North Cyprus Tourist Board - Kavanlar Apartments Part 11
North Cyprus
North Cyprus > North Cyprus Forum > Kavanlar Apartments Part 11

Kavanlar Apartments Part 11

North Cyprus Forums Homepage

Join Cyprus44 Board | Already a member? Login

Popular Posts - List of popular topics discussed on our board.

You must be a member and logged in, to post replies and new topics.

» See All Kavanlar Apartments Threads posted so far



Lemtich



Joined: 15/02/2007
Posts: 1487

Message Posted:
25/11/2008 19:49

Join or Login to Reply
Message 1 of 118 in Discussion

Greetings



Can anyone update me on the question of Kocans for Phase 1 or 2 of this development.



Fatma emailled me a while ago to say they were ready but it all seems to have quiet lately.



Has anyone spoken to Ilker about them, I know he reads these BB's, could he enlighten us?



Lem



scampy



Joined: 15/01/2008
Posts: 982

Message Posted:
25/11/2008 20:11

Join or Login to Reply
Message 2 of 118 in Discussion

Hi Lem



Don't know the answer to that, I can ask ilker if you want when I speak to him next...



The answer to the question of the new Web site

its going to be http://www.kavanlarhomes.com



It's not up and running yet but it will be anyday now



Susie x



Lemtich



Joined: 15/02/2007
Posts: 1487

Message Posted:
25/11/2008 20:22

Join or Login to Reply
Message 3 of 118 in Discussion

If you would, Susie, I'd be very grateful.



lem



scampy



Joined: 15/01/2008
Posts: 982

Message Posted:
25/11/2008 20:34

Join or Login to Reply
Message 4 of 118 in Discussion

Hi Lem



Ok, will do and I will let you know



Susie x



bigears


Joined: 14/03/2008
Posts: 62

Message Posted:
25/11/2008 20:56

Join or Login to Reply
Message 5 of 118 in Discussion

anyone any idea whenphase 4 will be finnished. Not the date Kavanlar has put into the contracts please Sue



scampy



Joined: 15/01/2008
Posts: 982

Message Posted:
25/11/2008 21:05

Join or Login to Reply
Message 6 of 118 in Discussion

Bigears



Well I know phase 3 will be sometime in the spring

So I would give phase 4 another 6 months afterwards

But don't quote me on that, it is just a guess



Susie x (Phase 2)



bigears


Joined: 14/03/2008
Posts: 62

Message Posted:
25/11/2008 21:42

Join or Login to Reply
Message 7 of 118 in Discussion

thankyou.

Sue



scampy



Joined: 15/01/2008
Posts: 982

Message Posted:
25/11/2008 21:44

Join or Login to Reply
Message 8 of 118 in Discussion

Sue



What are the prditions from Kavanlar ??



Susie x



Lemtich



Joined: 15/02/2007
Posts: 1487

Message Posted:
25/11/2008 23:21

Join or Login to Reply
Message 9 of 118 in Discussion

They'll be ready by Christmas!



Lem



AlsancakJack



Joined: 14/08/2008
Posts: 5762

Message Posted:
25/11/2008 23:28

Join or Login to Reply
Message 10 of 118 in Discussion

Not sure whether the parcelisation process applies to blocks of apartments but I have had my Kocan for over 6 months now and finally the Land Registry have been out to measure up the plots prior to separate/individual Kocans being issued to the 4 villas on our development.

AJ



Lemtich



Joined: 15/02/2007
Posts: 1487

Message Posted:
25/11/2008 23:39

Join or Login to Reply
Message 11 of 118 in Discussion

Thank you AJ



This is something else I'm concerned about. Are kocans issued for the land plots or parcelisation?



If its land then 6 apartments are going to be on one kocan for the land that they sit on, if its parcelisation does that mean each apartment owner receives a kocan?



Has anyone had any experience of receiving a kocan for an apartment on a complex?



You don't have to have bought on Kavanlar to respond.



Lem



AlsancakJack



Joined: 14/08/2008
Posts: 5762

Message Posted:
25/11/2008 23:57

Join or Login to Reply
Message 12 of 118 in Discussion

Lem

Our Kocans were transferred from the builder to two separate plots of land and on each plot are two villas so in essence I share my Kocan with my next door neighbour. OK so we are almost there but as it stands I cannot do anything with my plot/villa without my neighbours agreement and vice verse (forgive the spelling but my latin is crap) The land registery have just been out to measure up each plot prior to issuing separate kocans. But again I cannot even begin to understand how this would apply to apartment blocks.

AJ



cooper


Joined: 23/10/2007
Posts: 3386

Message Posted:
26/11/2008 08:57

Join or Login to Reply
Message 13 of 118 in Discussion

Fellow Penthouse owners if your feeling stressed dont dispair remember this you can always -

http://www.youtube.com/watch?v=06iKj7o8p9g&feature=related



Cooper



bigears


Joined: 14/03/2008
Posts: 62

Message Posted:
26/11/2008 14:27

Join or Login to Reply
Message 14 of 118 in Discussion

scampy

not sure what prditions are!!!! not in my posting I dont think... Sue

or maybe you are asking annother sure. very popluar name!!



scampy



Joined: 15/01/2008
Posts: 982

Message Posted:
26/11/2008 15:16

Join or Login to Reply
Message 15 of 118 in Discussion

Bigears

Yes it was you



What I meant was when have Kavanlar said they are supossed to be finished



Susie x



bigears


Joined: 14/03/2008
Posts: 62

Message Posted:
26/11/2008 15:31

Join or Login to Reply
Message 16 of 118 in Discussion

April 2009.... I think. A freind of mine has asked me to find out as she is going to rent somewhere for 3 months just prior to the completion. Obviously she does not want to be sitting waiting for months on end paying a rent. Sue



scampy



Joined: 15/01/2008
Posts: 982

Message Posted:
26/11/2008 15:42

Join or Login to Reply
Message 17 of 118 in Discussion

Bigears



I think it maybe longer than that



Susie x



scampy



Joined: 15/01/2008
Posts: 982

Message Posted:
03/12/2008 16:33

Join or Login to Reply
Message 18 of 118 in Discussion

Hi Folks

Here is the link to the not yet finished web-site



http://www.kavanlarhomes.com/01/ it goes upto 11



Susie x



cooper


Joined: 23/10/2007
Posts: 3386

Message Posted:
03/12/2008 20:36

Join or Login to Reply
Message 19 of 118 in Discussion

Thanks for that Susie, is that page number 1 of 11 then? and is it going to be available in English do you know.



