Kavanlar Apartments Alsancak Part 6

North Cyprus Forums Homepage

Join Cyprus44 Board | Already a member? Login

Popular Posts - List of popular topics discussed on our board.

You must be a member and logged in, to post replies and new topics.

cooper



Joined: 23/10/2007
Posts: 213


Message Posted:
30/07/2008 18:16

Join or Login to Reply
Message 1 of 79 in Discussion

Here we go again folks.



Cooper



GailForce


Joined: 15/03/2008
Posts: 44


Message Posted:
31/07/2008 08:44

Join or Login to Reply
Message 2 of 79 in Discussion

Me again!



Just want to let you all know that work on the site is still going on. Apartments are having final finishing touches done with paint work inside and on the balconies.



You may find that once you are out here, you will have to deal with a few snagging issues but it is all worth while and needs individual attention to move things along.



There is not water and electricity on the site. So signing up to both shouldn't be a problem.



Have had a couple of issues with leaking water tanks on the roof but they have been dealt with.



We have had our aircon units fitted too. The one in the living room isn't in an ideal place but couldn't be fitted anywhere else.



If anyone would like me to take some pictures please let me know and I will do my best.



mackerel


Joined: 22/06/2008
Posts: 47


Message Posted:
31/07/2008 09:39

Join or Login to Reply
Message 3 of 79 in Discussion

Gailforce,

My snagging is due to start next week so would be forever grateful if you could take some photos of Block 2 Apartments 5 & 6. The last photos I got from Unwins showed tht there were no worktops in the kitchens.

You say that there is "not" water & electricity on the site:should that read "now".I owe you a beer.

Regards,

Brian



niftyduo


Joined: 27/04/2008
Posts: 23


Message Posted:
31/07/2008 19:39

Join or Login to Reply
Message 4 of 79 in Discussion

Are all the apartments on phase 2 locked up or can people still wander around them?



wysiwyg


Joined: 12/07/2008
Posts: 15


Message Posted:
01/08/2008 19:56

Join or Login to Reply
Message 5 of 79 in Discussion

Hi Gailforce, thanks for the update glad its all going OK. Would be good to see where aircon unit in lounge is going if you can send a pic to Tonro@live.co.uk . Did you lose much water from the tank?

wysiwig



kavenkoy



Joined: 10/04/2008
Posts: 300


Message Posted:
02/08/2008 05:50

Join or Login to Reply
Message 6 of 79 in Discussion

re 5



aircon in lounge is on exterior kitchen /diner wall near the breakfast bar.

and adjacent to the "kitchen door" tha leads to the balcony .



the compressor then sits on the balcony floor under the window ,a major complaint with phase 1 ers .



simply the size and weight of the unit it has to go there .



kav



cooper



Joined: 23/10/2007
Posts: 213


Message Posted:
02/08/2008 09:33

Join or Login to Reply
Message 7 of 79 in Discussion

Hi Kav, have a great holiday & say hello to the rest of the phase 1 gang for me !



Cooper



kavenkoy



Joined: 10/04/2008
Posts: 300


Message Posted:
02/08/2008 10:34

Join or Login to Reply
Message 8 of 79 in Discussion

will do cooper



3 days to go and counting lol



just spoken to lem ,he not having best of luck with his bits .



his fridge /freezer stopped working ,aircon ,water pump and now sateliite tv ,



think he must be a bad conductor lol



take care



kav



High Priest


Joined: 12/04/2008
Posts: 65


Message Posted:
02/08/2008 11:50

Join or Login to Reply
Message 9 of 79 in Discussion

Hi All on Phase 2 ,



Just got an email from Fatma from Kavanlar asking for the last 2,000 pounds to be paid + 5% vat . I have pointed out to her that Ilker said the 2,000 is to be kept hold of until the deeds are availible + we still have no aircon fitted , pergola or barbecue on the roof + we need water in the pool . I f we all stick together on this it may carry more weight . I,m willing to pay the vat I think , but its a bit much asking for full payment when important things are not completed . What do you think .



