you will hear from either, is when they want money.



Never Mind, keep your Pecker Up and as to Phase two, they are now painting, green, the outsides, painting over (green) all the unpainted bits they missed before.



Unreal, they now have six sets of scafolding, absolutely unreal and paint in the Dark!!



This is progress indeed.



July, well, wishful thinking, but which year!!









Lemtich



Joined: 15/02/2007
Posts: 355


Message Posted:
26/05/2008 18:22

Join or Login to Reply
Message 65 of 104 in Discussion

Hi MM



Any chance you can get a photo of the Phase 2 colour scheme?



Hi HP



Have resent email.



Lem



Lemtich



Joined: 15/02/2007
Posts: 355


Message Posted:
26/05/2008 19:01

Join or Login to Reply
Message 66 of 104 in Discussion

Latest photo of Kavanlar Phase 2 colour scheme.



http://i200.photobucket.com/albums/aa219/Lemtich/balcony-view2.jpg



Lem lol



Turtle



Joined: 28/05/2007
Posts: 214


Message Posted:
26/05/2008 19:50

Join or Login to Reply
Message 67 of 104 in Discussion

Glad to see its enviroment friendly ?



Lemtich



Joined: 15/02/2007
Posts: 355


Message Posted:
26/05/2008 21:20

Join or Login to Reply
Message 68 of 104 in Discussion

Its not only that, Phase 2 is luminous! I heard they got the paint as a job lot from some nuclear power station somewhere.



Nothing like a nice green glow to liven up Alsancak at night!



Still it will save on installing perimeter lighting!



Lem



GailForce


Joined: 15/03/2008
Posts: 44


Message Posted:
26/05/2008 22:47

Join or Login to Reply
Message 69 of 104 in Discussion

Lem I have emailed you a pic of phase two painted - one I was sent. Maybe you could post in forum



GailForce


Joined: 15/03/2008
Posts: 44


Message Posted:
26/05/2008 22:49

Join or Login to Reply
Message 70 of 104 in Discussion

Thanks for all the info Janann hopefully the progress will continue and we can all enjoy our summer!!!!!



debdebs


Joined: 22/05/2008
Posts: 32


Message Posted:
27/05/2008 09:47

Join or Login to Reply
Message 71 of 104 in Discussion

Does anyone know the full address of the apartments, we did have it wrote down but unable to make out the writing.



Wish I was out there now, it is absolutely peeing down here in York today, I am on holiday for a week so i hope it brightens up.



Debs



kavenkoy



Joined: 10/04/2008
Posts: 300


Message Posted:
27/05/2008 10:22

Join or Login to Reply
Message 72 of 104 in Discussion

kavanlar "kavankoy" sitesi 1(or 2 etc )

block a (or b ,c ,d etc)

appartment 1(or 2,3,4 etc )

sht munur sokak

alsancak

mersin 10





kav



debdebs


Joined: 22/05/2008
Posts: 32


Message Posted:
27/05/2008 12:36

Join or Login to Reply
Message 73 of 104 in Discussion

Thanks for that Kav, gonna have fun pronouncing it. lol



Debs



nostradamus


Joined: 15/04/2008
Posts: 13


Message Posted:
27/05/2008 14:56

Join or Login to Reply
Message 74 of 104 in Discussion

Does anyone have any idea when the large - and getting larger by the day - hole in the road on Phase 1 is going to be filled in? If it gets much deeper, we'll be able to visit Australia without bothering to buy an airline ticket. In my professional capacity as a soothsayer, I did foresee some time ago that anybody living round the back would need to purchase a 4 x 4 and I fear I am correct (as ever).



What say you Mickey Mouse??!



High Priest


Joined: 12/04/2008
Posts: 65


Message Posted:
27/05/2008 16:35

Join or Login to Reply
Message 75 of 104 in Discussion

Just spoken to Ilker + he said all on phase 2 are finished apart from landscaping + pool. We have also had pictures today from Unwins of our apt 5 block 5 inside + out . External door on , sink in , extractor fan in , worktops on , everything looks good although no bathroom pictures . Ilker said the electrics are to be inspected 16 June + the government will take 2 weeks to complete . So he said booking 1st 2 weeks in July with 1st week in hotel to clean , deliver furn. + white goods + get water / elec meters should be fine , but I should ring him in 2 weeks to make sure . In fact he said ring him anytime . He also said that there is no shortage of meters anymore , but he won,t get one for us , we must go ourselves .