Cooper



scampy



Joined: 15/01/2008
Posts: 982

Message Posted:
03/12/2008 23:30

Join or Login to Reply
Message 20 of 118 in Discussion

Hi Cooper



I don't know

It's not finished yet so its only a preview, I only saw it today



Susie x



cooper


Joined: 23/10/2007
Posts: 3386

Message Posted:
04/12/2008 08:17

Join or Login to Reply
Message 21 of 118 in Discussion

Cheers Susie.



Lemtich



Joined: 15/02/2007
Posts: 1487

Message Posted:
04/12/2008 22:35

Join or Login to Reply
Message 22 of 118 in Discussion

I today received an email from Kavanlar asking for a £1000 towards the cost of the transformer on Phase 1.



This was not in our original contracts and the only reference to anything like this was about a year ago when Kavanlar proposed having a generator on site to provide back up electricity in the event of power cuts. The cost was going to be £1000 per apartment.



There were few takers and the idea was abandoned especially when the said generator turned out to be a transformer that stepped down main electricity to domestic supply.



Has anyone else in Phase 1 been contacted about this?



Lem



ebbern5


Joined: 03/06/2008
Posts: 79

Message Posted:
04/12/2008 22:50

Join or Login to Reply
Message 23 of 118 in Discussion

I got the same email today. I was told that it was a government tax issue to do with the transformer and I would not get my deeds if it was not paid.



Sounds like blackmail to me. It was not on our contract but what was on there is a clause saying we would be paid for the time we had to wait to get our appartments. About a year late.



what are they going to think for the next demand



bigears


Joined: 14/03/2008
Posts: 62

Message Posted:
05/12/2008 09:24

Join or Login to Reply
Message 24 of 118 in Discussion

Yes Lem our son in law has had the same email. It just another ploy to entortion money I think. Sue



debdebs


Joined: 22/05/2008
Posts: 285

Message Posted:
05/12/2008 15:58

Join or Login to Reply
Message 25 of 118 in Discussion

We also got the same e-mail, thought we had paid all up,but still they are after more money from us. When will it stop!



liz w



Joined: 09/10/2008
Posts: 270

Message Posted:
05/12/2008 17:51

Join or Login to Reply
Message 26 of 118 in Discussion

I said a while ago that ilker asked me about the £1000 for the transformer and I told him that it was not in our contract and as I did not have any more money he quite simply was not getting it ! He immediately pulled our contract out of a draw and found that it ,of course, was not in there . So he then put it away and hummed and hawed abit. But I told him again that I simply did not have anymore money so he is not getting it. And I was not joking, to many things climbing out the wood work ,extras for this and that and it all adds up.



I haven't heard anything else. We are on Phase 2.



smudge



Joined: 07/04/2008
Posts: 160

Message Posted:
05/12/2008 17:52

Join or Login to Reply
Message 27 of 118 in Discussion

Havent had an email from them asking for money - yet. Ebbern5 i'll email you. Maybe if we all keep in touch with each other off-forum and discuss this together we may find the best way to proceed even if we join together and take legal advice as a unit rather than individually.

BTW There is nothing in our contract to suggest such an additional payment. In the meantime i'll look on Naomi Mehmet's website to see if there is a government tax issue.



ebbern5


Joined: 03/06/2008
Posts: 79

Message Posted:
05/12/2008 20:06

Join or Login to Reply
Message 28 of 118 in Discussion

Im not paying and if we stick together we can fight this, my email is l.fine@sky.co if anyone wants to get in touch .





lou



ebbern5


Joined: 03/06/2008
Posts: 79

Message Posted:
05/12/2008 20:09

Join or Login to Reply
Message 29 of 118 in Discussion

Im not paying and if we stick together we can fight this, my email is l.fine@sky.co if anyone wants to get in touch .





lou



I saw Ilker earlier in the year and he gave me a statement with my final amount I owed , The transformer was not mentioned. I paid everything up and now this has come out of the woodwork.



kavenkoy


Joined: 10/04/2008
Posts: 1787

Message Posted:
05/12/2008 22:17

Join or Login to Reply
Message 30 of 118 in Discussion

hi lou



yes thats correct phase1 contract never mentions any transformer ,it would appear a solid gold transformer at 84k for phase1 and 2 .



the fact you have electric means kibtek have signed off the project i would have thought.



is it just a case of the cash cow needs milking again to see them through the winter ?.



i hear somewhere if the transformer taxes are not paid then the site must not have final approval ?





kav



BillyB


Joined: 19/05/2008
Posts: 436

Message Posted:
05/12/2008 22:32

Join or Login to Reply
Message 31 of 118 in Discussion

With regards to the transformer payments, this is the latest one of the scams developers are doing. If it clearly states in your contract that you dont have to pay then dont. Please bear in mind many lawyers here will advise you to pay it, if this is the case you can be sure that the lawyers are not working for your best interests but that of the developers. If you are unsure of the wording of your contract take it to the Home Buyers Pressure Group. Be polite and professional to your developer and remind them of the terms and conditions of the contract. If you pay for the transformer now, they may ask you for other payments later such as kochan hand over blackmail money. The payment for the transformer has got nothing to do with government tax or giving you the kochan. As I understand it you should recieve a seperate kochan for your apartments and a share kochan for the communal areas. Hopefully laws will change soon so we cant be blackmailed in this manner.