HP .



ebbern5


Joined: 03/06/2008
Posts: 29


Message Posted:
02/08/2008 12:45

Join or Login to Reply
Message 10 of 79 in Discussion

just got back



the appartment are not ready to move into on phase2, there is a lot of touching up on the interior (digs and soforth) in spite of the painting,



we are not paying tax until the deed are ready to hand over



lou



High Priest


Joined: 12/04/2008
Posts: 65


Message Posted:
02/08/2008 17:38

Join or Login to Reply
Message 11 of 79 in Discussion

Fatma has now told me to hold on to the 2,000 until deeds are handed over + I have asked her for dates on pergola,bbq fitting + water in pool . I know they are waiting for final pool + comunal area approval but they must have a date . Ilker told me pool would be filled in 1 month 3 weeks ago .



By the way who is Fatma



HP



cooper



Joined: 23/10/2007
Posts: 213


Message Posted:
02/08/2008 18:00

Join or Login to Reply
Message 12 of 79 in Discussion

Hi HP Fatma is Kavanlars new customer attorney whatever that is !



Cooper



s-Angora


Joined: 01/08/2008
Posts: 1


Message Posted:
03/08/2008 18:49

Join or Login to Reply
Message 13 of 79 in Discussion

Hi, just returned from2 weeks at Phase 1 and site is fantastic. Nice to meet many of you. Can someone let me know Ilker's email address. Many thanks, Sarah



cooper



Joined: 23/10/2007
Posts: 213


Message Posted:
03/08/2008 18:53

Join or Login to Reply
Message 14 of 79 in Discussion

The email address is kibriskavanlar@superonline.com hope this helps.



Cooper





wysiwyg


Joined: 12/07/2008
Posts: 15


Message Posted:
03/08/2008 21:50

Join or Login to Reply
Message 15 of 79 in Discussion

Hi Kav, thank you for picking this up. Can the lounge aircon unit be fitted right up to the ceiling in the position you described ? If they are lower than the ceiling does it interfere with the use of the work top below it?

regards

wysiwyg



kavenkoy



Joined: 10/04/2008
Posts: 300


Message Posted:
04/08/2008 04:39

Join or Login to Reply
Message 16 of 79 in Discussion

wysiwyg



yes the unit inside is fitted high up to the ceiling ,and it is big internal u nit (24000btu) .

the compressor is not bulky really but because of the weight has to sit on the floor ,under the window sill .



the danger could be that phase1 ers complained about it .



i suppose if they did this to ilker and not themselves he may look to change it .



the unit is great for the room and in winter really takes that night time chill off .



summer we have all the windows open and air (and dust from phase2 ,lol) circulates quite nicely .





on the work top for kitchen ,depends on your view .



we have picked the breakfast bar up and moved it to the other wall in kitchen (next to entrance to kitchen off hall) ,it makes sense for us .



this makes the diner larger and the kitchen more galley which works for us .



kav



1 more sleep then its flight time



lol



mackerel


Joined: 22/06/2008
Posts: 47


Message Posted:
05/08/2008 02:13

Join or Login to Reply
Message 17 of 79 in Discussion

Can anyone tell me if the apartments in phase 2 are open.What is the best way to make contact with Ilker to get access for measuring and snagging.Are his people (with keys) alaways on site.

Very grateful for any help as I have a lady travelling this week to snag,furnish and decorate my two apartments (numbers 5 & 6 in block 2).