Lemtich



Joined: 15/02/2007
Posts: 1487

Message Posted:
05/12/2008 22:36

Join or Login to Reply
Message 32 of 118 in Discussion

Next there could be a extra bill for the bandstand, the electric gate, the large water tanks for the fire hoses etc.



Need a bit of cash, send a bill for something to the Phase 1 owners.



As for kocans, I understand these won't materialize until the previous owner of the land is satisfied that certain works are carried out by Kavanlar. As Capital Gains Tax becomes payable by Kavanlar at that point I don't see them busting a gut to do this.



Interestingly, if kocans are mentioned on any email to Fatma at Kavanlar now, there is a deafening silence.



As Kav says, Kibtek have probably already signed off Phase 1 with its transformer. Phase 2 probably need theirs paying for so they have sent out emails to both Phase 1 and 2 owners.



Lem



Lemtich



Joined: 15/02/2007
Posts: 1487

Message Posted:
05/12/2008 22:40

Join or Login to Reply
Message 33 of 118 in Discussion

BillyB, Msg 31, strangely enough this is what my solicitor suggested.



Well there's a thought!



As if!



Lem



scampy



Joined: 15/01/2008
Posts: 982

Message Posted:
06/12/2008 11:03

Join or Login to Reply
Message 34 of 118 in Discussion

Hi Lem



I have this fee in my contract (For phase 2) but there are a lot of other owner that do not,

If it's not there they basically they can't force you to pay

They can't come up with things just because they have ran out of money



If the Transformer is already in place that means it has already been paid for because Kib-tek don't give anything for free



Susie x



kavenkoy


Joined: 10/04/2008
Posts: 1787

Message Posted:
06/12/2008 15:21

Join or Login to Reply
Message 35 of 118 in Discussion

think thats very relevant scampy......if its in your contract it needs paying ,if not in contract it doesnt .



i think there must be a bix mix up with who has what in their contract ....mine doesnt so i am not confused ,the error must be in the office at kavanlar



scampy



Joined: 15/01/2008
Posts: 982

Message Posted:
06/12/2008 23:29

Join or Login to Reply
Message 36 of 118 in Discussion

Now there's a suprise

They don't know what each other is doing, let alone the contracts



Susie x



Lemtich



Joined: 15/02/2007
Posts: 1487

Message Posted:
07/12/2008 00:12

Join or Login to Reply
Message 37 of 118 in Discussion

Mine doesn't either, it does mention lots of compensation for late delivery but I suppose an an extra aircon unit or so will do the trick.



Not any more it won't, I've had quite enough of this!



Lem



ebbern5


Joined: 03/06/2008
Posts: 79

Message Posted:
07/12/2008 11:55

Join or Login to Reply
Message 38 of 118 in Discussion

Every time I mention late delivery payment I am told that it was the governments fault. Did the government pull workers off site to work on the next phase so that kavanlar could collect advance payments from new customers? I dont think so.





By the way my email address is wrong in above emails it is L.Fine@sky.com



please email me if anyone wants to discuss this off line.



lou



bigears


Joined: 14/03/2008
Posts: 62

Message Posted:
10/12/2008 09:11

Join or Login to Reply
Message 39 of 118 in Discussion

Has anyone else had his email asking for the £1000, that originally was for a genersator that never was going to appear and you had the option on it. When Kavanlar replied, you received a threat that if you do not pay up, the deeds will not be transferred?????? Sue

Off to homebuyers meeting today????



kavenkoy


Joined: 10/04/2008
Posts: 1787

Message Posted:
11/12/2008 09:37

Join or Login to Reply
Message 40 of 118 in Discussion

bigears



the solid gold transormer and magical invisible generator ,very silent and cant be seen .



bttt



kav



bigears


Joined: 14/03/2008
Posts: 62

Message Posted:
11/12/2008 13:27

Join or Login to Reply
Message 41 of 118 in Discussion

yes thats the one!!!! Sue



steveg1947


Joined: 24/03/2008
Posts: 54

Message Posted:
16/12/2008 21:50

Join or Login to Reply
Message 42 of 118 in Discussion

Hi Susie, hope you are well.

Have the beds been delivered and curtains installed now?

Have a great Christmas, see you around eEster

Steve and Jean



steveg1947


Joined: 24/03/2008
Posts: 54

Message Posted:
16/12/2008 21:51

Join or Login to Reply
Message 43 of 118 in Discussion

Hi to everyone on Phase 1, 2 maybe 3??

Wishing you all a really great Christmas and New Year.

Steve and Jean Apt 6, Block E, Phase 2



scampy



Joined: 15/01/2008
Posts: 982

Message Posted:
17/12/2008 16:14

Join or Login to Reply
Message 44 of 118 in Discussion

Hi Steveg 1947



Yes all is done and the curtains were put up today



Wishing you a very Happy Christmas and a good New Year



Susie x



steveg1947


Joined: 24/03/2008
Posts: 54

Message Posted:
18/12/2008 20:09

Join or Login to Reply
Message 45 of 118 in Discussion

Thanks Susie have aq great holiday,

Steve and Jean



wysiwyg


Joined: 12/07/2008
Posts: 33

Message Posted:
22/12/2008 23:51

Join or Login to Reply
Message 46 of 118 in Discussion

We will be out in Kavankoy 2 from Christmas to New Year. Can anyone give any clues to good places to go for New Years Eve please?



Any phase 3ers, and after if you want us to look at progress etc whilst we are out please let us know. Others did the same for us so happy to help.



We are hoping to get ours in Kavankoy 2 finished whilst we are out. Feels great after all the waiting (bought ours in April 2006.



Merry Christmas to all.



gemma


Joined: 10/08/2008
Posts: 107

Message Posted:
28/12/2008 01:16

Join or Login to Reply
Message 47 of 118 in Discussion

Merry Christmas Tony-Bev ---Cor-Tanya.



They told us the best place is in town around the harbour---big screen--area cafes. At midnight there is a fantastic firework display.



Hope you all have a great time ------ see you all soon.



Happy New Year To All Readers.



Marion & Geoff.



gemma


Joined: 10/08/2008
Posts: 107

Message Posted:
28/12/2008 01:17

Join or Login to Reply
Message 48 of 118 in Discussion

Merry Christmas Tony-Bev ---Cor-Tanya.



They told us the best place is in town around the harbour---big screen--area cafes. At midnight there is a fantastic firework display.



Hope you all have a great time ------ see you all soon.



Happy New Year To All Readers.



Marion & Geoff.



scampy



Joined: 15/01/2008
Posts: 982

Message Posted:
28/12/2008 13:45

Join or Login to Reply
Message 49 of 118 in Discussion

If anyone is planning on going into girne on New Years Eve

Be warned there will be major traffic Jams and no Parking because thats where everyone heads to

I myself will be in bed



Susie x



Hammers


Joined: 02/05/2008
Posts: 24

Message Posted:
29/12/2008 19:13

Join or Login to Reply
Message 50 of 118 in Discussion

Hi Fatboy

We hope you are keeping well.

Happy New Year.

Hammers

(your friends from across the hall in Aug)



steveg1947


Joined: 24/03/2008
Posts: 54

Message Posted:
01/01/2009 12:40

Join or Login to Reply
Message 51 of 118 in Discussion

Happy New Year to everyone on all Phases !

There was some correspondence on one of the other message boards about a suggestion that Greek Cypriots might be encouraged to claim back lands that were taken from them in 1974, and that people who had bought or were buying in the North should contact their MEP for advice and support.

I contacted the MEP's for NW UK as below and received the reply, also below.



Dear Chris Davies, Sajjad Karim, Brian Simpson, Gary Titley, David

Sumberg, Arlene McCarthy, John Whittaker, Robert Atkins and Den Dover,



I recently bought an apartment in Alsancak, Northern Cyprus.

I was aware that there had been considerable unrest in 1974 when much

Greek Cypriot land was taken by the Turkish Cypriots.

My contract tells me that the land on which the apartments are built is

not land that was taken forcefully from any Greek Cypriots but was

legitimately the property of the Construction company, Kavanlar

Construction.

I have recently been made aware of a



steveg1947


Joined: 24/03/2008
Posts: 54

Message Posted:
01/01/2009 12:43

Join or Login to Reply
Message 52 of 118 in Discussion

sorry folks, the page wont let me upload the whole letter.

Basically, the reply I got simply said that the situation in N Cyprus is not an easy one!!



I replied to that and the MEP suggested that we should lobby our MEP as a group rather than as individuals.



Any suggestions?

Steveg1947



kavenkoy


Joined: 10/04/2008
Posts: 1787

Message Posted:
01/01/2009 16:57

Join or Login to Reply
Message 53 of 118 in Discussion

hi stevie



lobby MEP for what exactly ?,i still have the lemon tree that was there when the first hole was dug in summer 05 ?



kav



Lemtich



Joined: 15/02/2007
Posts: 1487

Message Posted:
02/01/2009 00:40

Join or Login to Reply
Message 54 of 118 in Discussion

Oi, that was my lemon tree in 2005! I saw it first!



Right, its off to the European Human Court of something rights,



Give it back! You rotter!



Lem



PS. How many dyslexics does it change to make a light bulb?



kavenkoy


Joined: 10/04/2008
Posts: 1787

Message Posted:
02/01/2009 18:08

Join or Login to Reply
Message 55 of 118 in Discussion

lem



stevie may have a point if you think any two faced mep would make a difference ?



if anybody wanted to write a letter /petition and send it i would fully support it .



as for the lemon tree anybody who wants to come and take it can have it no problems .



i doubt if it would ever come down to a individual case of a lemon tree anyway ,but if it did we just deal with the issue im sure



take care



kav



wysiwyg


Joined: 12/07/2008
Posts: 33

Message Posted:
05/01/2009 00:47

Join or Login to Reply
Message 56 of 118 in Discussion

Thanks Marion and Geoff, hope you are both enjoying your New Year. Thanks for all your help. We had a great week in Alsancak. First time we stayed in apartment all went well. Will email you soon.

Wysiwigs



Kewen


Joined: 03/08/2007
Posts: 59

Message Posted:
09/01/2009 21:43

Join or Login to Reply
Message 57 of 118 in Discussion

Hi

I am looking for some advise on the stage payments. Kavanlar have asked for the stage for completed plaster work ( we are phase 4) to be paid, they have sent pictures which arn't very clear, of the inside and outside, the outside is definately not plastered and it is difficult to tell if the inside is. We thought the payment was due when the outside was plastered aswell. Grateful for any advise from fellow kavanlar buyers.



Lemtich



Joined: 15/02/2007
Posts: 1487

Message Posted:
10/01/2009 01:03

Join or Login to Reply
Message 58 of 118 in Discussion

Get your estate agent around to take photographs. Thats what they're paid for.



Lem



niftyduo


Joined: 27/04/2008
Posts: 230

Message Posted:
10/01/2009 09:04

Join or Login to Reply
Message 59 of 118 in Discussion

Hi Wendy, we can see the workman doing the outside skim on the second of 4 blocks as I write, the inside plastering will not be started until the outsides are all done. Just tell kavanlar you will arrange the payment shortly and do nothing. It is the technique we used which put them off for weeks until the realised no money had turned bup.