Many Thanks



stickle


Joined: 20/02/2008
Posts: 62


Message Posted:
05/08/2008 08:55

Join or Login to Reply
Message 18 of 79 in Discussion

Mackeral 05338451945 is Ilkers mobile if from uk 00 90 first. When I went over the apartments were open with the keys in the doors. If they are locked then on Phase three and four there are workers and generally they can help.



ebbern5


Joined: 03/06/2008
Posts: 29


Message Posted:
05/08/2008 09:47

Join or Login to Reply
Message 19 of 79 in Discussion

hi mackerel



i just got back. because of the painting the doors were all open but no keys in locks. I would think that once work is finished they will be locked again but there should be keys about with workmen, The wiring was just being put in for electric meters and there were no water meters fitted (on our block anyway).



lou



wysiwyg


Joined: 12/07/2008
Posts: 15


Message Posted:
05/08/2008 20:51

Join or Login to Reply
Message 20 of 79 in Discussion

Hi Kav, you may be back home by now? Hope you had a good trip. Thanks for your help - good idea about moving the breakfast bar unit across. Owe you 1.

wysiwyg



cooper



Joined: 23/10/2007
Posts: 213


Message Posted:
07/08/2008 19:02

Join or Login to Reply
Message 21 of 79 in Discussion

BTTT



Cooper



High Priest


Joined: 12/04/2008
Posts: 65


Message Posted:
10/08/2008 11:33

Join or Login to Reply
Message 22 of 79 in Discussion

Hi All ,



We are not sure about paying 5% vat direct to Kavanlar . We have been advised not do this until we receive a proper invoice for the total amount + a receipt upon payment . We dont feel happy sending almost 3,000 stg in response to an email from Fatma . What happened with this on Phase 1 + what are other phase 2'ers doing .

Thanks ,



HP .



stickle


Joined: 20/02/2008
Posts: 62


Message Posted:
10/08/2008 13:24

Join or Login to Reply
Message 23 of 79 in Discussion

Paid mine as instructed by solicitor as it is due on getting posssesion. Tied in with the new law

Bill



High Priest


Joined: 12/04/2008
Posts: 65


Message Posted:
10/08/2008 19:22

Join or Login to Reply
Message 24 of 79 in Discussion

Hi Stickle ,



Were you given an invoice to the exact amount + a receipt to show in exchange for your Kocan [Deeds] when they are availible .

Also found out today we have electricity meters + water meters in block E .

Air Con to be fitted tomorrow . Good news eh Bill .



HP



stickle


Joined: 20/02/2008
Posts: 62


Message Posted:
10/08/2008 19:59

Join or Login to Reply
Message 25 of 79 in Discussion

Might keep those bloody flies off.

Invoice by Ilker then also a full receipt to the advocate. (yet to be confirmed) but it it was the advocate who informed me before Fatma. Hopefully our leccy is sorted it has become a bit of a saga. Will tell you later. Booked flights for mid Jan to Feb



Bill



mackerel


Joined: 22/06/2008
Posts: 47


Message Posted:
12/08/2008 13:06

Join or Login to Reply
Message 26 of 79 in Discussion

High Priest,

Are you in phase 2?? I thought all the blocks had numbers.

Thanks



High Priest


Joined: 12/04/2008
Posts: 65


Message Posted:
12/08/2008 14:00

Join or Login to Reply
Message 27 of 79 in Discussion

Hi Mackerel,



Yes phase 2 , no. 5 , block E . We moved in 14 July without aircon but as said before this is being fitted this week as we now have electricity . I would recommend that everyone gets to Kibtek asap to pay for their meter as it sometimes is a long wait + it seems as if they do now have meters on the Island again .



HP



High Priest


Joined: 12/04/2008
Posts: 65


Message Posted:
12/08/2008 14:17

Join or Login to Reply
Message 28 of 79 in Discussion

On the subject of APARTMENT NUMBERS , I personally think that the numbers that Kavanlar have put on our doors look temporary . Hence I have had made in England an engraved brass laminate number for our door , number is in black relief out of brass , size 5 x 5 ins approx . If anyone is interested I can get more made .



HP



High Priest


Joined: 12/04/2008
Posts: 65


Message Posted:
12/08/2008 14:28

Join or Login to Reply
Message 29 of 79 in Discussion

Hi again ,



Sorry , cost for the above is £15 + they look really smart . I,ll be bringing it over end Sept so have a look then .



HP



mackerel


Joined: 22/06/2008
Posts: 47


Message Posted:
12/08/2008 15:50

Join or Login to Reply
Message 30 of 79 in Discussion

Thanks High Priest but I am still confused as my apartments are block 2 ,apartments 5 & 6.

There is no letter in the block !!!

Just had an e-mail from Fatma telling me that they cannot fit my air conditioners and I cannot get white goods fitted until the electricity and power is connected. So don'ty know how the snagging is going to get done.



High Priest


Joined: 12/04/2008
Posts: 65


Message Posted:
12/08/2008 17:18

Join or Login to Reply
Message 31 of 79 in Discussion

Hi Mackerel ,



The appt's are now A,B,C,D,E,F,G,H , so yours is block B + there is a 1ft sq silver letter at the front of each block . Sorry should have explained this .

I can understand aircon not being fitted as the builders electricity isn't powerfull enough or so they say . There shouldn't be a problem with fridge , cooker etc . If you can get builders electric , the mains switch is in the cupboard at the bottom of the stairs they should be able to deliver . They do need testing + so does the mains , I think I would prefer to be there or arrange for someone to supervise .

Geoff Walmsley who lives in Block E , no. 4 would do this for you + snag [ he was in the building trade for 40 years ] His no. is 00905338445074 , email marion.walmsley@yahoo.com Geoff + Marion are currently looking after our appt. + are a relly great couple from Yorkshire . The other thing you could do is wait until you get out there , its normally next day delivery + all the fitting is done by the supplier .



Cheers ,

HP



stickle


Joined: 20/02/2008
Posts: 62


Message Posted:
12/08/2008 18:53

Join or Login to Reply
Message 32 of 79 in Discussion

High Priest, get one for me as previously arranged. saga with electricity goes on and on. The clerk put the appt and the block the wring way round and although they have a copy of the contract I have to re-apply after getting a refund which can take up to a month. Exasperating or what? Trying to resolve but also trying not to lose patience.



See you sept



Bill



High Priest


Joined: 12/04/2008
Posts: 65


Message Posted:
12/08/2008 22:39

Join or Login to Reply
Message 33 of 79 in Discussion

No probs Bill already sorted that out , wrapped + in the case .



Duncan .



Robbie


Joined: 20/02/2008
Posts: 39


Message Posted:
13/08/2008 11:48

Join or Login to Reply
Message 34 of 79 in Discussion

Stickle



I paid my final payment and also KDV to Fatma through my solicitor





Robbie


Joined: 20/02/2008
Posts: 39


Message Posted:
13/08/2008 13:42

Join or Login to Reply
Message 35 of 79 in Discussion

Sorry previous message should have been to High Priest not Stickle



cooper



Joined: 23/10/2007
Posts: 213


Message Posted:
13/08/2008 20:16

Join or Login to Reply
Message 36 of 79 in Discussion

Hi all, for anyone who needs their snagging overseen please give Geoff a call his number is in message 31 above. He and his wife Marion have been a absolute godsend for us, our snaggs are now completed and we can now look forward to taking our first holiday in our apartment without the trouble of having to sort out the snagging ourselves.



Cooper



mackerel


Joined: 22/06/2008
Posts: 47


Message Posted:
14/08/2008 02:20

Join or Login to Reply
Message 37 of 79 in Discussion

Robbie,

I presume that you had power and water before you made the final payment.Is that correct? I want to get mine cleared but am reluctant to do so as I am still waiting for power before the a/c's and white goods can be fitted.

Cheers



Robbie


Joined: 20/02/2008
Posts: 39


Message Posted:
14/08/2008 10:12

Join or Login to Reply
Message 38 of 79 in Discussion

Mackerel



I have no electric or water yet as i will not be there for a while so not to fussed but wanted to pay everything off .





mackerel


Joined: 22/06/2008
Posts: 47


Message Posted:
15/08/2008 10:25

Join or Login to Reply
Message 39 of 79 in Discussion

Dear All,

Has anyone heard of an option whereby you do not need an electric meter and can pay YTL150 per month for an unlimited electric supply?