Kewen


Joined: 03/08/2007
Posts: 59

Message Posted:
10/01/2009 17:37

Join or Login to Reply
Message 60 of 118 in Discussion

Thanks for the info. We will contact them and the estate agent ask for pictures showing it complete and only then will we send the next payment as the agreed.



stickle


Joined: 20/02/2008
Posts: 172

Message Posted:
11/01/2009 00:15

Join or Login to Reply
Message 61 of 118 in Discussion

Going over next weekend will attempt to post after then.



scampy



Joined: 15/01/2008
Posts: 982

Message Posted:
11/01/2009 11:44

Join or Login to Reply
Message 62 of 118 in Discussion

Stickle



Everything is very quiet here right now, like a grave yard



Can anyone tell me who has that silver Matrix hire car that seems to be joyriding round phase 2 all night



Susie x



johnny p


Joined: 04/06/2008
Posts: 26

Message Posted:
29/01/2009 00:42

Join or Login to Reply
Message 63 of 118 in Discussion

hi susie how are things going with you and have you sold your flat yet ? i am coming out at the end of march for a week do you think the pool will be full and i would love to know will the weather be nice.Hhave thay put the ralling around my roof yet ?say hi to geff & marion see you soon john & karrie



niftyduo


Joined: 27/04/2008
Posts: 230

Message Posted:
29/01/2009 16:58

Join or Login to Reply
Message 64 of 118 in Discussion

Just for a laugh.... Kavanlar is telling phase 4 clients that their apartments will be ready in April!



The sad thing is that clients, if they have not been for some time, think it's a real possibilty and start planning for it.



Back at the end of Feb and can't wait



Hippo


Joined: 02/02/2007
Posts: 2070

Message Posted:
29/01/2009 17:28

Join or Login to Reply
Message 65 of 118 in Discussion

I wouldnt bother to much about Kavanlar they floated away last weekend



scampy



Joined: 15/01/2008
Posts: 982

Message Posted:
29/01/2009 17:50

Join or Login to Reply
Message 66 of 118 in Discussion

Hi Johnny P



I should be flying next Wed (fingers crossed)

Your railing were being done today

The Pool, it will be too cold to go in the pool March/April but I would think they may fill it in April

I am leaving the Apt for Kavanlar to sell it



Take care

Susie x



stickle


Joined: 20/02/2008
Posts: 172

Message Posted:
30/01/2009 15:00

Join or Login to Reply
Message 67 of 118 in Discussion

Kewen

Sorry for not replying earlier. just got out there and had to return due to family bereavement. Post your block and apartment number and I will attempt to get info to you after the 7th as I wil be going out again then



bill



Kewen


Joined: 03/08/2007
Posts: 59

Message Posted:
30/01/2009 23:10

Join or Login to Reply
Message 68 of 118 in Discussion

Hi Stickle,

Sorry to hear about your bereavement.

We are block 2 top floor no 6. (next to the tree) Would be very gratefull for an update on progress thanks.



Does anyone now the number for meps site manger as Alan nezif has left, and is no longer working for the company.



kavenkoy


Joined: 10/04/2008
Posts: 1787

Message Posted:
31/01/2009 09:02

Join or Login to Reply
Message 69 of 118 in Discussion

ring bahar or ahmet ,both good english







Direktör

Bahar Kürümo?lu

GMS : 0533 8461668 (for eng)

e-mail : bahar@mepskavankoy.com



Genel Müdür

Ahmet Azizo?lu

GSM : 0533 8667164 (for eng)

e-mail : ahmet@mepskavankoy.



Kewen


Joined: 03/08/2007
Posts: 59

Message Posted:
31/01/2009 22:38

Join or Login to Reply
Message 70 of 118 in Discussion

Thanks for that Kavenkoy, will give them a ring.



stickle


Joined: 20/02/2008
Posts: 172

Message Posted:
31/01/2009 23:45

Join or Login to Reply
Message 71 of 118 in Discussion

Take it that block two is next to Phase 2. The windows were in and the electricians were workuing on site when we left18th. will update before the 15th Feb if possible and on 16th if nort possible from trnc



Kewen


Joined: 03/08/2007
Posts: 59

Message Posted:
02/02/2009 02:01

Join or Login to Reply
Message 72 of 118 in Discussion

thank for that stickle , looking good



Kewen


Joined: 03/08/2007
Posts: 59

Message Posted:
08/02/2009 21:42

Join or Login to Reply
Message 73 of 118 in Discussion

Hi

I was wondering if anyone else has had the following email from Kavanlar.

Its a bit confusing becuase of the way its been written. Not to sure what they are saying and if its correct, as usual any advise would be appreciated.



We would like to inform you about good news received recently. TRNC government have reduced the rate of the tax reduction is on the land registry transfer fee by 75 %. Unfortunately, it is a temporary reduction with 3-month period beginning from 1st January, 2009 so only two moths left in order to take this advantage. And also in order to profit from this discount you should make all the payments to our company if you make all payments we have begin related process for transfer of title. Now it is ready to be shared if you end up your account the transfer title fee of your property can be paid with 75 % reduction. You can discuss with your advocate for further information.



cooper


Joined: 23/10/2007
Posts: 3386

Message Posted:
08/02/2009 22:02

Join or Login to Reply
Message 74 of 118 in Discussion

Hi Kewen I dont know if you are aware but there is a discount at the moment of 75% to transfer title from the Vendors name to yours explained here - http://www.hbpg-trnc.net/documents/tax_transfer.html which would give a saving of £1,125 on a £50,000 Property.



Cooper



niftyduo


Joined: 27/04/2008
Posts: 230

Message Posted:
09/02/2009 17:52

Join or Login to Reply
Message 75 of 118 in Discussion

I gather phase 4 buyers have had this email about the temperorary reduction in the cost of transfer deeds until March and asking for payment in full. Phase 4 is miles from completion and most buyers will not have received their Permission to Puchase. It the transfer of deeds a real possiblity or just another scheme of Kavanlar's to raise funding?



GailForce



Joined: 15/03/2008
Posts: 54

Message Posted:
10/02/2009 13:17

Join or Login to Reply
Message 76 of 118 in Discussion

Could anyone tell me if the pool in phase two has been filled????



liz w



Joined: 09/10/2008
Posts: 270

Message Posted:
10/02/2009 14:51

Join or Login to Reply
Message 77 of 118 in Discussion

the last I heard it was going to be the end of March, but that could change>



Liz



cooper


Joined: 23/10/2007
Posts: 3386

Message Posted:
10/02/2009 15:35

Join or Login to Reply
Message 78 of 118 in Discussion

Hi Gailforce,

Meps are hoping to get the pool filled in march ready for the warmer months ahead,

but at the moment they are finding it difficult collecting maintenance fees off some residents,who must surely have realised that there would be charges to pay when

signing their contract .