How do you go about getting this and is it a permanent arrangement.

Thanks



High Priest


Joined: 12/04/2008
Posts: 65


Message Posted:
15/08/2008 13:10

Join or Login to Reply
Message 40 of 79 in Discussion

Hi Mackerel ,



Yes we were offered this when we were there , but £70 a month seemed alot to us . This may well have increased by now seeing electricity prices have just gone up alot .

You can sign up to this at Kibtek or the depot near the big fountain roundabout [ turn right coming from our end ] then you stick with it till they can fit a meter . That could be 1 month or anything up to 6 months .



HP



gemma


Joined: 10/08/2008
Posts: 8


Message Posted:
15/08/2008 17:18

Join or Login to Reply
Message 41 of 79 in Discussion

They only offer you this option if you have paid for your Meter and then they find they have run out. Usually 2 weeks later !! We signed up, its 150yt now. Had it on for 10 days, really enjoying the aircon,then noticed one morning we had a meter in !!! Silent and crafty !!! just waiting now to see if they charge us a full 150yt on top of our leky bill.



cooper



Joined: 23/10/2007
Posts: 213


Message Posted:
20/08/2008 07:25

Join or Login to Reply
Message 42 of 79 in Discussion

BTTT





Cooper



Hammers


Joined: 02/05/2008
Posts: 15


Message Posted:
20/08/2008 10:53

Join or Login to Reply
Message 43 of 79 in Discussion

Hi mackeral



Personally i would not go for the 150ytl per month option for electricity, unless you desperately need it to have aircon and white goods installed. They seem to only offer this once you have paided for your metre and are waiting for it to be fitted. Was speaking to a couple of people from phase 2 last week who took this option, to find out that a few days later their metres were fitted!! funny how they can find metres when they want too!! You then start paying through the metre.

We paid for our metre and were told it would be about 2 week, but ilker said that there are no metres again on the island, got someone checking on ours so will let you know how long it takes.

After visiting the belediyesi 4 times we eventually got our water metre fitted which was there the next day!! It cost 1300ytl + 82 building tax that you now have to pay. You can also pay for a tanker of water to be delivered whilst you are waiting for the metre, but we think it is best to get the water and electricity metres sorted as soon as you can, as the price seems to be increasing all the time ( especially the water )

If you need any advise on were to go, what you need to take and the best way to do this let me know, i'll be happy to help if i can.



Hammers





wysiwug



In reply to you previous post about air con in lounge. In phase 2 the units are being fitted on the corner section of wall between the patio doors and the dining area window. The compressor is now being mounted up high off the patio, which makes sense as they do throw out a lot of heat and it also gives you more patio space. I think they are able to do this now because the units are smaller, and in phase 2 we have not got the space over the breakfast bar, as our apartments are smaller than phase 1.



Hammers



kavenkoy



Joined: 10/04/2008
Posts: 300


Message Posted:
20/08/2008 12:00

Join or Login to Reply
Message 44 of 79 in Discussion

hammers



you wasted no time posting lol.



have a good flight home ?



take care to you all catch up soon



kav



ps thanks for the bottle



wysiwyg


Joined: 12/07/2008
Posts: 15


Message Posted:
20/08/2008 19:45

Join or Login to Reply
Message 45 of 79 in Discussion

Hi Hammers, thanks very much for aircon info for phase 2. For some reason I was just getting a bit stuck on that point for some reason. The new solution sounds much better given the reduced space. We have been told our aircon is going in this week so a little closer to a finish.

regards

Wysiwig



Hammers


Joined: 02/05/2008
Posts: 15


Message Posted:
21/08/2008 14:33

Join or Login to Reply
Message 46 of 79 in Discussion

Hi Kav,



Our flight wasn't too bad, delayed 1 hour, and a bit of a mix up with the luggage this end!! arrived home a couple of hours late in the end.



Hope you had a good flight.



Been looking at flights to come out again in october half term, seem abit pricey for a week though, might have to wait until easter now!!