It will probably be these residents who will be the first to complain when the warmer weather is here and they can't cool off in the pool !!



liz w



Joined: 09/10/2008
Posts: 270

Message Posted:
10/02/2009 16:25

Join or Login to Reply
Message 79 of 118 in Discussion

I totally agree with you cooper. They who have not paid will also want to use the bins and so forth but why should they when they haven't paid their maintenance.



If you buy on a complex you should be prepared to pay your fees . After looking into MEPS we are very satisified with them.



Liz



stickle


Joined: 20/02/2008
Posts: 172

Message Posted:
10/02/2009 18:16

Join or Login to Reply
Message 80 of 118 in Discussion

Talkıng to MEPS yesterday. Kavanlar havestıll to fıt the pumps and electrıcs but MEPs want the pool up and runnıng for Aprıl However ıf some or many do not pay (see Meps accounts) then ıt may be dıffıcult for them to do so.



GailForce



Joined: 15/03/2008
Posts: 54

Message Posted:
10/02/2009 20:25

Join or Login to Reply
Message 81 of 118 in Discussion

Thank you.



I haven't even been contacted by the maintenance company yet. I am still in the process of trying to get my title deeds. There seems to be talk about a 75% reduction, however seem to have a lot of taxes which have been put into place, which just yet again bring up the amount.



gemma


Joined: 10/08/2008
Posts: 107

Message Posted:
11/02/2009 10:50

Join or Login to Reply
Message 82 of 118 in Discussion

Well said Cooper Liz Stickle spot on.



Gailforce---- have sent you a copy of my Meps Letter showing who has paid and who has not. Hope this is helpful



Apparently---- Anyone who has not paid up to date will not receive their Kocan. That is----- If you ever manage to get your Permission to purchase !!



GailForce



Joined: 15/03/2008
Posts: 54

Message Posted:
11/02/2009 11:45

Join or Login to Reply
Message 83 of 118 in Discussion

Thanks for that Marion really appreciate it, at least now I know how much is outstanding.



HighPriest


Joined: 02/12/2008
Posts: 11

Message Posted:
11/02/2009 23:47

Join or Login to Reply
Message 84 of 118 in Discussion

Perhaps we should ask those who have not paid why they have not paid + do they have an intention of paying . Feel free to post your comments on this site .



HighPriest


Joined: 02/12/2008
Posts: 11

Message Posted:
15/02/2009 15:01

Join or Login to Reply
Message 85 of 118 in Discussion

It sounds as if there may be a delay in filling our pool on Kavankoy 2 . We believe this really needs to be done asap to test it fully + for the water to gain heat . Can as many owners as possible put some pressure on Meps (Maintanance Company) to do this as we could be without a pool when we all visit this year + we didn't buy an apartment to have an empty pool .

Thanks .



johnny p


Joined: 04/06/2008
Posts: 26

Message Posted:
16/02/2009 01:10

Join or Login to Reply
Message 86 of 118 in Discussion

hi all

we are at the apartment end of march it would be lovely to see phase 2 finish we are up to date with our payments and looking forward to a nice sunny week.lets all push for the pool to be finish at least we know we have a good builder.Highpriest witch apartment are you in.



niftyduo


Joined: 27/04/2008
Posts: 230

Message Posted:
16/02/2009 12:49

Join or Login to Reply
Message 87 of 118 in Discussion

The problem with filling the pool starts with Kavanlar. Until the builder finishes constructing the pergola or whatever is planned for the open area and the rails around there is no point in filling the pool. The pressure needs to be applied to the builder and not MEPS in the first instance.



stickle


Joined: 20/02/2008
Posts: 172

Message Posted:
16/02/2009 19:34

Join or Login to Reply
Message 88 of 118 in Discussion

Duncan, Meps want the pool filled as soon as possible. Kavanlar have not fitted the electrics and MEPS are losing patience with the the lead negotiator and are now going throught he foreman. They are cleaning all blocks and doing minor repairs despite only some paying their fees. the site is progressing . Give me a ring on skye and I will give you the dimensions for your Pergola.



Bill



PS those who have ordered railings have had them fitted and they do provide a good finish to the roof top skyline.



PPS to anyone leaving their immersion on too long there was a lovely diplay of steam from one apartment rooftop last week. Thought at first the pool was filling up



stickle


Joined: 20/02/2008
Posts: 172

Message Posted:
16/02/2009 19:39

Join or Login to Reply
Message 89 of 118 in Discussion

Kewen. Assume you are phase threeThe block is progressing well. Windows are in. Electrics are in. Exterior is not painted the pool is cemented but one block close to the road is behind the others. Plasterers and tilers working last week and also some removal of the mounds of earth from the pool excavation. Out again on the 2nd April if that is any good



Bill



Kewen


Joined: 03/08/2007
Posts: 59

Message Posted:
16/02/2009 21:01

Join or Login to Reply
Message 90 of 118 in Discussion

Thanks Stickle, but we are on phase 4, so quite a bit behind phase 3. Thanks very much anyway, dont suppose you know if much is going on on 4. We are being pressed by Kavanlar for the payment for the plastering phase but from pictures sent to us by our estate agents 3 weeks ago the inside wasn't plastered.



stickle


Joined: 20/02/2008
Posts: 172

Message Posted:
17/02/2009 01:01

Join or Login to Reply
Message 91 of 118 in Discussion



Had a walk around phase four and there were teams of plasterers working on the site and progress was being made. However , the plastering was by no means complete. Much of the outside was being faced in some blocks and the interior on some were being progressed . Will be out again in April. if you send me details of exact apartment then I will attempt to find out out more.



Bill



HighPriest


Joined: 02/12/2008
Posts: 11

Message Posted:
17/02/2009 01:10

Join or Login to Reply
Message 92 of 118 in Discussion

Hi ,



Thanks Bill will ring you . Johnny P We are Block E , No 5 . We will email Kavanlar to put pressure on for pool .