Take care



Hammers



mackerel


Joined: 22/06/2008
Posts: 47


Message Posted:
22/08/2008 08:47

Join or Login to Reply
Message 47 of 79 in Discussion

Has anyone heard of electric and water meters being fitted in phase 2?



mackerel


Joined: 22/06/2008
Posts: 47


Message Posted:
22/08/2008 08:48

Join or Login to Reply
Message 48 of 79 in Discussion

sorry I should have addec "in the last week" to the above message.



Hammers


Joined: 02/05/2008
Posts: 15


Message Posted:
22/08/2008 10:46

Join or Login to Reply
Message 49 of 79 in Discussion





Mackerel



Yes, we had our water metre fitted last monday. But no such luck with the electric!!



Hammers



High Priest


Joined: 12/04/2008
Posts: 65


Message Posted:
22/08/2008 12:32

Join or Login to Reply
Message 50 of 79 in Discussion

Hi ,



We have had both water + electricity meters fitted after paying mid July , sorted out about 2 weeks ago . 5 visits to Beleydir + only 1 to Kibtek during July .



HP



stickle


Joined: 20/02/2008
Posts: 62


Message Posted:
22/08/2008 16:23

Join or Login to Reply
Message 51 of 79 in Discussion

Stop bragging



Bill



High Priest


Joined: 12/04/2008
Posts: 65


Message Posted:
22/08/2008 18:18

Join or Login to Reply
Message 52 of 79 in Discussion

It's ok Bill , just bring a large extension lead + 30 m of hose + you'll be fine . Or I can just hold the shower head over the edge of the balcony .

Looking forward to seeing you , when are you exactly flying out . We arrive 30 Sep .



D + L .



stickle


Joined: 20/02/2008
Posts: 62


Message Posted:
22/08/2008 18:45

Join or Login to Reply
Message 53 of 79 in Discussion

We arrive the 25th. Might have water but will bring extension lead just incase.



Bill



cooper



Joined: 23/10/2007
Posts: 213


Message Posted:
27/08/2008 19:11

Join or Login to Reply
Message 54 of 79 in Discussion

BTTT



Cooper



High Priest


Joined: 12/04/2008
Posts: 65


Message Posted:
27/08/2008 22:50

Join or Login to Reply
Message 55 of 79 in Discussion

Sorry , this is me being stupid but what does BTTT mean .



Thanks HP .



scampy


Joined: 15/01/2008
Posts: 38


Message Posted:
28/08/2008 07:50

Join or Login to Reply
Message 56 of 79 in Discussion

Hi All



I Have now moved in and have my electric



H.P can you get me a No 2 please

Also I have a really big extention lead if you want to borrow it save you bringing one over



Susie x



stickle


Joined: 20/02/2008
Posts: 62


Message Posted:
28/08/2008 07:52

Join or Login to Reply
Message 57 of 79 in Discussion

Hi, stupid back to the top.



Bill



steve g


Joined: 28/08/2008
Posts: 3


Message Posted:
28/08/2008 09:46

Join or Login to Reply
Message 58 of 79 in Discussion

Hello all, just joined this group. I am buying a penthouse apartment in block 9, phase 2.

I have just sent the final installment plus the 5% VAT via my solicitor so that I can get an invoice for it.

My partner Jean and I will be out there October half term, 25th - 1st November.

if anyone can post a coupl of photos of the apartments it would be greatly appreciated,

Regards,

Steve and Jean, Bolton Lancs



Lemtich



Joined: 15/02/2007
Posts: 357


Message Posted:
28/08/2008 10:24

Join or Login to Reply
Message 59 of 79 in Discussion

Hi

I am a little concerned about paying the 5% KDV to Kavanlar on possession as opposed to when receiving the deeds (kocan). I am not sure about the legality of this and there has been debate on other BB's about whether the regulation they are quoting to support this actually applies to property.



Not only does it remove the incentive for the builder to issue the kocan but the money sits in the builder's bank account until they pay it to the government. If they choose not to, you are still liable for the KDV despite having a receipt for the money from the builder. Some builders have gone bust with purchasers' money and they have still had to pay the KDV.



I am not suggesting this is the case with Kavanlar who are a reputable company but this 5% KDV will not be paid to the Tax Office until kocans are issued.



Also, don't forget that when you do receive the kocan you are responsible for a further 6% stamp duty (or the option of a one time payment of 3% on a property purchase) and a nominal payment to Alsancak Beledeysi.



Lem



Robbie


Joined: 20/02/2008
Posts: 39


Message Posted:
28/08/2008 10:43

Join or Login to Reply
Message 60 of 79 in Discussion

Lemtich



I asked Ilker if the Kocans are ready and he said when you have the PTP approved then he will hand over the Kocans , he told me to talk to my solicitor .

my Solicitor said they are still waiting for my PTP to come through .

I have handed over 50000 pounds so i was not really worried about the KDV , whether it sits in their bank account or not i wanted to pay it . I know what your saying about an incentive to keep them on their toes , but at the end of the day they have your 50000 pounds and you have their 2500 pounds who is the richer?







Robbie





Lemtich



Joined: 15/02/2007
Posts: 357


Message Posted:
28/08/2008 11:07

Join or Login to Reply
Message 61 of 79 in Discussion

Hi Robbie



I have my PTP and I have contacted my solicitor about acquiring a kocan. As I said, we are incredibly fortunate that Kavanlar are a reputable company with a high standard of finish and delivery.



I for one, thank my lucky stars that I chose to buy with them and not another well known company that now appear to have raised mortgages on property they have sold. I won't name names on this board but they are still advertising properties.



I suppose you pays your money and takes your choice.



Lem



Robbie


Joined: 20/02/2008
Posts: 39


Message Posted:
28/08/2008 11:38

Join or Login to Reply
Message 62 of 79 in Discussion

Lemtich



If you have PTP already i suppose its a different ball game now.



I read somewhere else because the land the apartment was built on has many owners the deed need to be split so maybe not until the all the money has been paid by all the buyers will the Kocans be released.



I suppose its just a case of sit back and wait patiently.



Robbie









kavenkoy



Joined: 10/04/2008
Posts: 300


Message Posted:
28/08/2008 17:22

Join or Login to Reply
Message 63 of 79 in Discussion

robbie



i have my ptp ,i have also been awaiting since februaury to complete the transaction and its not ready to complete .



last week i was again ready to complete ,but again others were not .



the land (certainly for 1 ) is allready parcellised ,so what can be the hold up ?



kav



just sat patiently waiting for others to complete the transaction



High Priest


Joined: 12/04/2008
Posts: 65


Message Posted:
28/08/2008 20:06

Join or Login to Reply
Message 64 of 79 in Discussion

Hi Steve + Jean ,



We live in Bromley Cross , Bolton . Bought + moved into apt 5 , block 5 or E as its now called in July . Small world , sent us an email if you wish + we canhave a chat .



Duncan + Lynn .



High Priest


Joined: 12/04/2008
Posts: 65


Message Posted:
28/08/2008 20:11

Join or Login to Reply
Message 65 of 79 in Discussion

Hi Stickle + Cooper ,



I'm probably still being stupid but I don't understand what Back to the top has got to do with anything . Durrrrrrr .



HP .



Lemtich



Joined: 15/02/2007
Posts: 357


Message Posted:
28/08/2008 20:34

Join or Login to Reply
Message 66 of 79 in Discussion

HP



Back to the top or BTTT puts the thread back up the top of the forum topic page and stops it getting shunted off the page by new threads.



Lem



High Priest


Joined: 12/04/2008
Posts: 65


Message Posted:
28/08/2008 21:18

Join or Login to Reply
Message 67 of 79 in Discussion

Oh sorry , Thanks I understand now . Hopefully BTTT . LOL .