Kewen


Joined: 03/08/2007
Posts: 59

Message Posted:
17/02/2009 09:14

Join or Login to Reply
Message 93 of 118 in Discussion

Thanks Stickle

We are phase 2 block 2, penthouse 6. At least there is something going on on that phase.



GailForce



Joined: 15/03/2008
Posts: 54

Message Posted:
19/02/2009 18:30

Join or Login to Reply
Message 94 of 118 in Discussion

Has phase two completed yet or is progress slow?



wysiwyg


Joined: 12/07/2008
Posts: 33

Message Posted:
20/02/2009 03:24

Join or Login to Reply
Message 95 of 118 in Discussion

re message 84. Hi HP not many non payers willing to talk about why they havent paid ? We have experience of being in a similar situation elsewhere and sold up as late/non maintenance payers totally ruined the atmosphere between owners, renters, paying guests etc before it ever developed - suspicion and resentment takes over very quickly. No payment, no standards, no pride - they followed like night and day.



Look at what MEPS have done on phase 1 - this proves that they are very good when the partnership is supported by all. Can any phase 1ers help us here with advice to get through this stage in the way they have? We want to see the pool filled mid March to get it balanced,clean and tested for April. Those that have paid rightly expect it but could we blame MEPs if every apartment hasnt paid to make it happen in time?



Im sure the Kavanlar team will complete the pool and surrounds soon to support MEPs efforts to get phase II up and running for us all to enjoy. :~)



kavenkoy


Joined: 10/04/2008
Posts: 1787

Message Posted:
20/02/2009 09:57

Join or Login to Reply
Message 96 of 118 in Discussion

re 95 .



yes phase1 ers pay ,at first it was hard to get all email addresses and therefore some didnt get asked for it .



meps are a great little company and anybody has a issue go speak directly with them.

at first the pool was left over the winter (partly because of debris that flies in it) and phase1 pool was filled in april to early may and i think that would be common practice as you wouldnt go in before end of may anyway.



soon as you get water ,you get bills and soon as this happens your money in your float or meps money is being used,so they are doing right not filling it yet.



of course the other thing is it may not be ready to fill ,this isnt their case but kavanlars,kavanlar again wont rush this as it wont be used ,so chill a bit .



as for your late or none payers ,we had one of those and he was sent to a place in the midlands and is now selling up.



he wont get kocan until his fees are paid anyway,get yourselves emailing each .one person ? kav



wysiwyg


Joined: 12/07/2008
Posts: 33

Message Posted:
21/02/2009 02:15

Join or Login to Reply
Message 97 of 118 in Discussion

Re 96, thanks Kav - wise words. Perhaps a little het up as we have seen this all before and want to see phase II complimenting phase I which has become a good advert through perseverance and care on all sides.



As long as people realise there is no such thing as free maintenance - it just stacks up cost and resentment. I know - chill - OK :~)



We love TRNC and feel Kavankoys could eventually be best of the apt complexes if we all pull together. Cant wait to come out again.



wysiwyg


Joined: 12/07/2008
Posts: 33

Message Posted:
21/02/2009 02:21

Join or Login to Reply
Message 98 of 118 in Discussion

Re 96, thanks Kav - wise words. Perhaps a little het up as we have seen this all before and want to see phase II complimenting phase I which has become a good advert through perseverance and care on all sides.



As long as people realise there is no such thing as free maintenance - it just stacks up cost and resentment. I know - chill - OK :~)



We love TRNC and feel Kavankoys could eventually be best of the apt complexes if we all pull together. Cant wait to come out again.



High Priest


Joined: 12/04/2008
Posts: 148

Message Posted:
25/02/2009 15:28

Join or Login to Reply
Message 99 of 118 in Discussion

Meps have informed me today that the pool on Phase 2 will now not be filled until May at the earliest . Their reason is that they are still having difficulty getting maintenance . Come on all you none payers , its in your contract + Kavanlar have said no pay no deeds .

No doubt there will be many visitors early season who want to swim ( us included ) + now we will be dissappointed .



We all have info availible on who isn't paying so if you are a none payer + you do visit remember ;



1. No swimming .

2. No using bins .

3. No using sun beds , chairs , comunal facilities .

4. Don't look at the newly planted gardens .

5. Clean your own stairways + windows .

6. Enjoy your unlit stairways .



And if you do rent out make all this clear to the Guests please .

Remember Meps will be monitoring this .



kavenkoy


Joined: 10/04/2008
Posts: 1787

Message Posted:
25/02/2009 17:09

Join or Login to Reply
Message 100 of 118 in Discussion

and re99



NO NIPPING IN PHASE 1 FOR A SWIM OR YOU WILL GET SHOT !



LOL



KAV



stickle


Joined: 20/02/2008
Posts: 172

Message Posted:
25/02/2009 18:53

Join or Login to Reply
Message 101 of 118 in Discussion

Whilst accepting that what you say HP is a reflection of my/our sentiments the pool was/is part of the inital contract with Kavanlar. As such Kavanalr should have all the fixtures and fittings in place. So in theory those who have paid the maintainence fees should be able to use the facilites. It is annoying that only some have paid the fees but many have and as such are subsidising those who have not paid. Those who have not paid may have no contact with MEPS.



MEPS appear to be making some real attempt to provide a service and as such deserve our initial support. The problem with the pool is still Kavanlar whilst the maintainence is a different issue. WE WOULD ENCOURAGE EVERYONE TO PAY TO ACHIEVE FIRST RATE SERVICE.