HP



steve g


Joined: 28/08/2008
Posts: 3


Message Posted:
29/08/2008 10:10

Join or Login to Reply
Message 68 of 79 in Discussion

Hello Duncan and Lynn, we will be ( we hope) in Block 9. We should be in the apartment on the right at the top of the stairs, not sure how they number them. That block was actually reorientated from the original plan and we were buying apartment 5 initially but then Ilker offered us the apartment on the

" outside" if you understand me, which I think is number 6

We bought through Select Estates and they have promised to send photos of the apartment, in the next 48 hours. If you have the necessary equipment and expertise and the time and inclination to have a look at the apartment for us and maybe send us a couple of photos we would really appreciate it. My email address is stephengittins@hotmail.com

We are at Tonge Fold, off Bury Road.

Cheers, Steve and Jean



mackerel


Joined: 22/06/2008
Posts: 47


Message Posted:
29/08/2008 15:39

Join or Login to Reply
Message 69 of 79 in Discussion

To anyone currently around.Fatma has just told me that my apartments in phases 2,block 2 (NUMBERS 5 AND 6) now have electricity and water.

If someone could check for me I would be much obliged

Many Thanks



mackerel


Joined: 22/06/2008
Posts: 47


Message Posted:
29/08/2008 15:43

Join or Login to Reply
Message 70 of 79 in Discussion

CORRECTION- I understand that block 2 is now block E. So if anyone could check the electricity and water in block E:apartments 5 & 6 I would be much obliged.



cooper



Joined: 23/10/2007
Posts: 213


Message Posted:
29/08/2008 15:48

Join or Login to Reply
Message 71 of 79 in Discussion

Hi Steve and Jean welcome to the forum we are in Block 9 apartment 6 you must be apartment 5 so we are to be neighbours. Have sent you some pic's taken in June.



Cooper



cooper



Joined: 23/10/2007
Posts: 213


Message Posted:
29/08/2008 15:49

Join or Login to Reply
Message 72 of 79 in Discussion

Makerel Block 2 is now Block b not e



Cooper



niftyduo


Joined: 27/04/2008
Posts: 23


Message Posted:
29/08/2008 16:02

Join or Login to Reply
Message 73 of 79 in Discussion

Hi Steve & Jean,



We are block 9 no 4, below Mr Cooper, and like yourselves also from Lancashie (Rochdale). Between us three we represent half the owners of block 9. Any idea who the other three are? Although last time we were out in May one of the ground floor apartments was still up for sale.



Can't wait for Sept 13th, especially with the miserable weather in the UK, to get on sorting no 4 out, getting it cleaned and meters installed. We are back home on Oct 1st so hopefully next time we are out Oct 29th we should be able to move in.



High Priest


Joined: 12/04/2008
Posts: 65


Message Posted:
29/08/2008 19:28

Join or Login to Reply
Message 74 of 79 in Discussion

Hi Steve + Jean .



The block that changed position is 5 [ now block E ] We are no 5 [ block E ]+ have already moved in + are out again 30 Sept for 3 weeks . Alot of the stuff for apt 6 block 5 [ E ] ie opposite our door like kitchen carcasses etc had your name on ; Mr . Gittins . So unless you have changed again I think you are opposite us . It will say the address of the apt you have bought on your contract .

We only have pictures of ours + comunal stuff that Lemtich kindly posted on previos boards , if you look back you should be able to find them .

We were last out 20 July + the apt opposite ours seemed ready if it is yours .



HP .



KAVENKOY



Joined: 10/04/2008
Posts: 300


Message Posted:
30/08/2008 06:15

Join or Login to Reply
Message 75 of 79 in Discussion

just having a bit a giggle at you phase 2 ers .



do half of you know which appartments you have bought ,lol



makes me think whos paying for each others cleaning etc ?



yes 1 is now A

2 is now B



from front door looking in ,appartments to the left are 1,3,5 to the right 2,4,6



water tanks same on roof



or you could all throw keys in the pool and swap which ones you dive for ,lol



kav



just a bit of fun so dont be to mad lol