Bill



liz w



Joined: 09/10/2008
Posts: 270

Message Posted:
26/02/2009 18:22

Join or Login to Reply
Message 102 of 118 in Discussion

I totally agree!



kavenkoy


Joined: 10/04/2008
Posts: 1787

Message Posted:
26/02/2009 19:00

Join or Login to Reply
Message 103 of 118 in Discussion

if they havent paid because they have not had contact with meps ,they will back date the payment from the same time as yourselves.



meps are a good company and do offer a good service ,if you pay .



name and shame will come eventually on email,and front doors.



are some people aware they can pay from uk ?



see http://www.mepskavankoy.com/



kav



mackerel


Joined: 22/06/2008
Posts: 117

Message Posted:
02/03/2009 12:06

Join or Login to Reply
Message 104 of 118 in Discussion

Has anyone managed to find the apartments on Google Earth and if so how was it done.



kavenkoy


Joined: 10/04/2008
Posts: 1787

Message Posted:
02/03/2009 12:42

Join or Login to Reply
Message 105 of 118 in Discussion

yes you can see site on google earth ,few years ago .



i would think its on new version as appartments .



i followed the road along until i saw land marks and then seen site .i have it marked in my googlle as location and pin pointed .



kav



kavenkoy


Joined: 10/04/2008
Posts: 1787

Message Posted:
02/03/2009 15:27

Join or Login to Reply
Message 106 of 118 in Discussion

105



should be i dont think it will be on new google either



kav



kavenkoy


Joined: 10/04/2008
Posts: 1787

Message Posted:
02/03/2009 19:15

Join or Login to Reply
Message 107 of 118 in Discussion

mackarel



been on google earth new version and appartments are there for you to see.



im sure somebody will place the link directly for you .

interesting to see "karavas" in the description as a place where the CIA have had a listening post since the 1950s to present day .



kav



Lemtich



Joined: 15/02/2007
Posts: 1487

Message Posted:
02/03/2009 19:54

Join or Login to Reply
Message 108 of 118 in Discussion

The co-ordinates are 35 20 30,11 N and 33 11 58, 93 E



Lem



Lemtich



Joined: 15/02/2007
Posts: 1487

Message Posted:
02/03/2009 21:46

Join or Login to Reply
Message 109 of 118 in Discussion

Interesting to view the different phases of Kavanlar from the air. It appears the development is suffering from shrinkage. Phase 2 buildings are 10% smaller in area than Phase 1, phase 3 or 4, I'm not sure which, but the ones to the right of Phase 2 looking north are a good 10% smaller than Phase 2 in area.



Have a look.



http://i200.photobucket.com/albums/aa219/Lemtich/a8d394c7.jpg



Lem



kavenkoy


Joined: 10/04/2008
Posts: 1787

Message Posted:
03/03/2009 18:56

Join or Login to Reply
Message 110 of 118 in Discussion

if phase 2 ers want to they can send money to meps via this preffered bank if they are late or delayed etc etc



GARANTI BANK



SENDING DETAILS FROM ENGLAND

BENEFICIARY NAME : : Meps Trading Ltd.

A/C NO : 493-9091018

Swift : TGBATRIS

Banka Kodu : 62

IBAN : TR98 0006 2000 4930 0009 0910 18

?ube Yeri : KYRENIA / NORTH CYPRUS



scampy



Joined: 15/01/2008
Posts: 982

Message Posted:
07/03/2009 17:09

Join or Login to Reply
Message 111 of 118 in Discussion

Hi all from Aus

Hope you are all ok

Life here is really nice, and it is so clean compared to Cyprus, I couldn't believe it

And the shopping is a dream

So id driving in a civilised manner



Take care



Susie x



cooper


Joined: 23/10/2007
Posts: 3386

Message Posted:
09/03/2009 19:20

Join or Login to Reply
Message 112 of 118 in Discussion

These pic's of Phase 3 were taken yesterday by Gemma.



http://i379.photobucket.com/albums/oo235/cooper_06/Site3March014.jpg



http://i379.photobucket.com/albums/oo235/cooper_06/Site3March013.jpg



http://i379.photobucket.com/albums/oo235/cooper_06/Site3March011.jpg



http://i379.photobucket.com/albums/oo235/cooper_06/Site3March010.jpg



http://i379.photobucket.com/albums/oo235/cooper_06/Site3March006.jpg



http://i379.photobucket.com/albums/oo235/cooper_06/Site3March005.jpg



Thanks Marion



Cooper



mackerel


Joined: 22/06/2008
Posts: 117

Message Posted:
10/03/2009 07:11

Join or Login to Reply
Message 113 of 118 in Discussion

Am I out of touch or is Phase 3 going up a lot quicker than pahse 2 did as it seemed to take forever.



cooper


Joined: 23/10/2007
Posts: 3386

Message Posted:
10/03/2009 21:24

Join or Login to Reply
Message 114 of 118 in Discussion

I think its because there are only four blocks on Phase 3 opposed to 9 on Phase 2



Cooper



gemma


Joined: 10/08/2008
Posts: 107

Message Posted:
10/03/2009 22:01

Join or Login to Reply
Message 115 of 118 in Discussion



Many thanks Chris. I will have a go at doing it one of these days.





Lovely to see you both last week.



Roll on June.



Marion.



woodies


Joined: 08/03/2009
Posts: 37

Message Posted:
11/03/2009 11:28

Join or Login to Reply
Message 116 of 118 in Discussion

Thanks for the phase 3 photos.We are in block 2 apt 6. When we say we are in we should say we are hoping to be in soon. Are there any more phase three buyers out there and if so have you been given a completion date. The last date that we were given was April but this is looming fast and looking at the photos this does not seem possible. Phil & lorraine



gemma


Joined: 10/08/2008
Posts: 107

Message Posted:
11/03/2009 22:23

Join or Login to Reply
Message 117 of 118 in Discussion

Hello the Woodies. We live here full time and overlook your block. They are working very well on site but I think September would be a more realistic date.



Geoff and Marion.



cooper


Joined: 23/10/2007
Posts: 3386

Message Posted:
13/03/2009 22:18

Join or Login to Reply
Message 118 of 118 in Discussion

I am starting Kav 12 to save scrolling down.



Cooper



North Cyprus Forums Homepage

Join Cyprus44 Forums | Already a member? Login

You must be a member and logged in, to post replies and new topics.